Work Element 55: Erosion and Sedimentation Control - Published
WE Name:
55. Erosion and Sedimentation Control (Upland Erosion Contr)
Work Category:
Habitat - Habitat Improvement
WE Agreement Type:
Contracted
Status:
Active
Definition:
This is work that occurs in the riparian and upland zones, which may include the installation of water bars, gully plugs and culvert outlets, grassed waterways, grade stabilization structures, sediment catchment ponds/basins, regrading or terracing, and removal of drainage pipes and other blockages specifically to prevent erosion, sediment slumps, or landslides. This WE does not include improvements to roads or the planting of vegetation in applications other than surface soils stabilization. For that work, use 38. Improve Road for Instream Habitat Benefits or 47. Plant Vegetation, respectively.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
construction/implementation
Sort Sequence:
5.16
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes

  • 165. Produce Environmental Compliance Documentation - Ensure end dates for compliance milestones are before start dates for work. Compliance documents, including permits, may have been generated during the previous contract; if this is the case, it should be mentioned in the Work Element Description section of WE# 55, Erosion and Sedimentation Control. Example: All environmental compliance documents have been submitted and the categorical exclusion is on file with Jane Doe, the assigned BPA environmental specialist; documents have also been approved and are on file with the Clearwater National Forest.
  • If planting grass or other vegetation specifically for erosion control, use 47. Plant Vegetation. Use WE# 55, Erosion and Sedimentation Control for work that precipitates planting vegetation, such as grading/land contouring associated with preparing grassed waterways.
  • Work to identify, prioritize, and select erosion control projects should be described by using 114. Identify and Select Projects. If this occurred in the previous contract, it is not mentioned in this one.
  • The determination and recommendation of what type of erosion control Study Design to use is described under 175. Produce Design. If design occurred in a previous contract, do no list a work element for it, but note it in the Work Element Description. Example: Design work was completed in last contract by FS engineers.
  • If agreements and MOUs/MOAs are required, you should list these as milestones under the work element Erosion and Sedimentation Control, or under the work element they most directly support.
  • 181. Create, Restore, and/or Enhance Wetland - despite the fact that your project may create a wetland, if the original purpose of the project was erosion control, use WE# 55, Erosion and Sedimentation Control.
  • 33. Decommission Road/Relocate Road - if removing blocked culverts and parts of a non-used road for the specific purpose of preventing a "blow-out" (sediment landslide or flow into a stream) then use WE# 55, Erosion and Sedimentation Control.
  • 186. Operate and Maintain Habitat/Passage/Structure - use this work element in the future to maintain the project you installed under WE# 55, Erosion and Sedimentation Control.

Deliverable Status:
Required
Default Deliverable Desc:
Reduced Sediment
Potential Deliverables:
  • # of acres (define what control device is being used) and/or tons/lbs of soil saved from erosion (estimate)

  • Rule 1 (Environmental Compliance): Any associated ESA, cultural resources, NEPA, permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.

    Example:

    WE: 55. Erosion and Sedimentation Control
    WE Title: Construct Selbey sediment pond
    WE Description: Construct 2-acre sediment catchment on Selbey property.

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Ensure NEPA documentation is complete
    WE Description: Provide documentation to BPA's Environmental Compliance contact for sediment catchment on Selbey property.

  • Rule 2 (Location of Work): You may lump multiple locations under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management. Note that separate work elements need to be used if working in multiple subbasins. Different locations do not need to be separated into multiple environmental compliance work elements.

    Examples:

    Option 1 (lumping):

    WE: 55. Erosion and Sedimentation Control
    WE Title: Construct approx. 10 sediment ponds on various properties
    WE Description: Provide and construct sediment ponds to help reduce erosion from roads and fields near Wet and Damp creeks and their tributaries.

    Option 2 (splitting):

    WE: 55. Erosion and Sedimentation Control
    WE Title: Gully plug #1 and grassed waterway on Heardon property
    WE Description: Construct Heardon gully plug #1 to reduce erosion from 5 acres of Heardon property. Create grassed waterway on Heardon property to effect reduction of .55 metric tons of soil movement/year.

    WE: 55. Erosion and Sedimentation Control
    WE Title: Grassed waterway and 2 sediment ponds on Jameson property
    WE Description: Create grassed waterway and 2 sediment ponds on Jameson property to effect reduction of .75 metric tons of soil movement/year.

    WE: 55. Erosion and Sedimentation Control
    WE Title: Construct approx. 10 sediment ponds on various properties in Tiny Subbasin
    WE Description: Provide and construct sediment ponds to help reduce erosion from roads and fields near Wet and Damp creeks and their tributaries in Tiny Subbasin.

  • Rule 3 (Metrics): If you are doing multiple types of activities/projects at one location, be sure to list them in separate appropriate work elements so that we can capture the different metrics.

    Example:

    WE: 55. Erosion and Sedimentation Control
    WE Title: Ghost River gabion baskets
    WE Description: Install 15 gabion baskets along head-cut gully draining into Ghost River.

    WE: 47. Plant Vegetation
    WE Title: Erosion control at Ghost River
    WE Description: Hydro-seed 1 acre of cut bank at Ghost River to control erosion.

    WE: 184. Install Fish Passage Structure
    WE Title: Replace culvert #3 on Casper Road/Ghost River
    WE Description: Replace 30-inch culvert on Casper Road/Ghost River with 8-foot pipe arch culvert able to withstand 100-year event.

