This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
205 | Enter the total number of sediment basins, sediment collection ponds, sediment traps, or other structural treatments constructed or placed. (Note: This excludes treatments to roads and trails. Or plantings.) | 55 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
55. Erosion and Sedimentation Control | Expired | This is work that occurs in the riparian and upland zones, which may include the installation of water bars, gully plugs and culvert outlets, grassed waterways, grade stabilization structures, sediment catchment ponds/basins, regrading or terracing, and removal of drainage pipes and other blockages specifically to prevent erosion, sediment slumps, or landslides. This WE does not include improvements to roads or the planting of vegetation in applications other than surface soils stabilization. For that work, use 38. Improve Road for Instream Habitat Benefits or 47. Plant Vegetation, respectively. | 2010 | 2010 | 205 | Enter the total number of sediment basins, sediment collection ponds, sediment traps, or other structural treatments constructed or placed. (Note: This excludes treatments to roads and trails. Or plantings.) | Required | Yes | No | Yes | C.6.e.3 | Erosion / sediment control installations |
ITS Action Category:
Fine Sediment
ITS Metric:
Number of sediment treatments
|
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.6 Upland Habitat And Sediment Project C.6.e.1 Erosion control structures installed C.6.e.3 Erosion / sediment control installations |
55. Erosion and Sedimentation Control |