Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2002-034-00 EXP WHEELER COUNTY RIPARIAN BUFFERS
Contract Start Date:
7/1/2021
Contract End Date:
6/30/2022
Title:
D: 122 - Provide Technical Review on Implementation of Approved Conservation Plans
Description:
Work under this WE provides technical assistance on agreements signed under prior contracts. The CREP technician will provide additional technical assistance to implement the approved plan. This continued technical assistance consists of periodic status reviews, inspecting conservation practices, addressing additional landowner and resource concerns.
WE Agreement Type:
Contracted
Deliverable Specification:
Provide technical review and assistance to private landowners for CCRP/CREP enrollment, coordination and successful implementation of CCRP/CREP riparian buffer/filter strip system agreements. Coordinate with FSA and landowners especially as to timing and location of riparian tree, shrub and grass plantings as well as other planned conservation practices. Inspect riparian protective measures as necessary for proper installation and functionality. Collect and validate how effective the implemented conservation plans are working. Verification that buffer systems and practices are installed as planned and in accordance with NRCS Field Office Technical Guide standards. The foregoing includes the bulk of work to be done under this task. In addition, a repeat Visual Assessment protocol once after the riparian buffer system has been in place for minimum of 3-5 years may be accomplished as requested. The follow-up visual assessment is normally done by USDA NRCS.
WSE Effective Budget:
$7,500
% of Total WSE Effective Budget:
10.71%
WSE Start:
07/01/2021
WSE End:
06/30/2022
WSE Completion:
06/27/2022
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $7,500 $7,500

4 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Inspect Buffer Site 7/1/2021 6/30/2022 Concluded Joshua Ashline 2/22/2021 9:42:39 AM
Description: When requested by NRCS or the landowner will inspect riparian protective measures for proper installation and functionality.
B Analyze Data Collected From Site 7/1/2021 6/30/2022 Concluded Joshua Ashline 2/22/2021 9:42:39 AM
Description: Compare current assessment SVAP with initial assessment (checklist) done during planning.
C Provide Technical Review & Assistance 7/1/2021 6/30/2022 Concluded Joshua Ashline 2/22/2021 9:42:39 AM
Description: Provide technical review and assistance to landowners enrolled in the CREP program.
D DELIV Provide Technical Review on Implementation of Conservation Plans 6/30/2022 Concluded Joshua Ashline 5/27/2021 7:33:39 AM
Description: Provide technical review and assistance to private landowners for CCRP/CREP enrollment, coordination and successful implementation of CCRP/CREP riparian buffer/filter strip system agreements. Coordinate with FSA and landowners especially as to timing and location of riparian tree, shrub and grass plantings as well as other planned conservation practices. Inspect riparian protective measures as necessary for proper installation and functionality. Collect and validate how effective the implemented conservation plans are working. Verification that buffer systems and practices are installed as planned and in accordance with NRCS Field Office Technical Guide standards. The foregoing includes the bulk of work to be done under this task. In addition, a repeat Visual Assessment protocol once after the riparian buffer system has been in place for minimum of 3-5 years may be accomplished as requested. The follow-up visual assessment is normally done by USDA NRCS.

This work element does not require Metrics
This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata