Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 56348 (02/01/2012 - 01/31/2013) | $20,000 | $20,000 | ||
2. Amendment 001 (02/01/2012 - 01/31/2013) | $20,000 | $20,000 | ||
3. Amendment 002 (02/01/2012 - 01/31/2013) | $20,000 | $20,000 | ||
4. Amendment 003 (02/01/2012 - 01/31/2013) | $20,000 | $20,000 | ||
Work Element Budget (Current Performance Period) | $20,000 | $20,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | Proof and enter all data | 7/1/2012 | 11/30/2012 | Concluded | Peter Lofy | 10/2/2012 9:17:23 AM | |
Description: Check all field collected data for errors, enter data into various software programs for further analysis and archive. | |||||||
B | Analyze project effectiveness data, compare to literature and past project success | 10/1/2012 | 1/31/2013 | Concluded | Peter Lofy | 10/2/2012 9:17:23 AM | |
Description: Compare collected project effectiveness data to trend and benchmarks and findings found in literature. | |||||||
C | PUBPROTOCOL | Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org | 11/1/2012 | 1/31/2013 | Concluded | Peter Lofy | 10/2/2012 9:17:23 AM |
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
D | DELIV | Data analysis complete | 1/31/2013 | Concluded | Peter Lofy | 10/2/2012 9:17:23 AM | |
Description: Quantitative and qualitative results produced from analysis and interpretation of project effectiveness trend monitoring data. Data and analysis is included in the annual report for the project. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Action Effectiveness Monitoring | Action Effectiveness Monitoring |
Title | Link |
---|---|
NONE - No data repository or not electronically available | N/A |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
Project Effectiveness (2010-077-00) v1.0 | Steve Martin | Draft | Project Monitoring Data Analysis - Umatilla Confederated Tribes (CTUIR) v1.0 |
ID | Name | Type | Optional | Customized Based On | Status |
---|---|---|---|---|---|
157 | Characterizing Stream Morphology, Thalweg Profile v1.0 | Data Collection | No | N/A | Finalized |
239 | Measuring channel constraints v1.0 | Data Collection | No | N/A | Finalized |
240 | Measuring Large Woody Debris (LWD) v1.0 | Data Collection | No | N/A | Finalized |
241 | Measuring Slope And Bearing v1.0 | Data Collection | No | N/A | Finalized |
242 | Measuring Substrate v1.0 | Data Collection | No | N/A | Finalized |
63 | Pools v1.0 | Data Collection | No | N/A | Finalized |
294 | Summary statistics for Floodplain Enhancement Projects v1.0 | Data Analysis/Interpretation | No | N/A | Finalized |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Classification of Ecological or Geological Attribute | Form/Morphology (ID: 31) | Habitat Type: Channels | NA | |
Landscape Form & Geomorphology | Composition/Structure of Habitat Types (ID: 19) | Habitat Type: Altered Habitat | NA | |
Landscape Form & Geomorphology | Distribution of Instream Wood (ID: 25) | NA | NA | |
Landscape Form & Geomorphology | Elevation (ID: 30) | NA | NA | |
Landscape Form & Geomorphology | Gradient (ID: 32) | NA | NA | |
tbd | Landscape Form & Geomorphology | Length/Width/Area (ID: 36) | Habitat Type: Floodplain | NA |
Landscape Form & Geomorphology | Depth: Pool (ID: 37) | NA | NA | |
Landscape Form & Geomorphology | Width to Depth Ratio (ID: 43) | NA | NA | |
Landscape Form & Geomorphology | Width: Flood Prone (ID: 191) | NA | NA | |
Landscape Form & Geomorphology | Structural Stability (ID: 197) | NA | NA | |
Landscape Form & Geomorphology | Water Surface Elevation (ID: 198) | NA | NA | |
tbd | Landscape Form & Geomorphology | Aquatic or Floodplain Geomorphology: Area (ID: 369) | Habitat Type: Channel: Pools | NA |
tbd | Landscape Form & Geomorphology | Density of Instream Wood (ID: 374) | NA | NA |
Sediment/Substrate/Soils | Distribution of Sediment (ID: 225) | NA | NA |
Name | Value |
---|---|
HUC5 - Watershed | Upper Walla Walla River |