A | 28908 | 165 | Produce Environmental Compliance Documentation | Expanded smolt trapping | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, etc.). | $2,600 | 4.18% | 01/01/2007 | 02/28/2007 |
B | 28909 | 157 | Collect/Generate/Validate Field and Lab Data | Operate smolt trap | Operate smolt trap in Nason Creek using procedures described in Murdoch et al 2000, except as noted to conform to site-specific needs. | $25,544 | 41.04% | 06/01/2006 | 03/31/2007 |
C | 28910 | 158 | Mark/Tag Animals | Fin clips for efficiency trials | Mark and release groups of chinook and steelhead for trap efficiency trials. Marks will be a small clip of the caudal fin, either upper or lower lobe. PIT tags may also be used if requested by the project sponsor. | $16,000 | 25.71% | 06/01/2006 | 12/31/2006 |
D | 28911 | 162 | Analyze/Interpret Data | Population Estimates | Analyze raw data to calculate population estimates for spring Chinook and steelhead | $6,000 | 9.64% | 06/01/2006 | 02/23/2007 |
E | 28912 | 132 | Produce Progress (Annual) Report | Annual Report | A draft annual report will be prepared and submitted no later than January 31, 2007 covering the period January 1 through December 31, 2006 according to the accompanying specifications. The document will be prepared for the Principal Investigator (Chris Jordan), and submitted to National Marine Fisheries Service (a copy will be submitted to the BPA Project Manager). | $9,000 | 14.46% | 12/01/2006 | 06/23/2007 |
F | 28913 | 119 | Manage and Administer Projects | Project Management | Perform normal duties associated with Project Management. This includes communicating with BPA and/or subcontractors, in addition to attending meetings specific to the project. Additionally, this work will cover the preparation of the new Statement of Work (SOW), fiscal accrual estimates, Biological metrics / location information. This work element will also cover time to respond to BPA, Council, or CBFWA requests specifically related to the performance and/or budget of this project. | $2,500 | 4.02% | 08/15/2006 | 02/28/2007 |
G | 28914 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $600 | 0.96% | 07/01/2006 | 06/23/2007 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Support Documentation | A: 165. Expanded smolt trapping | 02/28/2007 | 02/28/2007 | |
Submission of Smolt trap data | B: 157. Operate smolt trap | 12/31/2006 | 12/31/2006 | |
Marked Fish/Data Submission if needed | C: 158. Fin clips for efficiency trials | 12/31/2006 | 11/30/2006 | |
Population Estimate | D: 162. Population Estimates | 02/23/2007 | 03/01/2007 | |
Submit Annual report to NOAA | E: 132. Annual Report | 06/23/2007 | 05/25/2007 | |
Funding Package - Submit draft to COTR | F: 119. Project Management | 02/28/2007 | 02/28/2007 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Expanded smolt trapping | |||||||
B | 157 | Operate smolt trap | |||||||
C | 158 | Fin clips for efficiency trials | |||||||
D | 162 | Population Estimates | |||||||
E | 132 | Annual Report | |||||||
F | 119 | Project Management | |||||||
G | 185 | Periodic Status Reports for BPA |