Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003 017 00 ISEMP EST ADULT ABUND INCL STEELHEAD REDDS
Contract Start Date:
3/1/2007
Contract End Date:
3/31/2008
Title:
D: 174 - Steelhead survey site reconnaissance
Description:
Evaluate existing spatially located random sites for suitability according to rules established by ISEMP for accepting or rejecting sites using the ISEMP Master Site List for steelhead including descriptions of the final site list, list of all sites considered, and reasons for rejecting sites from sampling. Coordinate updates to the Master Site List for steelhead with other ISEMP contractors according to the specified schedule.
WE Agreement Type:
Contracted
Deliverable Specification:
Coordinate updates to the Master Site List for steelhead with other contractors according to the following schedule:

July 30, 2007 - USFS provides Terraqua, Inc. the final Master Site List for steelhead sites surveyed or rejected from sampling during the 2007 steelhead survey season
December 1, 2007 - Terraqua, Inc. provides CCCD and USFS the initial Master Site List for steelhead sites for the 2008 steelhead survey season
January 1, 2008 - USFS provides CCCD with comments regarding the working Master Site List for steelhead sites
February 15, 2008 - CCCD provides USFS with final pre-season working Master Site List for steelhead sites

The quality controlled master site list (currently in Microsoft Excel) will be provided to Terraqua, Inc. by July 31, 2007. The contractor will be responsible for all quality assurance/quality control steps necessary to ensure that data is properly collected and entered into the master site list.
WSE Effective Budget:
$8,920
% of Total WSE Effective Budget:
5.08%
WSE Start:
03/01/2007
WSE End:
01/31/2008
WSE Completion:
07/30/2007
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 31579 (03/01/2007 - 03/31/2008) $8,920 $8,920
2. Amendment 001 (03/01/2007 - 01/31/2008) $8,920 $8,920
Work Element Budget (Current Performance Period) $8,920 $8,920

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Final quality controlled Master Site List for 2007 season 3/1/2007 7/30/2007 Concluded David Byrnes (Inactive) 1/22/2008 8:23:59 AM
Description: July 30, 2007 - USFS provides Terraqua, Inc. the final quality controlled Master Site List for steelhead sites surveyed or rejected from sampling during the 2007 steelhead survey season including the list of sites rejected from sampling and including other information specified in the master site list.
B Comments on initial Master Site List for 2008 12/1/2007 1/1/2008 Concluded David Byrnes (Inactive) 1/22/2008 8:23:59 AM
Description: January 1, 2008 - USFS provides CCCD with comments regarding the working Master Site List for steelhead sites (this working Master Site List will be provided by Terraqua, Inc. on December 1, 2007).
C DELIV Update location of sampling sites 1/31/2008 Concluded David Byrnes (Inactive) 1/22/2008 8:23:59 AM
Description: Coordinate updates to the Master Site List for steelhead with other contractors according to the following schedule: July 30, 2007 - USFS provides Terraqua, Inc. the final Master Site List for steelhead sites surveyed or rejected from sampling during the 2007 steelhead survey season December 1, 2007 - Terraqua, Inc. provides CCCD and USFS the initial Master Site List for steelhead sites for the 2008 steelhead survey season January 1, 2008 - USFS provides CCCD with comments regarding the working Master Site List for steelhead sites February 15, 2008 - CCCD provides USFS with final pre-season working Master Site List for steelhead sites The quality controlled master site list (currently in Microsoft Excel) will be provided to Terraqua, Inc. by July 31, 2007. The contractor will be responsible for all quality assurance/quality control steps necessary to ensure that data is properly collected and entered into the master site list.

This work element does not require Metrics
Primary Focal Species:
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
Secondary Focal Species:
None

This work element does not require RM&E metadata