Contract 38456: 1994-015-00 EXP IDAHO FISH SCREENING IMPROVEMENT-IDFG
Viewing 7 of 7 Focal Species
Sort Order
WE ID
Work Element Name
Title
Description
Primary Focal Species
Secondary Focal Species
 A119Manage and Administer ProjectsRoutine administration of contractRoutine administration of contract including accrual and funding package.
 B165Produce Environmental Compliance DocumentationProvide BPA with all enviornmental documentsPerform comprehensive cultural surveys in accordance with approved standards and practices in support of NEPA documentation for fish screens and fish passage projects. This work will be supplied by contract consultant. Perform biological assessments, prepare documentation, and consult with the proper agencies for an ESA Section 7 Informal Consultation for all diversion improvement projects identified in the SOW within anadromous waters occupied by ESA listed species. Prepare and submit routine regulatory paperwork including NEPA compliance checklists, SHPO required documents, CWA Section 404 permits, State and Federal special use permit applications, construction permits, and special validations.
 C114Identify and Select ProjectsDevelop preliminary project proposals.Develop preliminary plans, projects and proposals. Includes coordination meetings with other agencies and private landowners.
 D175Produce DesignTopographic SurveysSurvey proposed project sites. May include screen installation sites, head gate sites, diversion sites, or property boundaries. Develop topographic drawing of these sites and provide suitable temporary bench marks. Some of this work will be supplied by contract consultants.Chinook (Oncorhynchus tshawytscha) - All Populations, Lamprey, Pacific (Entosphenus tridentata), Sockeye (Oncorhynchus nerka) - All Populations, Steelhead (Oncorhynchus mykiss) - All Populations
 E157Collect/Generate/Validate Field and Lab DataStream SurveysPerform fisheries investigations on designated tributary streams to identify species absence or presence, distributions, densities, and habitat inventory. This work includes determination of landowner willingness to participate in future year fisheries improvement projects, mapping irrigation systems, and documentation of seasonal in stream flows, fish passage, and identifying water conservation potential.Chinook (Oncorhynchus tshawytscha) - All Populations, Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations, Lamprey, Pacific (Entosphenus tridentata), Steelhead (Oncorhynchus mykiss) - All Populations
 F185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.
 G132Produce Progress (Annual) ReportSubmit Progress Report for the period June 2008 thru May 2009The progress report summarizes the project goal, objectives, hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or level of effort for contract implementation, including any ramping up or ramping down of contract components or of the project as a whole. Date range June 2008 thru May 2009 will be agreed upon by the COTR and the contractor. This may or may not coincide with the contract period. For an ongoing project, a progress report covering a contract period may be submitted under the subsequent contract, if approved by the COTR. Progress reports must conform to BPA guidelines. See the ''formatting guidelines'' link at the Technical Reports and Publications page: https://www.cbfish.org/Help.mvc/GuidanceDocuments. If producing a technical report for this contract, a discrete experiment, or a peer-reviewed publication, use work element 183: Produce Journal Article.