A | 175 | PA-2 engineering design and permitting | Yes | 02/01/2024 | 01/31/2025 | Yes | No | No | No | No | No | No | 02/01/2024 |
B | 175 | PA-3 engineering design for floodplain restoration and CAFO decommissioning. | Yes | 02/01/2024 | 01/31/2025 | Yes | No | No | No | No | No | No | 02/01/2024 |
C | 175 | PA-2 Pendleton 2A Levee setback design and permitting | Yes | 02/01/2024 | 01/31/2025 | Yes | No | No | No | No | No | No | 02/01/2024 |
D | 100 | Construction Observation for CTUIR Cultural Resource Protection Program | No | 02/01/2024 | 01/31/2025 | No | No | No | No | No | No | No | |
E | 100 | Engineering construction observation and management (PA-3/4) | No | 02/01/2024 | 01/31/2025 | No | No | No | No | No | No | No |