This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
260 | Identify the number of "other" treatments implemented in the treated area. Treated is defined as the construction footprint that provides benefit to focal species. -Other sediment control measures: Other structures used to manage road or trail drainage networks and decrease erosion. |
38 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
38. Improve Road for Instream Habitat Benefits | Active | Work designed to eliminate or reduce erosion, sediment, and/or toxic run-off from reaching streams, rivers, or wetlands from roads or trails currently in use. This includes road projects that reduce or eliminate inter-basin transfer of water, placement of structures to contain/ control runoff from roads or trails, road or trail reconstruction or reinforcement, surface and peak-flow drainage improvements, and roadside vegetation. These roads may be in or extend into the riparian zone. | 2011 | 260 | Identify the number of "other" treatments implemented in the treated area. Treated is defined as the construction footprint that provides benefit to focal species. -Other sediment control measures: Other structures used to manage road or trail drainage networks and decrease erosion. |
Required | Yes | Yes | Yes | C.6.e.3 | Erosion / sediment control installations | |
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.e.1 Erosion control structures installed C.6.e.3 Erosion / sediment control installations |
38. Improve Road for Instream Habitat Benefits |