SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $723 | $0 | n/a |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | 1-HIP | HIP3 Risk Determination: Contact BPA EC Lead for risk determination | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:25:41 AM |
Description: The EC Lead will determine if work under this work element may be able to have full ESA-coverage (NOAA & USFWS) under the 2013 Habitat Improvement Program Biological Opinion (HIP3). The HIP3 has expanded coverage for projects that may pose a moderate to high risk of impacting an ESA-listed species or critical habitat that would normally require a Biological Assessment. For work that qualifies, projects will undergo a review by the BPA-internal Restoration Review Team (RRT). Before conceptual design commences, contact the EC lead for HIP3 consideration, instruction, and information needs and requirements for coverage eligibility. The HIP3 activity categories and risk criteria are located in the “Note” section of the work element background page here: https://www.cbfish.org/WorkElement.mvc/Summary/165 . For additional specific guidance or questions, consult the BPA EC lead or the HIP3 BO. | |||||||
B | VEG BMPS | Use Best Management Practices to stabilize soils and prevent spread of noxious weeds | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:25:41 AM |
Description: Use applicable BMPs to retain existing vegetation and achieve re-establishment of vegetation in disturbed areas to at least 70% of pre-disturbance levels. Visit chapter 7.3 of http://www.ecy.wa.gov/pubs/0410076.pdf for BMPs to consider for construction contracts and http://wdfw.wa.gov/publications/01330/wdfw01330.pdf for guidance on re-vegetation in the Columbia River Basin. | |||||||
C | ACTHERB | Provide BPA EC Lead with calendar year XXXX actual herbicide use form. | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:25:41 AM |
Description: Contractor submits any actual herbicide use on an approved form to the BPA Environmental Compliance Lead. The BPA EC Lead will send the form out in December of each year; it will be due January 31. Use this milestone only when you are using BPA funding to apply herbicides as part of your work. Data is reported to NOAA on a calendar year basis. | |||||||
D | LAMP | Determine if contract work could adversely affect Pacific lamprey | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:27:50 AM |
Description: Contractor will review work proposed under this contract and determine the following: 1) Will field work take place in any area where lamprey may be present? (Any tributary or subbasin where anadromous fish exist is also accessible Pacific lamprey habitat.) 2) Are there any stream disturbing activities or instream activities that could adversely impact Pacific lamprey? Examples of activities posing a threat to lamprey may include (this list is not intended to be all-inclusive): aquatic habitat improvements, fish passage improvements, culvert replacements, water diversions, altered management of water flows, dewatering of any portions of streams, or alteration of irrigation practices. If the answer is yes to BOTH 1 and 2, the contractor must implement USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf (BMPs). | |||||||
E | ESA | Report lamprey observation and catch data to USFWS by Feb. 15 | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 3/13/2017 1:18:11 PM |
Description: All contractors doing instream work (e.g., surveys, habitat improvements, electrofishing, screwtraps, etc.) in anadromous fish areas are required to annually report lamprey observations or catch, including zero, by Feb 15 for the previous calendar year’s work. A data template is available at: (https://www.cbfish.org/EfwDocument.mvc/DownloadFile/11) As per instructions on the form, email your data to christina_wang@fws.gov at US Fish and Wildlife Service and CC your COTR. For identification of lamprey life stages see page 10 of USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf. | |||||||
F | ANS | Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:27:50 AM |
Description: Aquatic invasive Species Guidance: Uniform Decontamination Procedures: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Best management guidance for boaters: http://www.westernais.org -- Aquatic Nuisance Species newsletter: http://www.aquaticnuisance.org/newsletters -- State Aquatic Invasive Species Management Plans: Oregon: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Washington: http://www.wdfw.wa.gov/publications/pub.php?id=00105 -- Montana: http://www.anstaskforce.gov/Montana-FINAL_PLAN.pdf -- Idaho: http://www.anstaskforce.gov/stateplans.php | |||||||
G | NOXIOUS | Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species | 5/1/2017 | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:27:51 AM |
Description: Prevent spread of invasive species | |||||||
H | DELIV | Environmental Compliance Documents | 4/30/2018 | Concluded | Michelle O'Malley | 2/10/2017 10:27:51 AM | |
Description: Coordinates with BPA and YN to obtain the appropriate environmental compliance documentation and permits needed to complete contract activities. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | Yes | No | n/a | ||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | Yes | No | n/a |