Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
View Work Elements Available in FY:

Summary

<<
<
>
>>
Metric 1568: # of erosion control structures - Published
Metric Type ID:
1568
Metric Name:
# of erosion control structures
Metric Unit Type:
number
Is Numeric:
Yes
Precision:
1.0

Metric Guidance ID Description  Used on Work Elements
205 Enter the total number of sediment basins, sediment collection ponds, sediment traps, or other structural treatments constructed or placed. (Note: This excludes treatments to roads and trails. Or plantings.) 55

1 Work Element Associated With Metric 1568: # of erosion control structures

Work Element Work Element Association Status Description FY Start FY End Guidance ID Guidance Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
55. Erosion and Sedimentation Control Expired This is work that occurs in the riparian and upland zones, which may include the installation of water bars, gully plugs and culvert outlets, grassed waterways, grade stabilization structures, sediment catchment ponds/basins, regrading or terracing, and removal of drainage pipes and other blockages specifically to prevent erosion, sediment slumps, or landslides. This WE does not include improvements to roads or the planting of vegetation in applications other than surface soils stabilization. For that work, use 38. Improve Road for Instream Habitat Benefits or 47. Plant Vegetation, respectively. 2010 2010 205 Enter the total number of sediment basins, sediment collection ponds, sediment traps, or other structural treatments constructed or placed. (Note: This excludes treatments to roads and trails. Or plantings.) Required Yes No Yes C.6.e.3 Erosion / sediment control installations
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
Rationale:

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Work Element
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.e.1 Erosion control structures installed
            C.6.e.3 Erosion / sediment control installations
55. Erosion and Sedimentation Control