This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $8,132 | $8,132 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 1/1/2009 | 1/15/2009 | Concluded | Pamela Nelle | 11/19/2008 10:05:59 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | Collect and enter quality controlled sediment and temperature data | 4/1/2009 | 12/31/2009 | Concluded | Pamela Nelle | 3/10/2009 3:15:41 PM | |
Description: Quality controlled raw data and quality-controlled, georeferenced, summarized data will be entered into the ATMs or Excel spreadsheets. | |||||||
C | DELIV | Entiat subbasin fine sediment and temperature data | 12/31/2009 | Concluded | Pamela Nelle | 1/16/2009 10:03:19 AM | |
Description: Quality controlled raw data and quality controlled, georeferenced, summarized data of water temperature and fine sediment data, including GPS locations, will be entered and stored in Microsoft Access databases known at Automated Template Modules (ATMs) that will be provided by NOAA Fisheries. Data will be uploaded by December 30, 2009 to the Upper Columbia Data Steward using the ATMs. Notice will be provided to BPA and Terraqua, Inc. when the data has been uploaded. The contractor will be responsible for all quality assurance/quality control steps necessary to ensure that data is properly collected and entered into the ATM. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring | |||
1478. Secondary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring | |||
1495. Secondary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
21224 | 47.731567 | -120.363462 | Washington | Chelan | Columbia Cascade | Entiat |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
BPA Fish and Wildlife Program Monitoring v1.0 | Russell Scranton | Draft | Entiat subbasin temperature and sediment data - US Forest Service (USFS) v1.0 |