This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
280 | Identify the number of baffles installed where baffles are defined as: porous barriers installed inside a temporary sediment trap, rock dam, skimmer basin, or sediment basin to reduce the velocity and turbulence of the water flowing through the control measure, and facilitate the settling of sediment from the water before discharge. | 55 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
55. Erosion and Sedimentation Control | Active | This is work that occurs in the riparian and upland zones, which may include the installation of water bars, gully plugs and culvert outlets, grassed waterways, grade stabilization structures, sediment catchment ponds/basins, regrading or terracing, and removal of drainage pipes and other blockages specifically to prevent erosion, sediment slumps, or landslides. This WE does not include improvements to roads or the planting of vegetation in applications other than surface soils stabilization. For that work, use 38. Improve Road for Instream Habitat Benefits or 47. Plant Vegetation, respectively. | 2011 | 280 | Identify the number of baffles installed where baffles are defined as: porous barriers installed inside a temporary sediment trap, rock dam, skimmer basin, or sediment basin to reduce the velocity and turbulence of the water flowing through the control measure, and facilitate the settling of sediment from the water before discharge. | Required | Yes | Yes | Yes | C.6.e.3 | Erosion / sediment control installations | |
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.e.1 Erosion control structures installed C.6.e.3 Erosion / sediment control installations |
55. Erosion and Sedimentation Control |