Select a work element:
Contract Number:
Contract Title:
2003-017-00 EXP INTEGRATED STATUS & EFFECTIVENESS MONITORING
Contract Start Date:
7/1/2005
Contract End Date:
6/30/2006
Title:
E: 174 - 4.5 Field Manual Development
Description:
Terraqua will develop a field manual suitable for use in training field personnel in the channel, riparian, and macroinvertebrate sampling protocols described in the Upper Columbia Monitoring Strategy (UCMS) as implemented by the ISEMP program in the Wenatchee and Entiat subbasins. This document will use existing documents (including original references used in the UCMS) as much as possible to preserve consistency and minimize costs. A draft of the Field Manual will be developed by January 31, 2005. The draft will be submitted to project cooperators (e.g. WDOE, USFS, et al.) and the RTT for review. The final Field Manual will be completed by March 31, 2006.
WE Agreement Type:
Contracted
Deliverable Specification:
Produce a field personnel training manual incorporating as much information as possible that is currently available. The document should be produced using Microsoft word or other generally accepted format. Any deviation requires prior approval from the BPA COTR.
WSE Effective Budget:
$8,187
% of Total WSE Effective Budget:
4.37%
WSE Start:
07/01/2005
WSE End:
06/23/2006
WSE Completion:
08/16/2006
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $5,944 $8,187

4 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Prepare draft Field Manual 7/1/2005 3/31/2006 Concluded 3/22/2006 5:31:58 PM
Description: Submit draft Field Manual to reviewers by January 31, 2006
B Receive draft field manual comments 2/1/2006 4/21/2006 Concluded 3/22/2006 5:31:58 PM
Description: Allow a one month review period of the draft field manual. Comments are to be submitted during this time to assure completion of the manual no later than March 31, 2006.
C Revise draft Field Manual 2/15/2006 4/30/2006 Concluded 3/22/2006 5:31:58 PM
Description: Incorporate comments from reviewers no later than March 15, 2006
D DELIV Final Field Manual 6/23/2006 Concluded 3/22/2006 5:31:58 PM
Description: Produce a field personnel training manual incorporating as much information as possible that is currently available. The document should be produced using Microsoft word or other generally accepted format. Any deviation requires prior approval from the BPA COTR.

This work element does not require Metrics
Primary Focal Species:
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered); Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
Secondary Focal Species:
None

This work element does not require RM&E metadata