This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $10,000 | $0 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 2/1/2018 | 7/1/2018 | Concluded | Deborah Docherty (Inactive) | 9/28/2017 7:05:23 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | This WE will be completed depending on funding availability | 7/1/2018 | 9/30/2018 | Concluded | Deborah Docherty (Inactive) | 9/28/2017 7:05:23 AM | |
Description: This WE will be completed depending on final bid or ability to secure outside funding. If no funding is secured, the project will be pushed to an out year project to be completed in 2019 or beyond. | |||||||
C | DELIV | O'hara Creek Road improvement culvert replacement #5 | 10/31/2018 | Concluded | Deborah Docherty (Inactive) | 11/13/2017 4:24:07 PM | |
Description: Improve road by replacing failing and undersized 36" culvert with a 72" culvert set to a more natural stream grade. This project will reduce both chronic sediment and potential for a road failure The project is not technically a barrier replacement project due to the high gradient nature of the stream, but will utilize stream simulation design in it's construction to mimic stream grade and substrate above and below the structure allowing better passage of aquatic organisms. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1523. Average width of treatment | 30.00 | 0.00 | Project postponed due to lack of funding. |
area (foot-miles) of road improved or decommissioned area (foot-miles) of enhanced nutrients |
|
1615. # of miles of road or trail improved in a riparian area | 0.50 | 0.00 | Project postponed due to lack of funding. | miles of road or trail improved or decommissioned | |
1618. # of water bars installed | 0 | 0 | Project postponed due to lack of funding. | ||
1619. # of ditch relief culverts/ cross drains installed | 1 | 0 | Project postponed due to lack of funding. | # of Road Drainage Network Structures | |
1621. # of road stream crossing improvements (rocked ford) | 1 | 0 | Project postponed due to lack of funding. | # of Road Drainage Network Structures | |
1622. # of regradation and/or terracing treatments | 0 | 0 | Project postponed due to lack of funding. | # of erosion control structures |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
36523 | 46.053398 | -115.520553 | Idaho | Idaho | Mountain Snake | Clearwater |