Work Element 38: Improve Road for Instream Habitat Benefits - Published
WE Name:
38. Improve Road for Instream Habitat Benefits (Improve Road)
Work Category:
Habitat - Habitat Improvement
WE Agreement Type:
Contracted
Status:
Active
Definition:
Work designed to eliminate or reduce erosion, sediment, and/or toxic run-off from reaching streams, rivers, or wetlands from roads or trails currently in use. This includes road projects that reduce or eliminate inter-basin transfer of water, placement of structures to contain/ control runoff from roads or trails, road or trail reconstruction or reinforcement, surface and peak-flow drainage improvements, and roadside vegetation. These roads may be in or extend into the riparian zone.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
construction/implementation
Sort Sequence:
5.08
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes


Deliverable Status:
Required
Default Deliverable Desc:
Passable Road
Potential Deliverables:
  • Miles of road improved

  • Rule 1 (Environmental Compliance): ESA, cultural resources, permitting, and other environmental compliance work must be split out as a separate work element under 165. Produce Environmental Compliance Documentation.

    Example:

    WE: 38. Improve Road for Instream Habitat Benefits
    WE Title: FS Road #1845 at Danson Creek
    WE Description: Grade and gravel 2.3 miles of FS Road 1845 at Danson Creek.

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Provide Environmental Compliance documentation to BPA for road improvement activities

  • Rule 2 (Location of Work): You may lump multiple locations under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management. Note that different locations do not require multiple Produce Environmental Compliance Documentation work elements.

    Examples:

    Option 1 (lumping):

    WE: 38. Improve Road for Instream Habitat Benefits
    WE Title: Improve FS roads in Danson Creek subbasin
    WE Description: Grade and gravel up to 11 miles of FS roads in the Danson Creek subbasin.

    Option 2 (splitting):

    WE: 38. Improve Road for Instream Habitat Benefits
    WE Title: Grade & gravel FS Road #1845 at Danson Creek
    WE Description: Grade and gravel 2.3 miles of FS Road 1845 at Danson Creek to reduce erosion.

  • Rule 3 (Metrics): If you are doing multiple activities/projects at one location, be sure to list them in separate WEs so that we can capture the different metrics.

    Example:

    WE: 38. Improve Road for Instream Habitat Benefits
    WE Title: Improve FS Road #1845 at Danson Creek
    WE Description: Grade and gravel 2.3 miles of FS Road 1845 at Danson Creek.

    WE: 33. Decommission Road/Relocate Road
    WE Title: Decommission FS Road #322 at Kane Creek
    WE Description: Scarify and rip 4.2 miles of FS Road 322 at Kane Creek.

    WE: 184. Install Fish Passage Structure
    WE Title: Replace Danson Creek culvert #3
    WE Description: Replace Danson Creek culvert #3 with 1 pipe arch culvert able to withstand 100-year event.

    WE: 47. Plant Vegetation
    WE Title: Erosion control at Danson Creek with vegetation
    WE Description: Hydro-seed 1 acre of cut bank at Danson Creek RM 11 to control erosion.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Identify roads to be improved
Suggested
No
Ensure permits are in place
Suggested
No
Write MOU
Suggested
No
Get final MOU signed
Suggested
No
Identify methods
Suggested
No
Complete bid package
Suggested
No
Hire field crew
Suggested
No
Select equipment operator(s)
Suggested
No
Perform road improvement work
Suggested
No
Follow-up inspection/sign-off on work
Suggested
No


17 Metrics Associated With Work Element 38: Improve Road for Instream Habitat Benefits

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1523: Average width of treatment Active number 2010 Required Yes Yes No
ITS Action Category:
Fine Sediment
ITS Metric:
Size of sediment treatment
1615: # of miles of road or trail improved in a riparian area Active number 2011 Required Yes Yes Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1616: # of miles of road or trail improved in an estuarine area Active number 2011 Required Yes Yes Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1617: # of miles of road or trail improved in an upland area Active number 2011 Required Yes Yes Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1618: # of water bars installed Active number 2011 Required Yes Yes Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1619: # of ditch relief culverts/ cross drains installed Active number 2011 Required Yes Yes No
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1620: # of improved road crowns Active number 2011 Required Yes Yes No
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1621: # of road stream crossing improvements (rocked ford) Active number 2011 Required Yes Yes Yes C.2.h.2 Number of rocked fords placed
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1622: # of regradation and/or terracing treatments Active number 2011 Required Yes Yes No
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1623: # of other sediment control measures Active number 2011 Required Yes Yes Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1394: # of miles of road improved or decommissioned in a riparian area Expired number 2005 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
1395: # of miles of road improved or decommissioned in an upland area Expired number 2005 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1486: # of miles of trail improved or decommissioned in a riparian area Expired number 2009 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
1487: # of miles of trail improved or decommissioned in an upland area Expired number 2009 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1534: # of miles of road improved or decommissioned in an estuarine area Expired number 2010 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1557: # of miles of trail improved or decommissioned in an estuarine wetland area Expired number 2010 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1558: # of miles of trail improved or decommissioned in an estuarine non-wetland area Expired number 2010 2010 Required Yes No Yes C.6.c.2 Miles of road treated for drainage system improvements and reconstruction

CBFish Metric Set
# of Road Drainage Network Structures (Required)
Type of Road Drainage Network Structures Metric ID and Name Required?
Ditch Relief Culverts/ Cross Drains 1619. # of ditch relief culverts/ cross drains installed Required
Improved Road Crowns 1620. # of improved road crowns Required
Road Stream Crossing Improvements (Rocked Ford) 1621. # of road stream crossing improvements (rocked ford) Required
Other sediment control measures 1623. # of other sediment control measures Required
miles of road or trail improved or decommissioned (Required)
Habitat Zone Metric ID and Name Required?
Riparian 1615. # of miles of road or trail improved in a riparian area Required
Estuarine 1616. # of miles of road or trail improved in an estuarine area Required
Upland 1617. # of miles of road or trail improved in an upland area Required

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.2 Fish Passage Improvement
        C.2.h.1 Rocked ford - road stream crossing
            C.2.h.2 Number of rocked fords placed
1621: # of road stream crossing improvements (rocked ford)
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.c.1 Road drainage system improvements and reconstruction
            C.6.c.2 Miles of road treated for drainage system improvements and reconstruction
1394: # of miles of road improved or decommissioned in a riparian area
1395: # of miles of road improved or decommissioned in an upland area
1486: # of miles of trail improved or decommissioned in a riparian area
1487: # of miles of trail improved or decommissioned in an upland area
1534: # of miles of road improved or decommissioned in an estuarine area
1557: # of miles of trail improved or decommissioned in an estuarine wetland area
1558: # of miles of trail improved or decommissioned in an estuarine non-wetland area
1615: # of miles of road or trail improved in a riparian area
1616: # of miles of road or trail improved in an estuarine area
1617: # of miles of road or trail improved in an upland area
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.e.1 Erosion control structures installed
            C.6.e.3 Erosion / sediment control installations
1618: # of water bars installed
1623: # of other sediment control measures

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1
Location Guidance:
Identify point where work will take place or approximate mid-point of road or trail section to be improved. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #38 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Tracy Hauser 24
Andre L'Heureux (Inactive) 22
Virgil Watts III 18
Sandra Fife (Inactive) 17
Joe Deherrera (Inactive) 15
Average Work Element Budget: $35,897
Average Duration: 9 months