2003-017-00 PI EXPANSION OF EXISTING SMOLT TRAPPING PROG NASON CK
Contract Start Date:
6/1/2006
Contract End Date:
6/23/2007
Title:
B: 157 - Operate smolt trap
Description:
Operate smolt trap in Nason Creek using procedures described in Murdoch et al 2000, except as noted to conform to site-specific needs.
WE Agreement Type:
Contracted
Deliverable Specification:
Daily counts of all species, fish size measured from at least the first 25 fish of each species captured daily, and efficiency trials conducted as numbers of fish will allow.
Quality controlled raw data in spreadsheet format; Quality controlled georeferenced summarized data in spreadsheet format
WSE Effective Budget:
$25,544
% of Total WSE Effective Budget:
41.04%
WSE Start:
06/01/2006
WSE End:
03/31/2007
WSE Completion:
12/31/2006
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 27178 (06/01/2006 - 06/23/2007) $25,544 $25,544
Work Element Budget (Current Performance Period) $25,544 $25,544

5 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Environmental compliance requirements complete 6/1/2006 6/1/2006 Concluded David Byrnes (Inactive) 5/12/2007 2:51:16 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Data Collection (trap operation) 6/1/2006 11/30/2006 Concluded David Byrnes (Inactive) 5/12/2007 2:51:15 PM
Description: Daily counts of all species, fish size measured from at least the first 25 fish of each species captured daily, and efficiency trials conducted as numbers of fish will allow. Smolt trap will be installed between 2/28/2006 and 3/1/2006 under project number 1996-040-00 for the data collection occurring during 2006.
C Input Data 12/1/2006 12/31/2006 Concluded David Byrnes (Inactive) 5/12/2007 2:51:15 PM
Description: Complete data collection input in spreadsheet format.
D DELIV Submission of Smolt trap data 12/31/2006 Concluded David Byrnes (Inactive) 5/12/2007 2:51:15 PM
Description: Daily counts of all species, fish size measured from at least the first 25 fish of each species captured daily, and efficiency trials conducted as numbers of fish will allow. Quality controlled raw data in spreadsheet format; Quality controlled georeferenced summarized data in spreadsheet format
E Install smolt trap (project #1996-040-00) 3/1/2007 3/31/2007 Concluded David Byrnes (Inactive) 5/12/2007 2:51:15 PM
Description: Smolt trap will be installed between 2/28/2007 and 3/1/2007 under project number 1996-040-00 for the data collection occuring during 2007.

Work Site ID Latitude Longitude State County Province Subbasin
3208 47.801856 -120.715875 Washington Chelan Columbia Cascade Wenatchee

Primary Focal Species:
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered); Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
Secondary Focal Species:
Trout, Bull (S. confluentus) (Threatened); Coho (O. kisutch) - Unspecified Population

""
Study Plan Name Study Plan Owner Protocol State Sample Design Name
BPA Fish and Wildlife Program Monitoring v1.0 Russell Scranton Draft Operate smolt trap - Yakama Confederated Tribes v1.0