This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 36039 (01/01/2008 - 12/31/2008) | $22,000 | $13,211 | ||
Work Element Budget (Current Performance Period) | $22,000 | $13,211 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 1/1/2008 | 6/30/2008 | Concluded | Sarah Branum (Inactive) | 9/24/2008 1:25:08 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | Completion of landowner contracts | 1/1/2008 | 9/30/2008 | Concluded | Sarah Branum (Inactive) | 9/24/2008 1:25:08 PM | |
Description: Landowner contracts will be completed before construction begins. | |||||||
C | Convert agricultural crops to grasses and continual coverage crops | 1/1/2008 | 11/30/2008 | Concluded | Sarah Branum (Inactive) | 9/24/2008 1:25:08 PM | |
Description: Work proactively with landowners to successfully complete and manage the conversion of agricultural cropland to grasses and continual coverage crops throughout the 5-year period. | |||||||
D | DELIV | Approximately 200 acres converted to grassland | 11/30/2008 | Concluded | Sarah Branum (Inactive) | 9/24/2008 1:25:08 PM | |
Description: We expect 3 landowners to participate this year with approximately 200 acres total. Landowners will convert from agricultural cropland to grasses and continual coverage crops. Landowners will receive a one time payment at the rate of $110.00/acre. They are responsible for leaving the acreage as grassland for 5 years, although they may be able to do some low impact grazing or haying (starting in the second year) as long as their proposed actions are approved by the ACCD and NRCS. Landowners are required to do a one-time seeding according to NRCS specification #512. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1403. # of riparian acres treated | 0 | 0.0 |
acres improved in various ways acres treated instream acres improved in riparian areas |
Habitat Acres | |
1404. # of upland acres treated | 200.0 | 120.1 |
acres improved in various ways acres treated instream |
Habitat Acres | |
1405. # of wetland acres treated | 0 | 0.0 |
acres improved in various ways acres treated instream |
Habitat Acres | |
1406. # of riparian miles treated | 0 | 0.00 |
miles treated miles of stream improved in riparian areas |
Habitat Miles |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
12943 | 46.115616 | -117.102973 | Washington | Asotin | Blue Mountain | Asotin |