| A | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | | |
| B | 165 | Produce Environmental Compliance Documentation | Environmental compliance for data collection | Integral to the contract' s success, however the following work is funded by non-BPA sources.
Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | | |
| C | 119 | Manage and Administer Projects | Overall Project Management | Integral to the contract' s success, however the following work is funded by non-BPA sources.
Manage on-the-ground efforts. Also covers administrative work in support of on-the-ground efforts and in support of BPA's programmatic requirements such as metric reporting, financial reporting (e.g., accruals), and development of an SOW package (includes draft SOW, budget, spending plan, and property inventory). | | |
| D | 157 | Collect/Generate/Validate Field and Lab Data | Operate and maintain PIT tag arrays in the Wenatchee Basin | PIT tag arrays in the Wenatchee subbasin are subject to environmental conditions that may reduce performance or result in failure of the system. WDFW will continuously remotely monitor the 7 active ISEMP PIT tag arrays (lower and upper Wenatchee, Peshastin Creek, lower and upper Chiwawa, and lower and upper Nason) to ensure performance is optimized. WDFW will follow the maintenance schedule outlined in work element C milestones. An additional site in the middle Wenatchee River is currently inoperable and may be moved to an alternate location if funding becomes available. WDFW will design, build and install any replacement parts needed as conditions and funding allows. Currently all PIT tag data is automatically sent to QCI servers in Boise and subsequently uploaded to PTAGIS.
Array Name Array Latitude Array Longitude Array Subbasin Array Stream Array ID Array Start Date
Lower Wenatchee 47.46495 -120.350639 Lower Wenatchee Wenatchee River LWE 2010
Peshastin Creek 47.548485 -120.609882 Lower Wenatchee Peshastin Creek PES 2007
Middle Wenatchee 47.623032 -120.72619 Lower Wenatchee Wenatchee River MWE 2008
Chiwawa Lower 47.787548 -120.653864 Upper Wenatchee Chiwawa River CHL 2008
Chiwawa Upper 47.843795 -120.665435 Upper Wenatchee Chiwawa River CHU 2008
Upper Wenatchee 47.796217 -120.663677 Upper Wenatchee Wenatchee River UWE 2012
Nason Lower 47.802382 -120.713454 Upper Wenatchee Nason Creek NAL 2008
Nason Upper 47.785981 -120.848546 Upper Wenatchee Nason Creek NAU 2008 | Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered), Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) | |
| E | 132 | Produce Progress (Annual) Report | Reporting contribution for RME and Lessons Learned | ISEMP will update the lessons learned synthesis report for FY16 by compiling the work of all ISEMP contractors (from each of the three pilot subbasins and the umbrella group), describing ISEMP's progress in FY16 in relation to its proposed goals and objectives, and documents changes in protocols/indicators being monitored that have resulted from data collected over the course of the program. This work will be coordinated by Terraqua Inc., and depends on the collaboration and input of all ISEMP contractors.
Programmatic ISEMP FCRPS BiOp reports will be coordinated, compiled, and submitted to BPA by Terraqua Inc., using the BPA-supplied reporting template. Both the RM&E Technical Report Template and Annual RPA report will be generated at the project, or ISEMP, level. Each contract holder within the project will provide the necessary information to complete these reports, and the overall report production and completion will be coordinated and delivered as part of the Terraqua contract. Data collected under this project are sent to the PTAGIS database for storage and subsequent analysis. | | |