This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
118 | Upland is defined as above the elevation of the riparian zone (above the floodplain). To determine total miles treated, we will sum the upland and riparian mileage. | 33 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
33. Decommission Road/Relocate Road | Expired | Any activity that makes a road or trail unusable including adding berms, pits, boulders or logs, and/or ripping, scarifying, recontouring, or obliterating the road or trail with heavy equipment that may involve re-contouring the slope. Also use for building a road or trail in a more appropriate location to replace a decommissioned road or trail. If decommissioning by planting vegetation or seeding use 47. Plant Vegetation. If removal of fish barrier (e.g., culvert) is included, also use 85. Remove/Breach Fish Passage Barrier, or 184. Install Fish Passage Structure. If work also involves channel realignment, use 30. Realign, Connect, and/or Create Channel in addition to this work element. | 2009 | 2010 | 118 | Upland is defined as above the elevation of the riparian zone (above the floodplain). To determine total miles treated, we will sum the upland and riparian mileage. | Required | Yes | No | No |