 A165Produce Environmental Compliance DocumentationExpanded smolt trappingAssemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, etc.).
 B157Collect/Generate/Validate Field and Lab DataOperate smolt trapOperate smolt trap in Nason Creek using procedures described in Murdoch et al 2000, except as noted to conform to site-specific needs.Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered), Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)Coho (O. kisutch) - Unspecified Population, Trout, Bull (S. confluentus) (Threatened)
 C158Mark/Tag AnimalsFin clips for efficiency trialsMark and release groups of chinook and steelhead for trap efficiency trials. Marks will be a small clip of the caudal fin, either upper or lower lobe. PIT tags may also be used if requested by the project sponsor.Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered), Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)Coho (O. kisutch) - Unspecified Population
 D162Analyze/Interpret DataPopulation EstimatesAnalyze raw data to calculate population estimates for spring Chinook and steelheadChinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered), Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)Coho (O. kisutch) - Unspecified Population
 E132Produce Progress (Annual) ReportAnnual ReportA draft annual report will be prepared and submitted no later than January 31, 2007 covering the period January 1 through December 31, 2006 according to the accompanying specifications. The document will be prepared for the Principal Investigator (Chris Jordan), and submitted to National Marine Fisheries Service (a copy will be submitted to the BPA Project Manager).
 F119Manage and Administer ProjectsProject ManagementPerform normal duties associated with Project Management. This includes communicating with BPA and/or subcontractors, in addition to attending meetings specific to the project. Additionally, this work will cover the preparation of the new Statement of Work (SOW), fiscal accrual estimates, Biological metrics / location information. This work element will also cover time to respond to BPA, Council, or CBFWA requests specifically related to the performance and/or budget of this project.
 G185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.