This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 31784 (03/01/2007 - 05/31/2008) | $9,700 | $8,500 | mgt. included with this figure for erosion control | |
Work Element Budget (Current Performance Period) | $9,700 | $8,500 | mgt. included with this figure for erosion control |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 3/1/2007 | 3/31/2007 | Concluded | Sarah Branum (Inactive) | 12/20/2007 4:29:01 PM |
Description: Prior to implementation, consult with BPA to ensure actions are covered. | |||||||
B | DELIV | Installation of practices that meet NRCS standards and specifications. | 5/31/2008 | Concluded | Sarah Branum (Inactive) | 12/20/2007 4:31:59 PM | |
Description: With normal weather patterns, this work should be implemented during the spring and fall of 2007. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1404. # of upland acres treated | 10.0 | 10.0 | terraces were rebuilt for Hastings Farms |
acres improved in various ways acres treated instream |
Habitat Acres |
1405. # of wetland acres treated | 0.0 | 0.0 | no wetland acres treated |
acres improved in various ways acres treated instream |
Habitat Acres |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
10002 | 46.633252 | -117.555489 | Washington | Garfield | Columbia Plateau | Snake Lower |