SOW Report
Contract 72244: 2009-012-00 EXP SNAG BOAT BEND/SAM DAWS REFORESTATION PHASE 2
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
72244
Contract Title:
2009-012-00 EXP SNAG BOAT BEND/SAM DAWS REFORESTATION PHASE 2
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract involves the reforestation of 55 acres of historic floodplain forest at two sites along the mainstem Willamette River south of Corvallis.
Account Type(s):
Expense
Contract Start Date:
04/15/2016
Contract End Date:
04/14/2017
Current Contract Value:
$159,713
Expenditures:
$159,713

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarker
500 m
2000 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dana Dedrick Long Tom Watershed Council No Supervisor coordinator@longtom.org (541) 338-7055
Steven Gagnon Bonneville Power Administration Yes COR skgagnon@bpa.gov (503) 230-3375
Jed Kaul Long Tom Watershed Council Yes Contract Manager jkaul@longtom.org (541) 654-8965x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Amy Mai Bonneville Power Administration Yes Interested Party aemai@bpa.gov (503) 230-7349
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Justin Moffett Bonneville Power Administration Yes Env. Compliance Lead jtmoffett@bpa.gov (503) 230-3233
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing 6 of 6 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A154840165Produce Environmental Compliance DocumentationEC Compliance DocumentationContractor staff will work with BPA EC lead to acquire all necessary environmental compliance documentation.$5000.31%04/15/201604/14/2017
B154837185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$6000.38%07/01/201604/14/2017
C154838119Manage and Administer ProjectsContract managementThis work element includes all tasks required to coordinate, plan, and ensure successful implementation of the project.$36,56322.89%04/15/201604/14/2017
D15483947Plant VegetationFloodplain reforestation at Snag Boat Bend (39 acres)Selected planting sites will be prepared for planting using mechanical and chemical methods in spring/summer/fall 2016. Best management practices will be followed to effectively control non-native vegetation present at the planting sites. Once sites are prepared for planting, a combination of native graminoids, sedges, rushes, shrubs, and trees will be installed in fall 2016 through spring 2017. A combination of seed, plugs, divisions, bareroot, and live-stake planting stock will be used. Plantings will be maintained using targeted herbicide applications and mowing for 5 years following planting.$87,30054.66%04/15/201604/14/2017
E15750747Plant VegetationFloodplain reforestation at Sam Daws landing (16 acres)Selected planting sites will be prepared for planting using mechanical and chemical methods in spring/summer/fall 2016. Best management practices will be followed to effectively control non-native vegetation present at the planting sites. Once sites are prepared for planting, a combination of native graminoids, sedges, rushes, shrubs, and trees will be installed in fall 2016 through spring 2017. A combination of seed, plugs, divisions, bareroot, and live-stake planting stock will be used. Plantings will be maintained using targeted herbicide applications and mowing for 5 years following planting.$33,95021.26%04/15/201604/14/2017
F157526132Produce Progress (Annual) ReportSubmit Progress Report for the period (APR 2016) to (APR 2017)The progress report summarizes the project goal, objectives, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. Non-technical Progress Reports must conform to BPA guidelines. See the "Non-technical Progress Report" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments.$8000.50%03/01/201704/14/2017
      
$159,713
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Procurement of all necessary environmental approvals. A: 165. EC Compliance Documentation 04/14/2017 04/14/2017
All administrative tasks fulfilled with timely quality products C: 119. Contract management 04/14/2017 04/14/2017
Reforestation of 39 acres of historic floodplain forest at Snag Boat Bend D: 47. Floodplain reforestation at Snag Boat Bend (39 acres) 04/14/2017 04/14/2017
Reforestation of 16 acres of historic floodplain forest at Sam Daws Landing. E: 47. Floodplain reforestation at Sam Daws landing (16 acres) 04/14/2017 04/14/2017
Completed Annual Report F: 132. Submit Progress Report for the period (APR 2016) to (APR 2017) 04/14/2017 04/14/2017

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 2 instances of WE 47 Plant Vegetation
Cutthroat Trout, Coastal (O. c. clarkii) - Upper Willamette River ESU
  • 2 instances of WE 47 Plant Vegetation
Trout, Rainbow (Oncorhynchus mykiss)
  • 2 instances of WE 47 Plant Vegetation
Wildlife
  • 2 instances of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 EC Compliance Documentation 04/15/2016
B 185 Periodic Status Reports for BPA 04/15/2016
C 119 Contract management 04/15/2016
D 47 Floodplain reforestation at Snag Boat Bend (39 acres)
E 47 Floodplain reforestation at Sam Daws landing (16 acres) 03/28/2017
F 132 Submit Progress Report for the period (APR 2016) to (APR 2017) 04/15/2016