This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
254 | The length of road or trail improved in an upland area (in miles). To calculate the length in miles, divide the total length (in feet) of road or trail improved by 5,280 feet/mile. -Upland: Habitat upslope of the riparian and instream habitat zone with non-hydrophilic plants, unless part of an isolated wetland, which occurs outside the hyporheic, or floodplain/riparian zone. |
38 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
38. Improve Road for Instream Habitat Benefits | Active | Work designed to eliminate or reduce erosion, sediment, and/or toxic run-off from reaching streams, rivers, or wetlands from roads or trails currently in use. This includes road projects that reduce or eliminate inter-basin transfer of water, placement of structures to contain/ control runoff from roads or trails, road or trail reconstruction or reinforcement, surface and peak-flow drainage improvements, and roadside vegetation. These roads may be in or extend into the riparian zone. | 2011 | 254 | The length of road or trail improved in an upland area (in miles). To calculate the length in miles, divide the total length (in feet) of road or trail improved by 5,280 feet/mile. -Upland: Habitat upslope of the riparian and instream habitat zone with non-hydrophilic plants, unless part of an isolated wetland, which occurs outside the hyporheic, or floodplain/riparian zone. |
Required | Yes | Yes | Yes | C.6.c.2 | Miles of road treated for drainage system improvements and reconstruction |
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.c.1 Road drainage system improvements and reconstruction C.6.c.2 Miles of road treated for drainage system improvements and reconstruction |
38. Improve Road for Instream Habitat Benefits |