    WE: 38. Improve Road for Instream Habitat Benefits
    WE Title: Repair surface erosion and rilling on Casper Road/Ghost River
    WE Description: Grade and gravel .3 mile where Casper Road crosses Ghost River.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Receive design and cost estimates
Suggested
No
If this project requires engineering, use WE# 175.
Prepare MOU/MOA with partners
Suggested
No
Sign agreement with landowner
Suggested
No
Identify each of the partners involved.
All permits received
Suggested
No
Prepare bid package
Suggested
No
Select equipment operators
Suggested
No
Construct erosion control project
Suggested
No
Follow-up inspection/sign-off on work
Suggested
No


19 Metrics Associated With Work Element 55: Erosion and Sedimentation Control

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1622: # of regradation and/or terracing treatments Active number 2011 Required Yes Yes No
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1638: # of acres of riparian habitat treated Active number 2011 Required Yes Yes No
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1639: # of acres of estuarine habitat treated Active number 2011 Required Yes Yes No
1640: # of acres of upland habitat treated Active number 2011 Required Yes Yes Yes C.6.e.2 Acres treated with erosion control structures
1642: # of sediment basins, collection ponds, and sediment traps installed Active number 2011 Required Yes Yes Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1643: # of baffles installed Active number 2011 Required Yes Yes Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1404: # of upland acres treated Expired number 2005 2009 Required Yes No Yes C.6.e.2 Acres treated with erosion control structures
1405: # of wetland acres treated Expired number 2005 2009 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1515: # of acres of upland non-wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.6.e.2 Acres treated with erosion control structures
1516: # of acres of upland wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.6.e.2 Acres treated with erosion control structures
1517: # of acres of riparian non-wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.6.e.2 Acres treated with erosion control structures
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1518: # of acres of riparian wetland habitat treated Expired number 2010 2010 Required Yes No No
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1519: # of acres of freshwater non-wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.6.e.2 Acres treated with erosion control structures
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1520: # of acres of freshwater wetland habitat treated Expired number 2010 2010 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1521: # of acres of estuarine wetland habitat treated Expired number 2010 2010 Required Yes No No
1522: # of acres of estuarine non-wetland habitat treated Expired number 2010 2010 Required Yes No No
1568: # of erosion control structures Expired number 2010 2010 Required Yes No Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
1618: # of water bars installed Expired number 2011 2010 Required Yes No Yes C.6.e.3 Erosion / sediment control installations
1641: # of acres of freshwater habitat treated Expired number 2011 2010 Required Yes No No

Measure HLI Associated Metrics
# of erosion control structures 1642. # of sediment basins, collection ponds, and sediment traps installed
1643. # of baffles installed
1622. # of regradation and/or terracing treatments
acres improved in riparian areas 1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
1638. # of acres of riparian habitat treated
1639. # of acres of estuarine habitat treated
1641. # of acres of freshwater habitat treated
acres improved in various ways Habitat Acres 1404. # of upland acres treated
1405. # of wetland acres treated
acres treated Habitat Acres 1515. # of acres of upland non-wetland habitat treated
1516. # of acres of upland wetland habitat treated
1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
1638. # of acres of riparian habitat treated
1639. # of acres of estuarine habitat treated
1640. # of acres of upland habitat treated
1641. # of acres of freshwater habitat treated
acres treated instream 1404. # of upland acres treated
1405. # of wetland acres treated
1515. # of acres of upland non-wetland habitat treated
1516. # of acres of upland wetland habitat treated
1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
1638. # of acres of riparian habitat treated
1639. # of acres of estuarine habitat treated
1640. # of acres of upland habitat treated
1641. # of acres of freshwater habitat treated
erosion control structures or water sources installed 1568. # of erosion control structures

CBFish Metric Set
# of erosion control structures (Required)
Type of Erosion Control Structures Metric ID and Name Required?
Regradation, or Terracing 1622. # of regradation and/or terracing treatments Required
Sediment basins, collection ponds, and sediment traps 1642. # of sediment basins, collection ponds, and sediment traps installed Required
Baffles 1643. # of baffles installed Required
acres treated (Required)
Habitat Zone Wetland Zone Metric ID and Name Required?
Riparian unspecified 1638. # of acres of riparian habitat treated Required
Estuarine unspecified 1639. # of acres of estuarine habitat treated Required
Upland unspecified 1640. # of acres of upland habitat treated Required

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.e.1 Erosion control structures installed
            C.6.e.2 Acres treated with erosion control structures
1404: # of upland acres treated
1515: # of acres of upland non-wetland habitat treated
1516: # of acres of upland wetland habitat treated
1517: # of acres of riparian non-wetland habitat treated
1519: # of acres of freshwater non-wetland habitat treated
1640: # of acres of upland habitat treated
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.e.1 Erosion control structures installed
            C.6.e.3 Erosion / sediment control installations
1568: # of erosion control structures
1618: # of water bars installed
1642: # of sediment basins, collection ponds, and sediment traps installed
1643: # of baffles installed

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1 - 100
Location Guidance:
Identify point(s) where work will take place or approximate mid-point of all erosion control locations within a subbasin. If a location already exists in Pisces, click the "Link" button to synchronize locations. Note that separate work elements must be used for each subbasin if working in multiple subbasins.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #55 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
David Kaplowe 22
Andre L'Heureux (Inactive) 16
Virgil Watts III 13
Sarah Branum (Inactive) 12
Jamie Cleveland (Inactive) 9
Average Work Element Budget: $25,651
Average Duration: 10 months