SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $9,000 | $9,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 2/1/2020 | 6/1/2020 | Concluded | Jamie Cleveland (Inactive) | 11/18/2019 11:17:47 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | Final metrics | Materials for structure composition obtained (procurement of wood posts, logs, boughs or whips, etc.) | 6/1/2020 | 10/31/2020 | Concluded | Jamie Cleveland (Inactive) | 1/2/2020 11:43:45 AM |
Description: Construction materials sourced and acquired: transported and staged on location or in secured areas adjacent to the project site. Obtain wood post material and branches from Tribal timber harvesting/thinning projects and/or collect materials with necessary permits on tribally owned property. | |||||||
C | Construction of BDA/PALS begins | 8/1/2020 | 10/31/2020 | Concluded | Jamie Cleveland (Inactive) | 12/12/2019 10:49:41 AM | |
Description: Implement the design (WE H) to construct up to 6 BDA and/or PALS within the Lost-Loony Creek project area. | |||||||
D | DELIV | Improved habitat function, complexity and structure: installed BDAs functioning as designed in Lost-Loony Creek | 1/29/2021 | Concluded | Jamie Cleveland (Inactive) | 11/18/2019 11:17:47 AM | |
Description: Construct and install a series of Beaver Dam Analogs (BDAs) and/or Post Assisted Log Structures (PALS) within the riparian exclusion fence along Lost-Loony Creek to: a) create more complex habitat; b) elevate the surrounding water table; c) restore proper riparian function; and d) promote floodplain connectivity within the project reach in Lost-Loony Creek. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1387. # of miles of stream with improved complexity | 0.13 | 0.13 | miles of stream with improved complexity | Habitat Miles | |
1389. Start latitude of treated stream reach | 48.461290 | 48.461290 | |||
1390. End latitude of treated stream reach | 48.464476 | 48.464476 | |||
1391. Start longitude of treated stream reach | -119.037483 | -119.037483 | |||
1392. End longitude of treated stream reach | -119.034186 | -119.034186 | |||
1547. # of miles of stream treated with spawning gravel | 0.00 | 0.00 | miles of stream treated with spawning gravel | ||
1587. # of log weir structures installed for only complexity | 3 | 3 | structures installed | ||
1748. # of pools created for only complexity | 3 | 3 | pools created |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
97517 | 48.463702 | -119.036179 | Washington | Okanogan | Intermountain | Sanpoil |