This page shows which work elements use this metric.
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
33. Decommission Road/Relocate Road | Expired | Any activity that makes a road or trail unusable including adding berms, pits, boulders or logs, and/or ripping, scarifying, recontouring, or obliterating the road or trail with heavy equipment that may involve re-contouring the slope. Also use for building a road or trail in a more appropriate location to replace a decommissioned road or trail. If decommissioning by planting vegetation or seeding use 47. Plant Vegetation. If removal of fish barrier (e.g., culvert) is included, also use 85. Remove/Breach Fish Passage Barrier, or 184. Install Fish Passage Structure. If work also involves channel realignment, use 30. Realign, Connect, and/or Create Channel in addition to this work element. | 2005 | 2010 | 20 | Riparian is defined as above the ordinary high water mark of the stream and within the flood plain of streams. To determine total miles treated, we will sum the upland and riparian mileage. | Required | Yes | No | Yes | C.6.d.2 | Miles of road closed / abandoned |
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
|
||||||||||||
38. Improve Road for Instream Habitat Benefits | Expired | Work designed to eliminate or reduce erosion, sediment, and/or toxic run-off from reaching streams, rivers, or wetlands from roads or trails currently in use. This includes road projects that reduce or eliminate inter-basin transfer of water, placement of structures to contain/ control runoff from roads or trails, road or trail reconstruction or reinforcement, surface and peak-flow drainage improvements, and roadside vegetation. These roads may be in or extend into the riparian zone. | 2005 | 2010 | 20 | Riparian is defined as above the ordinary high water mark of the stream and within the flood plain of streams. To determine total miles treated, we will sum the upland and riparian mileage. | Required | Yes | No | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction |
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of road removed in riparia
|
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.c.1 Road drainage system improvements and reconstruction C.6.c.2 Miles of road treated for drainage system improvements and reconstruction |
38. Improve Road for Instream Habitat Benefits |
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.d.1 Road closure / abandonment C.6.d.2 Miles of road closed / abandoned |
33. Decommission Road/Relocate Road |