2002-034-00 EXP WHEELER COUNTY RIPARIAN BUFFERS
Contract Start Date:
7/1/2012
Contract End Date:
6/30/2013
Title:
D: 122 - Provide Technical Review On Implementation Of Conservation Plan
Description:
After the agreement with the landowner has been approved, Wheeler SWCD will provide additional technical assistance and coordination as necessary to implement the approved plan. Wheeler SWCD will provide technical assistance for CCRP/CREP implementation with NRCS, FSA and landowners especially as to timing and location of riparian tree, shrub and grass plantings as well as other planned conservation practices.
WE Agreement Type:
Contracted
Deliverable Specification:
Provide technical review and assistance to private landowners for CCRP/CREP enrollment, coordination and successful implementation of CCRP/CREP riparian buffer/filter strip system agreements. Coordinate with NRCS, FSA and landowners; especially as to timing and location of riparian tree, scrub and grass plantings and other planned conservation practices. Inspect riparian protective measures as necessary for proper installation and functionality. Collect and validate how effective the implemented conservation plans are working. Verification that buffer systems and practices are installed as planned and in accordance with NRCS FOTG standards. The foregoing includes the bulk of work to be done under this task. In addition, a repeat Visual Assessment protocol once after the riparian buffer system has been in place for minimum of 3-5 years may be accomplished as requested. The follow-up visual assessment is normally done by USDA NRCS.
WSE Effective Budget:
$14,685
% of Total WSE Effective Budget:
18.40%
WSE Start:
07/01/2012
WSE End:
06/30/2013
WSE Completion:
06/30/2013
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $14,685 $14,685

7 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Inspect Buffer Site 7/1/2012 6/30/2013 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:51 PM
Description: When requested by NRCS or the landowner will inspect riparian protective measures for proper installation and functionality.
B Compare Assessment From SVAP 7/1/2012 6/30/2013 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:51 PM
Description: Compare current assessment SVAP with initial assessment (checklist) done during planning.
C Provide Technical Review & Assistance - (July - September) 7/1/2012 9/30/2012 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:52 PM
Description: Provided technical review and assistance to 1 landowner.
D Provide Technical Review & Assistance - (October - December) 10/1/2012 12/31/2012 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:52 PM
Description: Provided technical review and assistance to 1 landowner.
E Provide Technical Review & Assistance - (January - March) 1/1/2013 3/30/2013 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:52 PM
Description: Provided technical review and assistance to 1 landowner.
F Provide Technical Review & Assistance - (April-June) 4/1/2013 6/30/2013 Concluded Herb (WC) Winters (Inactive) 3/29/2012 12:17:53 PM
Description: Provided technical review and assistance to 1 landowner.
G DELIV Provide Technical Review On Implementation Of (3-4 total) Conservation Plan 6/30/2013 Concluded Jamie Cleveland (Inactive) 6/14/2012 4:18:41 PM
Description: Provide technical review and assistance to private landowners for CCRP/CREP enrollment, coordination and successful implementation of CCRP/CREP riparian buffer/filter strip system agreements. Coordinate with NRCS, FSA and landowners; especially as to timing and location of riparian tree, scrub and grass plantings and other planned conservation practices. Inspect riparian protective measures as necessary for proper installation and functionality. Collect and validate how effective the implemented conservation plans are working. Verification that buffer systems and practices are installed as planned and in accordance with NRCS FOTG standards. The foregoing includes the bulk of work to be done under this task. In addition, a repeat Visual Assessment protocol once after the riparian buffer system has been in place for minimum of 3-5 years may be accomplished as requested. The follow-up visual assessment is normally done by USDA NRCS.

This work element does not require Metrics
This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata