Title:
H: 118 - Project Initiation - John Day
Description:
The PI will have primary responsibility for tasks specifically associated with the initiation of the project. Initiating the pilot projects in three subbasins (Wenatchee, John Day, Salmon) will require the establishment of a Technical Oversight Committee and project coordination for each geographic region. The PI will develop the guidance and terms of reference for the TOC's role in each pilot project, as well as define the scope of responsibilities for the project coordination tasks. Subsequent programmatic and design decisions will be made cooperatively with the PI, TOC and project coordinator(s) as outlined in their contracts and guidance documents.
WE Agreement Type:
Contracted
Deliverable Specification:
A Technical Oversight Committee for each subbasin pilot project will be developed. Specific products for this element will be guidance and terms of reference documents for the Technical Oversight Committees.

For this element, specific products will be contracts for subbasin specific coordination elements of Phase I of the project. These contracts will be let directly from BPA to independent contractors; however, the PI will be responsible for identifying the contractors and overseeing the development of their contracts. In addition, required annual and BiOp reporting on this task will be done following the reporting guidelines described above.
WSE Effective Budget:
$0
% of Total WSE Effective Budget:
WSE Start:
11/01/2004
WSE End:
09/30/2005
WSE Completion:
WSE Progress:
Other
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. Amendment 002 (10/01/2003 - 09/30/2005)
Work Element Budget (Current Performance Period)

2 Milestones
Sort Type Title Start End Status Modified By Modified Date
A DELIV Convene/Identify John Day River pilot project TOC 9/30/2005 Active Gerald McClintock (Inactive) 11/30/2005 7:56:32 AM
Description: A Technical Oversight Committee for each subbasin pilot project will be developed. Specific products for this element will be guidance and terms of reference documents for the Technical Oversight Committees. For this element, specific products will be contracts for subbasin specific coordination elements of Phase I of the project. These contracts will be let directly from BPA to independent contractors; however, the PI will be responsible for identifying the contractors and overseeing the development of their contracts. In addition, required annual and BiOp reporting on this task will be done following the reporting guidelines described above.
B Contracts in place for John Day River pilot project coordinators 11/1/2004 9/30/2005 Concluded Gerald McClintock (Inactive) 11/30/2005 7:56:32 AM
Description: