2010-077-00 EXP TUCANNON (TUMALUM) BUILD: PASSAGE AND COMPLEXITY
Contract Start Date:
4/1/2022
Contract End Date:
12/31/2024
Title:
D: 100 - Site Preparation, Materials Management, Field Engineering, Quality Assurance, Construction Oversight: Tumalum
Description:
Overview: At the outset of this contract term (Apr-Jun), the NPT and SRSRB staff will supervise and manage initial work-site preparation, access point development, material acquisitions, staging for implementation, and if possible, the implementation of preliminary components of the culvert replacement project design that can be completed outside of the wetted channel and not during the in-water work period:
(a) Completion of final design revisions may continue contemporaneously with on-site preconstruction activities early in this contract period;
(b) Project construction in 2022 to be completed by a subcontracted construction crew, awarded as a subcontract following competitive solicitation;
(c) Solicitation and bids for construction materials in support of design features will be completed by Jun 2022, and implementation scheduled to begin in Jul 2022; and
(d) Delayed or additional phases of the overall planned project construction activities are likely to extend into the subsequent (FY23) contract period to be completed during the Summer 2023 work window.

Contractor is encouraged to initiate pre-construction activities early in this contract period: to organize construction planning and to consider implementation logistics and likely construction requirements associated with the scheduled build-period of the project design (beginning as early as Apr 2022). Construction management will continue throughout the contract term, contemporaneously with pre-construction activities that are expected to begin at the start of this contract period, during construction preparation, and throughout the installation of design features at Tumalum:

1) Develop and review public bid document for solicitation of construction sub-contractor contracts; review bid submittals, and select contractor(s);

2) Where feasible and as clearances are obtained: a) prepare projected construction access points and material or equipment staging areas; and b) if cleared, initiate preliminary or phased components of the design build-out, that can be completed prior to the in-water work-window period, in support of the construction of the culvert replacement project at Tumalum during the Summer of 2022 and 2023;

3) Source and plan the acquisition of construction materials needed for habitat features and restoration actions, across the multiple phased locations of the overall project area (PA-17). Secure and, as necessary, transport trees (large wood) and other construction materials to pre-arranged storage locations, to support construction needs and future implementation planning; and

4) Provide field engineering and construction inspections to ensure sites or structures are being built to design standards. Review construction notes and submit as-built drawing following construction.

Notes: (1) Construction management will be provided for both preliminary activities, during construction preparation, and for the subsequent installation of design features, as required under HIP IV EC approval. (2) Construction management throughout the Tumalum channel area, for the build-phases of the overall project, will continue through FY23, encompassed within the ongoing yearly contract support for the NPT habitat project work in the Tucannon.
WE Agreement Type:
Contracted
Deliverable Specification:
Pre-construction project management activities: Tumalum (Phase I). Where feasible and as clearances are obtained: (1) Source and plan the acquisition of construction materials needed for habitat features and passage restoration actions. Secure and, as necessary, transport trees (large wood) and other construction materials to pre-arranged storage locations; and (2) Conduct site preparation, including projected construction access points and material or equipment staging areas, in anticipation of the sequenced or phased implementation of the Project design during the Summers of 2022 (Phase I) and 2023.

Provide construction oversight, contractor supervision, and inspection of completed access points, materials or equipment storage sites, and preliminary design features or initial project components, throughout the installation of project features (as designed): Tumalum (Phase I-II).

(a) Continue follow-up project implementation support for construction activities; (b) Provide field engineering and construction inspections to ensure structures are being built to design standards; (c) Review construction notes and submit as-built drawing following construction; and d) Maximize the acquisition and secure-storage of construction materials in anticipation of current and anticipated construction needs.

As applicable: 1) Collect and review daily construction logs; 2) Review/approve change order requests (Contractor shall consult with BPA CO (in consultation with BPA COTR) on any desired change orders before directing the construction contractor to make them); 3) Review subcontractor's requests for payments; and 4) Provide the HIP IV project completion notice (PCF) to the BPA EC-lead (annually).
WSE Effective Budget:
$0
% of Total WSE Effective Budget:
0.00%
WSE Start:
04/01/2022
WSE End:
12/31/2023
WSE Completion:
WSE Progress:
Canceled
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 74017 REL 100 (04/01/2022 - 12/31/2024) $34,950 $0
Work Element Budget (Current Performance Period) $0 $0

