This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $7,500 | $0 | Reports scheduled for completion on next contract due to COVID-19 and previous staffing/duty changes |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | RMET1 | RM&E Technical: Prepare for RM&E Technical Report. Review the revised (2014) guidance & template | 4/15/2019 | 6/15/2019 | Concluded | Corrie Veenstra (Inactive) | 3/1/2019 5:12:52 PM |
Description: [DELETE THIS MILESTONE IF YOUR PROJECT DOES NOT INCLUDE ANY RM&E WORK ELEMENTS AND DOES NOT NEED TO PRODUCE AN RM&E TECHNICAL REPORT] Review the newly-revised guidance & template for your RME Technical Report. BPA Fish and Wildlife project sponsors who have the following work elements in their contracts are required to complete a RM&E technical report: 156 Develop RM&E Methods and Designs, 157 Collect/Generate/Validate Field and Lab Data, 158 Mark and Tag Animals, and/or 162 Analyze/Interpret Data. Reports must show cumulative results and synthesis for the duration data collection/analysis studies. Final RME reports are due in March to align with regulatory reporting timelines. (Milestone start/end: August 1 - September 14) | |||||||
B | RMET3 | RM&E Technical: Upload finalized RM&E Technical Report (MS Word) for BPA to publish | 4/15/2019 | 4/14/2020 | Active | Corrie Veenstra (Inactive) | 3/1/2019 5:12:52 PM |
Description: [DELETE THIS MILESTONE IF YOUR PROJECT DOES NOT INCLUDE ANY RM&E WORK ELEMENTS AND DOES NOT NEED TO PRODUCE AN RM&E TECHNICAL REPORT] Address any BPA comments on the draft and re-upload finalized report into the Pisces Attachments tab as an MS Word document as a "Technical, draft." (Note: This MS Word format is a change in policy. BPA staff will now convert it to a PDF.) (Milestone start/end: Jan 16 - Mar 15) | |||||||
C | DELIV | Completed Annual Report | 4/14/2020 | Active | Corrie Veenstra (Inactive) | 3/1/2019 5:12:52 PM | |
Description: The Deliverable is considered complete when the final report is posted. It usually takes BPA 30-45 days to post the final PDF version of a report. This milestone's end date should therefore be 45 days after the final version is uploaded in Pisces. You will receive an email from BPA confirming that your report has been finalized and posted to the web. Mark this milestone complete when you have confirmed your final report has been posted. If you do not receive such an email after 45 days, contact your COTR. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1768. Start date of reporting period | 4/14/2018 | ||||
1769. End date of reporting period | 4/15/2019 |