1984-025-00 EXP GRANDE RONDE UMATILLA FISH HABITAT IMPROVEMENT 21
Contract Start Date:
3/1/2021
Contract End Date:
2/28/2022
Title:
E: 100 - Oversee and Administer Construction of Catherine Creek State Park Fish Habitat Restoration Project
Description:
Staff will develop a bid package, advertise for construction contract, award construction contract, and oversee contractor's construction of the Catherine Creek State Park Fish Habitat Restoration Project. Construction funding has been procured from GRMW to: excavate 1,300’ of side channel along a historical channel scar that had been abandoned by a channel avulsion at the site; construct a high flow swale that is connected to the main channel and which will provide additional conveyance and complexity during high flow events and provide additional discharge to the existing alcove enabling periodic sediment flushing and alcove maintenance; selectively excavate the existing alcove to ensure connectivity during low flows; install apex large wood jams, bank margin habitat cover wood, and hillslope wood in the mainstem and side channel; place large boulders to increase habitat complexity; construct two gravel bars; create and enhance deep pools; plant riparian vegetation; and to provide education and outreach to park visitors using signage.
WE Agreement Type:
Contracted
Deliverable Specification:
1) Collect and review daily construction logs; 2) Review/approve change order requests (Contractor shall consult with BPA CO (in consultation with BPA COTR) on any desired change orders before directing the construction contractor to make them); 3) Review subcontractor's requests for payments.
WSE Effective Budget:
$10,000
% of Total WSE Effective Budget:
1.89%
WSE Start:
03/01/2021
WSE End:
02/28/2022
WSE Completion:
12/31/2021
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $47,259 $10,000 Contract awarded. Will be implemented in 2022.

11 Milestones
Sort Type Title Start End Status Modified By Modified Date
A ADVCC Advertise construction contract 3/1/2021 12/31/2021 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Develop an RFP and advertise construction contract with GRMW.
B AWDCC Award construction contract 3/1/2021 2/28/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Award construction contract after group review of proposals.
C REVDWG Review and approve shop drawings 3/1/2021 2/27/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Review drawings as required by submittals.
D REVCCR Review and approve change orders 3/1/2021 2/27/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Review and approve change orders if necessary during construction.
E INSPECT Provide construction inspection 6/1/2021 2/27/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Project staff will oversee project inspection on-site.
F PREFIN Substantial completion reached and owner notified 11/1/2021 11/30/2021 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Sponsor will report when substantial completion is reached.
G RECAPP Recommend final approval 6/1/2021 2/28/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: Sponsor will upon inspection and review recommend final approval.
H ASBUILT Submit as-built drawings and daily construction logs 6/1/2021 2/28/2022 Concluded Tracy Hauser 10/27/2020 11:32:26 AM
Description: As built redline drawings and construction logs will be submitted to BPA.
I Suggested Submit summaries of periodic (e.g., weekly) construction meetings 6/1/2021 2/28/2022 Concluded Tracy Hauser 9/21/2020 1:30:17 PM
Description: Construction manager typically conducts weekly meetings with construction contractor to review progress, resolve issues, etc. Summaries of these meetings will be submitted to the BPA COTR as soon as meeting notes are finalized for the duration of the project.
J Daily Construction Reports 3/1/2021 2/28/2022 Concluded Tracy Hauser 11/5/2020 10:37:30 AM
Description: Attach to PISCES contract, daily construction logs/reports for Catherine Creek State Park Fish Habitat Restoration Project. May be bundled into several weeks or a month.
K DELIV Construction Management Complete 2/28/2022 Concluded Tracy Hauser 10/27/2020 11:26:15 AM
Description: 1) Collect and review daily construction logs; 2) Review/approve change order requests (Contractor shall consult with BPA CO (in consultation with BPA COTR) on any desired change orders before directing the construction contractor to make them); 3) Review subcontractor's requests for payments.

This work element does not require Metrics
Primary Focal Species:
Steelhead (O. mykiss) - Snake River DPS (Threatened); Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
Secondary Focal Species:
Trout, Interior Redband (O. mykiss gairdnerii); Lamprey, Pacific (Entosphenus tridentata); Freshwater Mussels; Trout, Bull (S. confluentus) (Threatened); Other Resident - Whitefish

This work element does not require Environmental Compliance
This work element does not require RM&E metadata