A | 175 | Produce Design | PA-2 engineering design and permitting | PA-2 engineering design and permitting including the floodplain restoration project next phases of 90% and 100% and Implementation Plan. | Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU, Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened), Trout, Bull (S. confluentus) (Threatened) | Coho (O. kisutch) - Unspecified Population, Lamprey, Pacific (Entosphenus tridentata), Whitefish, Mountain (Prosopium williamsoni) | |
B | 175 | Produce Design | PA-3 engineering design for floodplain restoration and CAFO decommissioning. | PA-3 engineering design for moving from 60% to 90% and 100% design stages and Implementation Plan including the HIP IV comments and review process for ESA consultation. This will be the floodplain restoration project design and integrate with the CAFO decommissioning, the Taylor Lane secondary channel new bridge and the PA-2 floodplain restoration. | Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU, Coho (O. kisutch) - Unspecified Population, Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) | ||
C | 175 | Produce Design | PA-2 Pendleton 2A Levee setback design and permitting | PA-2 Pendleton 2A Levee setback including the full 408 permitting process for new setback levee and removal of existing levee. | Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU, Coho (O. kisutch) - Unspecified Population, Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened), Trout, Bull (S. confluentus) (Threatened) | ||
D | 100 | Construction Management | Construction Observation for CTUIR Cultural Resource Protection Program | Construction observation for CTUIR Cultural Resource Protection Program. This includes having on-the-ground CRPP technicians observing excavation and other ground disturbing activities that may have impacts to cultural resources and is in compliance with the Section 106 permitting. Also included is the final reporting for the PA-2/3 Section 106 compliance for the NEPA environmental assessment. | Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU, Coho (O. kisutch) - Unspecified Population, Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened), Trout, Bull (S. confluentus) (Threatened) | ||
E | 100 | Construction Management | Engineering construction observation and management (PA-3/4) | Engineering construction observation and management with TetraTech staff as part of the on-going design and construction observation contract. This includes UmaBirch (PA-3/4) Engineering and Consultant Services: Construction Supervision, Inspection & Oversight Tasks and Staking, Construction Support, and As-Built Surveys. | Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU, Coho (O. kisutch) - Unspecified Population, Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened), Trout, Bull (S. confluentus) (Threatened) |