PI 1998-019-00 EXP WIND RIVER WATERSHED
Contract Start Date:
11/1/2024
Contract End Date:
10/31/2025
Title:
E: 157 - Maintain the Upper Wind PIT Tag Interrogation System and Ensure Data Collection
Description:
Maintain the upper Wind PIT tag interrogation system (site code WRU) and the associated auxiliary antennas downstream of the site (used for developing and assessing detection efficiency of WRU). This may include tuning of the transceiver, changing batteries, adjustment of solar panels, and replacement of lost or malfunctioning antennas. Assure that the data are collected in a timely manner. USGS will submit data to PTAGIS. Data will be summarized in the annual RM&E reporting, and we will be collaborating with WDFW on use of these data in steelhead estimates and long-term monitoring of Steelhead parr. This site serves in concert with the Mine Reach site to generate adult and juvenile data for the upper Wind River to act as control for Trout Creek as ongoing and proposed restoration actions take place there.
WE Agreement Type:
Contracted
Deliverable Specification:
Produce an error checked dataset from interrogation site WRU submitted to the PTAGIS Database
WSE Effective Budget:
$15,000
% of Total WSE Effective Budget:
7.50%
WSE Start:
11/01/2024
WSE End:
10/31/2025
WSE Completion:
WSE Progress:
In Progress
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $15,000 $15,000

7 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 11/1/2024 10/31/2025 Concluded Verl Miller 7/31/2024 12:44:45 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
B PUBPROTOCOL Review, revise, and finalize study plan sample design protocol and methods in MonitoringResouces.org 11/1/2024 10/31/2025 Active Verl Miller 7/3/2024 8:29:08 AM
Description: The Study Plan's Sample Design, Protocol and Methods for this work element are stored at MonitoringResources.org and need to be completed (i.e., "Finalized" through MonitoringResources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously finalized Sample Designs, Protocols & Methods to ensure that they are consistent with how work will be done in any subsequent contract.
C Suggested Implement Study Plan 11/1/2024 10/31/2025 Active Verl Miller 7/3/2024 8:29:08 AM
Description: Implement the study plan's protocols and sample design consistent with the WE description and methods in the SOW. The start date of this milestone is used to set the completion date for the EC milestone.
D BackUp Secure data back-up 11/1/2024 10/31/2025 Active Verl Miller 7/3/2024 8:29:08 AM
Description: Minimum requirements: Hard copies of field sheets and original dataloggers secured against fire and flood. At least daily data back-up of electronic data on a separate hard drive. Secure cloud-based or off-site location data back-up to preclude catastrophic data loss at least weekly. More frequent cloud/off-site back-up is greatly encouraged. [Timing guidance: from beginning to end of contract]
E Upload Yearly upload of error-checked datasets 11/1/2024 10/31/2025 Active Verl Miller 7/3/2024 8:29:08 AM
Description: Upload datasets with associated metadata to a publicly accessible site each year as soon as they have been QA/QC checked. This generally happens within 6 months for direct field-to-database input, but may be longer if laboratory analysis is required (e.g., scale reading or genetic analyses). If data is not QA/QCed within 1 year, data must be made accessible with acknowledgement of QA/QC limitations. Periods for dataset collection should be no longer than a year, and coincide with the logical biology of the data collection, which may not be on a calendar year. Example of a dataset: redd counts for one species for one season for a particular brood year. Dataset upload requirements apply to both original and derived data, which should be at a level of quality suitable for release to resource co-managers to make decisions – not the rigor required as if you were going to use the data for a peer-reviewed publication.
F Maintain the upper Wind PIT tag interrogation system and assure data collection. 11/1/2024 10/31/2025 Active Verl Miller 7/19/2024 11:37:40 AM
Description: Maintain the upper Wind PIT tag interrogation system and associated WRA (auxiliary site) and troubleshoot or repair as needed and assure that data are being recorded in a format compatible with the PTAGIS database. Download data every 7-14 days and submit data to the PTAGIS database within 24-48 hrs on average.
G DELIV Produce accessible, error-checked datasets 10/31/2025 Active Verl Miller 7/19/2024 11:37:40 AM
Description: Produce an error checked dataset from interrogation site WRU submitted to the PTAGIS Database

Work Site ID Latitude Longitude State County Province Subbasin
36333 45.863477 -121.968327 Washington Skamania Columbia Gorge Wind

Primary Focal Species:
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
Secondary Focal Species:
None

Title Link
PTAGIS Website http://www.ptagis.org/
Study Plan Name Study Plan Owner Protocol State Sample Design Name
Monitoring of Steelhead parr life history and population attributes in the Wind River, WA. v1.0 Ian Jezorek Finalized Maintain the upper Wind PIT tag interrogation system and ensure data collection - US Geological Survey (USGS) v2.0

ID Name Type Optional Customized Based On Status
6785 Backpack Electrofishing; Single-Pass, Unblocked v1.0 Data Collection No N/A Finalized
485 Cormack-Jolly-Seber (CJS) Model v1.0 Data Analysis/Interpretation No N/A Finalized
118 Electrofishing - Backpack - Mark v1.0 Data Collection No N/A Finalized
119 Electrofishing - Backpack - Recapture v1.0 Data Collection No N/A Finalized
3971 Estimate abundance of juvenile salmonids in small streams v1.0 Data Analysis/Interpretation No N/A Finalized
1734 Fish wet weight v1.0 Data Collection No N/A Finalized
4041 Measuring Fish Length: Fork length v2.0 Data Collection No N/A Finalized
6855 Operate full duplex instream PIT Tag Interrogation Systems to detected PIT tagged juvenile and adult Steelhead v1.0 Data Collection No N/A Finalized
6856 Relative growth of Steelhead parr in length and weight v1.0 Data Analysis/Interpretation No N/A Finalized
6573 Using interrogation data from multiple stationary PIT antenna arrays to describe migratory pathways and patterns of movement v1.0 Data Analysis/Interpretation No N/A Finalized

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Steelhead parr abundance at headwater sites Fish Abundance of Fish (ID: 46) Fish Life Stage: Juvenile - Fry/Parr Fish Origin: Natural
Abundance of migratory Steelhead parr Fish Abundance of Fish (ID: 46) Fish Life Stage: Juvenile - Parr Fish Origin: Natural
Species composition Fish Composition: Fish Species Assemblage (ID: 56) Fish Life Stage: RANGE: Juvenile to Adult Fish Origin: Natural
Growth of Steelhead parr Fish Growth Rate: Fish (ID: 73) Fish Life Stage: Juvenile - Fry/Parr NA
Interrogation history of juvenile Steelhead Fish Migration Pathways: Fish (ID: 77) Fish Life Stage: Juvenile - Fry/Parr NA
Interrogation history of adult Steelhead Fish Migration Pathways: Fish (ID: 77) Fish Life Stage: Adult Fish NA
Steelhead parr survival and migration to downstream rearing or smolt stage Fish Survival Rate: Fish (ID: 99) Fish Life Stage: RANGE: Juvenile to Juvenile Fish Origin: Natural