This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $26,000 | $26,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 7/1/2019 | 7/31/2019 | Concluded | Jamie Cleveland (Inactive) | 2/7/2019 10:56:47 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | Spring Startup Functions | 4/1/2020 | 4/30/2020 | Concluded | Jamie Cleveland (Inactive) | 2/7/2019 10:56:47 AM | |
Description: Stream clearance structures and fish passage variables are evaluated. Sites may be surveyed, and data collected. Landowner communication is initiated as necessary for work during low water periods. | |||||||
C | Seasonal Inspections and Maintenance | 7/1/2019 | 6/30/2020 | Concluded | Jamie Cleveland (Inactive) | 2/7/2019 10:56:47 AM | |
Description: Site surveys and data collection may be conducted. Potential structural issues with fish passage, barriers, are evaluated as per WDFW inventory protocols. Any necessary repairs are made to ensure maximum fish benefit. | |||||||
D | Fall Annual Inspections | 8/1/2019 | 10/31/2019 | Concluded | Jamie Cleveland (Inactive) | 4/22/2019 1:33:23 PM | |
Description: During low water periods, late summer into fall (August - October) fishways are surveyed to evaluate structural integrity, ware, and overall condition. These inspections assist in budget projections for future funding requests. A record of each inspection is kept on file. Potential structural issues with fish passage, barriers, are evaluated as per WDFW inventory protocols. | |||||||
E | DELIV | O&M Lower Columbia River Tributary Fishway | 6/30/2020 | Concluded | Jamie Cleveland (Inactive) | 2/7/2019 10:56:47 AM | |
Description: This operation and maintenance schedule for the 16 identified fishways includes: • Pre-season inspections and setup ensuring optimal operation • Seasonal inspections and maintenance • Repair and/or replace key fishway components such as gate valves, walkway grating, and stoplogs • Maintaining access roads and trails to the fishways • Coordinating and setup for winter operation where needed maintaining • Site inspection and evaluation and documenting needed repairs or replacements |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
92220 | 45.995051 | -122.681 | Washington | Cowlitz | Lower Columbia | Kalama |
92221 | 45.994382 | -122.679799 | Washington | Cowlitz | Lower Columbia | Kalama |
92222 | 46.194668 | -122.871147 | Washington | Cowlitz | Columbia River Estuary | Cowlitz |
92223 | 46.255825 | -122.979011 | Washington | Cowlitz | Columbia River Estuary | Cowlitz |
92224 | 46.258881 | -122.975205 | Washington | Cowlitz | Columbia River Estuary | Cowlitz |
92225 | 45.93819 | -122.582733 | Washington | Clark | Lower Columbia | Lewis |
92226 | 45.616047 | -122.20092 | Washington | Skamania | Lower Columbia | Washougal |
92227 | 45.737793 | -121.805504 | Washington | Skamania | Columbia Gorge | Wind |
92228 | 45.745617 | -121.812485 | Washington | Skamania | Columbia Gorge | Wind |
92229 | 46.231785 | -123.148186 | Washington | Cowlitz | Columbia River Estuary | Elochoman |
92230 | 45.995358 | -122.687127 | Washington | Cowlitz | Lower Columbia | Kalama |
92231 | 45.938202 | -122.627525 | Washington | Cowlitz | Lower Columbia | Lewis |
92232 | 45.938606 | -122.627388 | Washington | Cowlitz | Lower Columbia | Lewis |
92233 | 46.203529 | -123.163345 | Washington | Cowlitz | Columbia River Estuary | Elochoman |
92234 | 46.204231 | -123.164368 | Washington | Cowlitz | Columbia River Estuary | Elochoman |
92235 | 46.005713 | -122.702946 | Washington | Cowlitz | Lower Columbia | Kalama |