2008-603-00 EXP PAHSIMEROI RIVER HABITAT
Contract Start Date:
5/1/2022
Contract End Date:
12/31/2023
Title:
H: 47 - Plant native vegetation on Muddy Springs Creek near in the area of the new habitat complexity project.
Description:
A planting plan has been developed for the Phase I habitat complexity project. Plantings in summer are often not successful so this planting will take place in fall or early spring. The goal is to capitalize on areas of the habitat work that will improve available water to the new vegetation. This will also require protection from wildlife with fence identified in WE I. This WE will complete Phase 1 of the willow planting from the 2022 Feb/March. The remaining planting will occur during the in-stream work window identified in permits that are currently in place. Phase I installed in February/March included harvested willow clumps planted as a part of the prior contract's WE for Increase Aquatic and/or Floodplain Complexity. This Work Element (Plant Vegetation) will introduce native vegetation to the riparian area in small pockets that can be protected by wildlife fence due to the number of elk that inhabit the area during the winter.

A planting plan, attached in the documents, was developed for Phase I of the Muddy Springs project. Due to delays in design and permits only the construction of the habitat complexity was able to take place in the 2021/2022 contract. By utilizing this plan we will evaluate the best location for small plots of planting and the best time to plant based on weather and available water to complete these plantings.
WE Agreement Type:
Contracted
Deliverable Specification:
Planting will be completed in accordance with the planting plan.
WSE Effective Budget:
$21,845
% of Total WSE Effective Budget:
8.56%
WSE Start:
05/01/2022
WSE End:
11/17/2023
WSE Completion:
11/17/2023
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 90250 (05/01/2022 - 12/31/2023) $13,500 $21,845
2. Amendment 001 (05/01/2022 - 09/30/2023) $27,630 $21,845
Work Element Budget (Current Performance Period) $27,630 $21,845

9 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 5/1/2022 5/31/2022 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
B Obtain plants Purchase and/or gather plants/seeds 5/27/2022 3/31/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: Consider vegetation BMPs for pollinators. Consult your EC lead for additional resources and information on providers of locally adapted native plants/seeds.
C Survey site and establish planting locations 7/15/2022 3/31/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: The planting plan will be more successful if sites can be located after the habitat complexity project has been competed and the best sites can be located to plant "clusters" of plants that can be fenced with wildlife fence protection to allow these species to thrive. Willow plantings may need to be subsidized from the original planting during the Feb/March time frame and would need to be completed under the 404 permit in July and August of 2022. Other plantings may be more successful in September/October of 2022 or early spring 2023. The Environmental consultation and permits including cultural survey work should be completed under EC completed for Phase I.
D Develop Bid documents to select contractor 8/1/2022 9/1/2022 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: Custer SWCD will develop request for qualification and bid documents to solicit for bid for this work element. Custer SWCD and landowner will select contractor based on low bid and contractor experience in completing this type of work.
E Plant Vegetation 9/1/2022 4/30/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: Selected contractor will complete planting in accordance with the Planting Plan.
F Monitor vegetation planting 9/1/2022 4/30/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: Monitor vegetation planting efforts conducted by the selected contractor.
G Inspect completed work 9/1/2022 4/30/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 7:14:30 AM
Description: Verify that the selected contractor followed plans.
H Complete additional plantings on Phase II of Muddy Springs 9/15/2023 11/10/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 8:29:19 AM
Description: Phase I planting survival was not optimal for willows and shrubs. Re-seeding however was successful in that reach. Phase II plantings will focus on willow cuttings.
I DELIV Complete Phase 1 planting. 11/17/2023 Concluded Ryan Ruggiero (Inactive) 9/12/2023 8:29:19 AM
Description: Planting will be completed in accordance with the planting plan.

Work Site ID Latitude Longitude State County Province Subbasin
101262 44.596857 -113.957156 Idaho Custer Mountain Snake Salmon

Primary Focal Species:
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened); Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Trout, Bull (S. confluentus) (Threatened)

This work element does not require RM&E metadata