This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
2. Amendment 001 (04/01/2018 - 03/31/2020) | $26,500 | $10,000 | ||
3. Amendment 002 (04/01/2018 - 06/30/2020) | $9,500 | $10,000 | ||
Work Element Budget (Current Performance Period) | $9,500 | $10,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | Acquire post project construction aerial photo images: PA-3 | 11/1/2018 | 4/1/2019 | Concluded | Andre L'Heureux (Inactive) | 11/15/2019 11:15:18 AM | |
Description: Acquire, process and catalog construction images of installed habitat structures, supplemental wood-loading, and other features to support as-built submittals, and post-construction monitoring and performance evaluations. | |||||||
B | Acquire aerial images for pre-post habitat conditions at project implementation sites: Tucannon Habiatat Programmatic | 11/1/2018 | 2/28/2020 | Concluded | Andre L'Heureux (Inactive) | 11/15/2019 11:15:18 AM | |
Description: Coordinate the collection of aerial photo images using CTUIR staff. Format images that can be used by SRSRB and CTUIR staff, or other Programmatic Habitat project partners. | |||||||
C | Produce Visual Aids | 12/31/2018 | 6/15/2020 | Concluded | Andre L'Heureux (Inactive) | 11/7/2019 9:12:53 AM | |
Description: Work with Programmatic partners, project proponents and landowners to develop video productions that can be used in public outreach activities and displayed on the Tucannon River Website. | |||||||
D | DELIV | Final Edited Outreach Materials On Website | 6/30/2020 | Concluded | Andre L'Heureux (Inactive) | 11/7/2019 9:12:53 AM | |
Description: Completed video documentation of projects edited and uploaded to the Tucannon Website. In total we plan to 5-10 projects completed in 2018-19 time frame. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1447. # of students reached | 40 | 10 | people educated or contacted | ||
1448. # of general public reached | 250 | 25 | people educated or contacted | ||
1449. # of teachers reached | 5 | 1 | people educated or contacted |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
30129 | 46.230876 | -117.713382 | Washington | Columbia | Columbia Plateau | Tucannon |
32341 | 46.434219 | -117.735447 | Washington | Columbia | Columbia Plateau | Tucannon |
34415 | 46.459134 | -117.850944 | Washington | Columbia | Columbia Plateau | Tucannon |
34474 | 46.384212 | -117.696576 | Washington | Columbia | Columbia Plateau | Tucannon |