8 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Advertise construction contract(s): Tumalum 4/1/2022 12/31/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Develop public bid document and solicit sub-contractors for construction contracts: (a) Advertise the construction bids for grubbing access points and staging areas; (b) Advertise the bids for purchase and delivery of trees, boulders and other construction materials; and (c) Advertise the construction bids for implementation of the culvert replacement project elements: Tumalum.
B Obtain materials for habitat features & channel structures; stage at or adjacent to implementation sites: Spring (2022-23) 4/1/2022 12/31/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Construction materials sourced and acquired: transported, stock-piled, and staged in secure storage locations. Material transport, delivery, and site-storage is anticipated to begin early Spring (2022); or beginning with the completion of all necessary Environmental and Cultural Resource clearances. Where feasible, materials are located on-site, identified and secured in areas adjacent to or near the project construction access points (previously cleared for EC-purposes).
C Award the construction contract(s) for: site prep, materials, and construction 5/2/2022 12/31/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Select the subcontractor(s) based on the construction bids for: a) developing access points and staging areas; b) purchase and delivery of culvert components, and trees, boulders, or racking and other construction materials; and c) culvert replacement and installation of channel development, sediment transport and habitat complexity project elements, as designed, to be implemented during the build period.
D Award construction contract for vegetative plantings (restoration design elements & site remediation) 6/3/2022 10/31/2022 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Select the subcontractor(s) based on the construction bids; award contract to plant trees, shrubs and grasses to support the restoration design and the remediation of site impacts
E Construction inspection: a) access points and staging areas; b) build-out of the project (FY22/23) 4/15/2022 10/2/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Provide construction inspections and guidance during pre-construction activities (access points and equipment or materials staging areas) and in the preliminary development or build-out of the major channel complexity and culvert removal and installation elements for the project (structures & additional grade control riffle); Pre-construction activities are expected during the Spring (2022); construction implementation is planned for Jul-Sep (2022 & 2023). Project construction supervision and inspection to be conducted by NPT contract staff and the subcontracted environmental or design engineer; field engineering will be a major component of this work element. Minimize impacts to existing habitat during development of access points and staging areas. Continue supervision of design implementation and sub-contract work crew activities, and provide supervision and oversight throughout the construction period until the project is completed as designed.
F Provide BPA EC Lead with calendar year (2022) HIP IV Project Completion Form (PCF): Tumalum (Year-1) 11/28/2022 1/30/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: [Year-1]: Complete (yearly) and return a project completion notice (PCF) following project construction activities. BPA reports to NMFS on a calendar-year basis. Account for all actions covered by the HIP Biological Opinion that occurred during the calendar year (Jan-Dec); provide the project completion notice to the BPA EC-lead in January (for the prior calendar-year).
G Provide BPA EC Lead with calendar year (2023) HIP IV Project Completion Form (PCF): Tumalum (Year-2) 11/27/2023 12/29/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: [Year-2]: Complete (yearly) and return a project completion notice (PCF) following project construction activities. BPA reports to NMFS on a calendar-year basis. Account for all actions covered by the HIP Biological Opinion that occurred during the calendar year (Jan-Dec); provide the project completion notice to the BPA EC-lead in January (for the prior calendar-year).
H DELIV Provide pre-construction project management activities; supervise the build-out of project features as designed 12/31/2023 Canceled Jennifer Lord 6/7/2023 1:35:56 PM
Description: Pre-construction project management activities: Tumalum (Phase I). Where feasible and as clearances are obtained: (1) Source and plan the acquisition of construction materials needed for habitat features and passage restoration actions. Secure and, as necessary, transport trees (large wood) and other construction materials to pre-arranged storage locations; and (2) Conduct site preparation, including projected construction access points and material or equipment staging areas, in anticipation of the sequenced or phased implementation of the Project design during the Summers of 2022 (Phase I) and 2023. Provide construction oversight, contractor supervision, and inspection of completed access points, materials or equipment storage sites, and preliminary design features or initial project components, throughout the installation of project features (as designed): Tumalum (Phase I-II). (a) Continue follow-up project implementation support for construction activities; (b) Provide field engineering and construction inspections to ensure structures are being built to design standards; (c) Review construction notes and submit as-built drawing following construction; and d) Maximize the acquisition and secure-storage of construction materials in anticipation of current and anticipated construction needs. As applicable: 1) Collect and review daily construction logs; 2) Review/approve change order requests (Contractor shall consult with BPA CO (in consultation with BPA COTR) on any desired change orders before directing the construction contractor to make them); 3) Review subcontractor's requests for payments; and 4) Provide the HIP IV project completion notice (PCF) to the BPA EC-lead (annually).

This work element does not require Metrics
Primary Focal Species:
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened); Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Trout, Bull (S. confluentus) (Threatened); Lamprey, Pacific (Entosphenus tridentata)

This work element does not require Environmental Compliance
This work element does not require RM&E metadata