SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $0 | $0 | covered under WE K. 157 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 2/1/2013 | 2/28/2013 | Concluded | Pamela Nelle | 10/30/2012 2:39:12 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | Assist in tagging juvenile salmona and steelhead | 7/1/2013 | 10/31/2013 | Concluded | Pamela Nelle | 10/30/2012 2:39:12 PM | |
Description: USFWS will be part of two, four-person crews tagging juvenile salmon and steelhead as part of the ISEMP fish status and trend monitoring in the Wenatchee (up to 25 sites) and Entiat (up to 25 sites) River subbasins. | |||||||
C | DELIV | PIT tagged fish | 10/31/2013 | Concluded | Pamela Nelle | 10/30/2012 2:39:12 PM | |
Description: Spring Chinook and steelhead captured will be checked for the presence of a passive integrated transponder (PIT) tag, if not tagged they will be anesthetized, and have length and weight measurements recorded and life stage identified prior to being revived and released at the point of capture. Any spring Chinook and steelhead not previously PIT tagged will be tagged with either a 12 mm or 8.5 mm tag dependent upon their size (fork-length). Scale samples will be collected from a subset of steelhead collected. All fish sampling data will be entered either into a data logger, if development is finalized by the start of the field season, or into a site and time specific P3 program file and stored on a laptop computer. The Terraqua project leader will conduct quality assurance and quality control activities and upload PIT tag codes and accompanying biological information (e.g., length, weight, and life history stage) for sampled fish into regional databases (i.e., PTAGIS) and the ISEMP automated template modules for transfer to the ISEMP status and effectiveness monitoring database. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Status and Trend Monitoring | Status and Trend Monitoring | |||
1495. Secondary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Population Status | Population Status |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
74573 | 47.658047 | -120.728747 | Washington | Chelan | Columbia Cascade | Wenatchee |