This page presents detailed associations and definitions for this Work Element. Information on how this Work Element is being used in BPA field work is also included.
165. Produce Environmental Compliance Documentation - Ensure environmental compliance milestones end before affected work starts. Compliance documents, including permits, may have been generated during the previous contract. If this is the case, it should be mentioned in the work element description section of WE# 52, Remove Mine Tailings. Example: All NEPA, ESA, and cultural resource compliance documents have been submitted and the clearance is on file with Jane Doe, the assigned BPA Environmental Specialist; documents have also been approved and are on file with the Clearwater National Forest.
Work to identify, prioritize, and select mine tailings projects should be described by using 114. Identify and Select Projects. If this occurred in the previous contract, it is not mentioned in this one.
The determination and recommendation of tailings removal Study Design is described under 175. Produce Design. If design occurred in a previous contract, do no list a work element for it, but note it in the work element description section of WE# 52, Remove Mine Tailings. Example: Grading/removal work was completed in last contract by FS engineers.
If agreements and MOUs/MOAs are required, you should list these as milestones under the Remove Mine Tailings work element, or under the work element they most directly support.
If removal of mine tailings modifies an old/existing channel, note it in the work element description section of this work element. Do not use 30. Realign, Connect, and/or Create Channel because it will duplicate project metrics data for streams.
If planting vegetation or seeding after tailings removal, also use 47. Plant Vegetation to capture this work.
Rule 1 (Environmental Compliance):
Any associated ESA, cultural resources, NEPA, permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.
WE:52. Remove Mine Tailings WE Title: Remove mine tailings blocking Winsome Creek WE Description: Remove .5 acres of mine tailings blocking Winsome Creek
Rule 2 (Location of Work):
Each non-contiguous area or stretch of project area requires its own work element. This is due to metrics reporting requirements for projects in different locations. Note that different locations do not need to be separated into multiple environmental compliance work elements.
WE:52. Remove Mine Tailings WE Title: Remove mine tailings blocking Winsome Creek WE Description: Remove .5 acre of mine tailings blocking Winsome Creek.
Rule 3 (Metrics):
If you are doing multiple types of activities/projects at one location, be sure to list them in separate appropriate work elements so that we can capture the different metrics.
Example:
WE:52. Remove Mine Tailings WE Title: Remove mine tailings blocking Winsome Creek WE Description: Remove .5 acre of mine tailings blocking Winsome Creek.
WE:84. Remove/Install Diversion (Expired) WE Title: Remove Winsome Mine push-up dam WE Description: Remove 25-foot earthen push-up dam on Winsome Creek.
WE:197. Maintain/Remove Vegetation (Expired) WE Title: Scotch broom removal at Winsome Creek (year 1 of 3) WE Description: All Scotch broom mechanically removed on 3-acre Winsome Mine footprint.
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
C.0 Salmonid Habitat Restoration and Acquisition
C.2 Fish Passage Improvement
C.2.j.1 Unspecified or other fish passage project
C.2.j.2 Number of unspecified or other blockages/impediments/barriers removed/altered
Identify point at approximate center of area where mine tailings will be removed. If a location already exists in Pisces, click the "Link" button to synchronize locations.
Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab
for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information
in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.
Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the
contract being finalized, and may be revised depending on the specific circumstances.
National Environmental Policy Act (NEPA)
NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
Endangered Species Act (ESA)
ESA consultation is typically required for this work element.
National Historic Preservation Act (NHPA)
NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.
Public Involvement
Public involvement is typically not required for this work element.
This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.
Overview:
Summarizes annual accomplishments of the Habitat portion of the Program in terms of measures or metrics. Includes several tables focused on different dimensions: Habitat Zone, NPCC Province and Subbasin, ESU. Report can be filtered by Fiscal Year, Province or Subbasin, Work Element, Work Status, or Fish Species (ESU) benefitted.
Dimensions:
Habitat Measures, Metrics, Planned and Actual Metric Value, Fiscal Year, Habitat Zone, Work Element, Work Status, NPCC Province, NPCC Subbasin, ESU
Overview:
This drill-down report shows the Program's Habitat Accomplishments from fiscal year 2005 forward. Figures are based on the High Level Indicators identified by the Northwest Power and Conservation Council, and aggregate metric data entered by the contractors doing the work on the ground. For past years, these charts show Actual metric values for Completed work; for the current year they show both Actual metric values for Completed work and Planned metric values for Planned and In-Progress work.
Dimensions:
HLI, High Level Indicators (Habitat, Water, Land, Screens, Passage Barriers), Habitat Measures, Work Element, Metric
Overview:
Shows the estimated spending by Focal Species – various anadromous and resident fish and general wildlife category – by fiscal year. Since contractors don’t invoice BPA by work element, much less by focal species, this report allocates project costs by the proportion of the work element budgets and the focal species associated with each work element. This report has two tables: Spending by all Focal Species, and Spending by ESA-Listed Focal Species (a table that allows BPA to meet federal reporting requirements).
Dimensions:
Focal Species, ESA-Listed Fish Species, Direct Spending, Contract Administration Spending, Program Administrative Spending, Account Type (Expense, Capital), Work Element Budgets
Overview:
Rolls up program funding across time by work class such as Habitat, Hatchery, Research Monitoring and Evaluation, Local & Regional Coordination, etc. Includes summary and detail pie charts showing funding levels for various types of work. Provides drill-downs to work element detail.
Dimensions:
Work Class, Work Element, Work Element Budget, Account Type (Expense or Capital), NPCC Province, NPCC Subbasin