1996-077-02 EXP LOLO CREEK WATERSHED RESTORATION
Contract Start Date:
2/1/2018
Contract End Date:
1/31/2019
Title:
D: 38 - O'hara Creek Road improvement culvert replacement #5
Description:
This project is continuation of a road improvement project started in 2015 to reduce sediment delivery and upgrade undersized and failing tributary culverts along the O'hara Creek. This project will replace and undersized 36" culvert with a 72" culvert set to a more natural stream grade. This is not technically a barrier replacement project due to the high gradient nature of the stream, but will utilize stream simulation design in it's construction to mimic stream grade and substrate above and below the structure allowing better passage of aquatic organisms.

Work element D would be implemented with work elements B and C depending on availability of outside funding. Due to their close proximity and need for road closure, these improvements would be completed one effort, saving on mobilization efforts. If outside funding is not secured, culvert 5 will be moved into an out year project to be completed in 2019 or beyond.

The Nez Perce Tribe (NPT) and the Nez Perce - Clearwater National Forests (NPCNFs) will work as partners to implement this project. The NPT will subcontract with the NPCNFs through our partnership agreement to administer the construction contract. The NPCNFs is the lead agency and will complete all necessary environmental compliance for all aspects of this project including NEPA, ESA, and cultural resources requirements. The Nez Perce Tribe will assist with the selection of a contractor and inspection of the project.
WE Agreement Type:
Contracted
Deliverable Specification:
Improve road by replacing failing and undersized 36" culvert with a 72" culvert set to a more natural stream grade. This project will reduce both chronic sediment and potential for a road failure The project is not technically a barrier replacement project due to the high gradient nature of the stream, but will utilize stream simulation design in it's construction to mimic stream grade and substrate above and below the structure allowing better passage of aquatic organisms.
WSE Effective Budget:
$0
% of Total WSE Effective Budget:
0.00%
WSE Start:
02/01/2018
WSE End:
10/31/2018
WSE Completion:
09/01/2018
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $10,000 $0

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 2/1/2018 7/1/2018 Concluded Deborah Docherty (Inactive) 9/28/2017 7:05:23 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
B This WE will be completed depending on funding availability 7/1/2018 9/30/2018 Concluded Deborah Docherty (Inactive) 9/28/2017 7:05:23 AM
Description: This WE will be completed depending on final bid or ability to secure outside funding. If no funding is secured, the project will be pushed to an out year project to be completed in 2019 or beyond.
C DELIV O'hara Creek Road improvement culvert replacement #5 10/31/2018 Concluded Deborah Docherty (Inactive) 11/13/2017 4:24:07 PM
Description: Improve road by replacing failing and undersized 36" culvert with a 72" culvert set to a more natural stream grade. This project will reduce both chronic sediment and potential for a road failure The project is not technically a barrier replacement project due to the high gradient nature of the stream, but will utilize stream simulation design in it's construction to mimic stream grade and substrate above and below the structure allowing better passage of aquatic organisms.

Implementation Metrics
Metric Planned Actual Contractor Comments Measures HLIs
1523. Average width of treatment 30.00 0.00 Project postponed due to lack of funding. area (foot-miles) of road improved or decommissioned
area (foot-miles) of enhanced nutrients
1615. # of miles of road or trail improved in a riparian area 0.50 0.00 Project postponed due to lack of funding. miles of road or trail improved or decommissioned
1618. # of water bars installed 0 0 Project postponed due to lack of funding.
1619. # of ditch relief culverts/ cross drains installed 1 0 Project postponed due to lack of funding. # of Road Drainage Network Structures
1621. # of road stream crossing improvements (rocked ford) 1 0 Project postponed due to lack of funding. # of Road Drainage Network Structures
1622. # of regradation and/or terracing treatments 0 0 Project postponed due to lack of funding. # of erosion control structures

Work Site ID Latitude Longitude State County Province Subbasin
36523 46.053398 -115.520553 Idaho Idaho Mountain Snake Clearwater

Primary Focal Species:
Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed); Lamprey, Pacific (Entosphenus tridentata); Cutthroat Trout, Westslope (O. c. lewisi); Freshwater Mussels; Trout, Bull (S. confluentus) (Threatened); Trout, Rainbow (Oncorhynchus mykiss)

This work element does not require RM&E metadata