Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
1995-027-00 EXP LAKE ROOS. STURG. RECOV. PROJECT
Contract Start Date:
4/21/2006
Contract End Date:
3/31/2007
Title:
D: 156 - Develop study plans for Lake Roosevelt White Sturgeon Recovery Project
Description:
Study plans will be developed for white sturgeon broodstock, egg, larval, and juvenile sampling and telemetry monitoring. Study plans will include maps with sample sites, lists of selected sample sites for each gear type, schedules for implementation, biological data collection protocols, sample sizes, and datasheets. See Background for complete details of study plan needs and justifications.
WE Agreement Type:
Contracted
Deliverable Specification:
Completed RM & E method and design including maps with sample sites broodstock, egg, larval, and juvenile sampling, determination of gear types, sample sizes, and biological data to collect for broodstock, egg, larval, and juvenile sampling, development of implementation schedules for adult/broodstock, egg, larval, and juvenile sampling, preparation equipment for broodstock, egg, larval, and juvenile sampling, and development of an implementation schedule for telemetry monitoring.
WSE Effective Budget:
$960
% of Total WSE Effective Budget:
0.38%
WSE Start:
WSE End:
04/30/2006
WSE Completion:
04/28/2006
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $960 $960

1 Milestones
Sort Type Title Start End Status Modified By Modified Date
A DELIV Completed study plans 4/30/2006 Concluded Deanne Pavlik-Kunkel (Inactive) 3/27/2006 9:21:57 AM
Description: Completed RM & E method and design including maps with sample sites broodstock, egg, larval, and juvenile sampling, determination of gear types, sample sizes, and biological data to collect for broodstock, egg, larval, and juvenile sampling, development of implementation schedules for adult/broodstock, egg, larval, and juvenile sampling, preparation equipment for broodstock, egg, larval, and juvenile sampling, and development of an implementation schedule for telemetry monitoring.

Implementation Metrics
None

This work element does not require Focal Species
Study Plan Name Study Plan Owner Protocol State Sample Design Name
BPA Fish and Wildlife Program Monitoring v1.0 Russell Scranton Draft

N/A

N/A