Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Start Date:
7/1/2013
Contract End Date:
6/30/2014
Title:
J: 141 - Submit BiOp RM&E Report in Taurus for CY 2013
Description:
Submit BiOp RM&E Report in Taurus for Calendar Year 2013. Projects that have claimed that they support one or more RM&E RPAs (i.e., RPAs 50-73) under the FCRPS BiOp are required to report their results. To facilitate the summary of these results across the entire Columbia River Basin, and to provide more clarity as to the format required under the BiOp, separate BiOp reports are now required to be completed online. If desired, the required information can be prepared in MS Word, and be pasted into Taurus.

The online BiOp RPA report in Taurus (https://www.cbfish.org) should include the data, analyses, and data management completed by your project by December 31st. Any activity after the last day of the Calendar Year should be included in a subsequent BiOp report. For example, if you have completed redd surveys, but have not completed the analyses, you will report the preliminary data (# of redds). You do not need to rush your analyses; they may be reported in the subsequent RPA report.

For each RPA, follow the directions in Taurus for each of the three sections and, as appropriate, input graphical or tabular data, accompanied by explanatory text. These are cumulative summary reports and should show relevant results for the life of your project. Each year, note trends and whether they are changing from one year (or groups of years) to the next.
WE Agreement Type:
Contracted
Deliverable Specification:
BiOp RM&E Report in Taurus for Calendar Year 2013.
WSE Effective Budget:
$727
% of Total WSE Effective Budget:
0.31%
WSE Start:
07/01/2013
WSE End:
04/30/2014
WSE Completion:
06/30/2014
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $727 $727

5 Milestones
Sort Type Title Start End Status Modified By Modified Date
A RPA #1 BiOp RM&E Projects: RPA reporting – attend training 7/1/2013 8/31/2013 Concluded Chris Jordan 5/16/2013 3:10:08 PM
Description: [DELETE THIS MILESTONE IF BPA HAS DETERMINED THE PROJECT DOES NOT SUPPORT THE FCRPS BIOP RM&E RPAs (50 through 73)] BiOp reporting requirements are new and somewhat complicated. Review all documentation and training materials in preparation for creating the RPA BiOp report in Taurus: https://www.cbfish.org/Content/tutorials/Sponsor_Reporting_Procedural_Guidance_Final%202-14.docx. (Milestone start/end: March 1 – August 31)
B RPA #2 BiOp RM&E Projects: RPA reporting – download your associated RPA questions from Taurus 7/1/2013 8/31/2013 Concluded Chris Jordan 5/16/2013 3:10:08 PM
Description: [DELETE THIS MILESTONE IF BPA HAS DETERMINED THE PROJECT DOES NOT SUPPORT THE FCRPS BIOP RM&E RPAs (50 through 73)] To prepare for your RPA report, go to Taurus (www.cbfish.org) and find your RPA reporting requirements (those with "Input Needed") so you will know how much time to set aside for this task. (Milestone start/end: June 1 – August 31)
C RPA #3 BiOp RM&E Projects: RPA reporting - complete draft calendar year report in Taurus 9/15/2013 4/30/2014 Concluded Chris Jordan 5/16/2013 3:10:08 PM
Description: [DELETE THIS MILESTONE IF BPA HAS DETERMINED THE PROJECT DOES NOT SUPPORT THE FCRPS BIOP RM&E RPAs (50 through 73)] When you are done, email RMEsupport@bpa.gov and the COTR to send them your working draft in Word or to notify them to review in Taurus. (Milestone start/end: September 15 - January 15)
D RPA #4 BiOp RM&E Projects: RPA reporting – finalize the calendar year 2013 RPA report in Taurus 1/16/2014 4/30/2014 Concluded Sharon Grant (Inactive) 5/20/2013 9:38:38 AM
Description: [DELETE THIS MILESTONE IF BPA HAS DETERMINED THE PROJECT DOES NOT SUPPORT THE FCRPS BIOP RM&E RPAs (50 through 73)] The final version is due 75 days after the end of the calendar year. (Milestone start/end: January 16 - March 15)
E DELIV Biop Report 4/30/2014 Concluded Chris Jordan 5/23/2013 3:36:00 PM
Description: BiOp RM&E Report in Taurus for Calendar Year 2013.

This work element does not require Metrics
This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata