This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $0 | $0 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | 1-HIP | HIP3 Risk Determination: Contact BPA EC Lead for risk determination | 1/1/2017 | 5/1/2017 | Concluded | Anne Creason | 8/31/2016 11:15:07 AM |
Description: The EC Lead will determine if work under this work element may be able to have full ESA-coverage (NOAA & USFWS) under the 2013 Habitat Improvement Program Biological Opinion (HIP3). The HIP3 has expanded coverage for projects that may pose a moderate to high risk of impacting an ESA-listed species or critical habitat that would normally require a Biological Assessment. For work that qualifies, projects will undergo a review by the BPA-internal Restoration Review Team (RRT). Before conceptual design commences, contact the EC lead for HIP3 consideration, instruction, and information needs and requirements for coverage eligibility. The HIP3 activity categories and risk criteria are located in the “Note” section of the work element background page here: https://www.cbfish.org/WorkElement.mvc/Summary/165 . For additional specific guidance or questions, consult the BPA EC lead or the HIP3 BO. | |||||||
B | PERMS | Obtain/Renew applicable local, state, federal and tribal environmental permits | 1/1/2017 | 5/1/2017 | Concluded | Anne Creason | 8/31/2016 11:15:07 AM |
Description: Work done to obtain permits such as Sec. 401 or 404 (including RGP process), shoreline, NPDES, or any other required federal, state, or local permits. | |||||||
C | DELIV | Confirm BPA EC Lead has necessary permits | 5/1/2017 | Concluded | Anne Creason | 8/31/2016 11:14:43 AM | |
Description: Confirm with BPA EC Lead that Kurt Fresh has provided all necessary ESA and MMPA coverage. Permits for this contract are covered by master contract (NOAA) under Plume Project. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | No | No | |||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | No | No |