This page presents detailed associations and definitions for this Work Element. Information on how this Work Element is being used in BPA field work is also included.
Metric | Metric Association Status | Last Comment Date | Last Comment By | Unit Type | FY Start | FY End | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1523: Average width of treatment | Active | number | 2010 | Required | Yes | Yes | No | |||||
ITS Action Category:
Fine Sediment
ITS Metric:
Size of sediment treatment
|
||||||||||||
1615: # of miles of road or trail improved in a riparian area | Active | number | 2011 | Required | Yes | Yes | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | |||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1616: # of miles of road or trail improved in an estuarine area | Active | number | 2011 | Required | Yes | Yes | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | |||
1617: # of miles of road or trail improved in an upland area | Active | number | 2011 | Required | Yes | Yes | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | |||
1618: # of water bars installed | Active | number | 2011 | Required | Yes | Yes | Yes | C.6.e.3 | Erosion / sediment control installations | |||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1619: # of ditch relief culverts/ cross drains installed | Active | number | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1620: # of improved road crowns | Active | number | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1621: # of road stream crossing improvements (rocked ford) | Active | number | 2011 | Required | Yes | Yes | Yes | C.2.h.2 | Number of rocked fords placed | |||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1622: # of regradation and/or terracing treatments | Active | number | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1623: # of other sediment control measures | Active | number | 2011 | Required | Yes | Yes | Yes | C.6.e.3 | Erosion / sediment control installations | |||
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
||||||||||||
1394: # of miles of road improved or decommissioned in a riparian area | Expired | number | 2005 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
|
||||||||||||
1395: # of miles of road improved or decommissioned in an upland area | Expired | number | 2005 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
1486: # of miles of trail improved or decommissioned in a riparian area | Expired | number | 2009 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
|
||||||||||||
1487: # of miles of trail improved or decommissioned in an upland area | Expired | number | 2009 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
1534: # of miles of road improved or decommissioned in an estuarine area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
1557: # of miles of trail improved or decommissioned in an estuarine wetland area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction | ||
1558: # of miles of trail improved or decommissioned in an estuarine non-wetland area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction |
CBFish Metric Set | ||||||||||||||||
# of Road Drainage Network Structures (Required) |
|
|||||||||||||||
miles of road or trail improved or decommissioned (Required) |
|
Yes
This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.
Number of active contracts using Work Element #38 by FY
Top 5 BPA Project Managers using this Work Element: | ||
---|---|---|
(by number of current contracts) | ||
Tracy Hauser | 24 | |
Andre L'Heureux (Inactive) | 22 | |
Virgil Watts III | 18 | |
Sandra Fife (Inactive) | 17 | |
Joe Deherrera (Inactive) | 15 | |
Average Work Element Budget: | $35,897 | |
Average Duration: | 9 months |