This page shows which work elements use this metric.
Metric Guidance ID | Description | Used on Work Elements |
---|---|---|
311 | Identify the total acres of habitat treated in this habitat zone.; Freshwater Non-Tidal: Habitat with freshwater flowing in a channel or watercourse, including lakes, ponds, and adjacent areas below the high water mark that is not subject to the tidal influence of the estuarine zone.; Full removal: removes the full length of dike in the project area such that full connectivity and full functionality is restored. ; | 180 |
Work Element | Work Element Association Status | Description | FY Start | FY End | Guidance ID | Guidance | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
180. Enhance Floodplain/Remove, Modify, Breach Dike | Active | This work element is intended for the full or partial removal, breaching, lowering, and/or relocation/set-back of artificial levees or dikes adjacent to streams and estuaries for the purpose of floodplain, riparian habitat improvements. This WE may be the main emphasis of a stream habitat restoration project, or it may be a component of a broader set of techniques implemented in concert which collectively define a project. When this WE is used, the contract must also include 175. Produce Design . If the work includes improvement of fish passage into upstream reaches of the existing channel, then use 84. Remove/Install Diversion (Expired) , 85. Remove/Breach Fish Passage Barrier , or 184. Install Fish Passage Structure . If work is to create, restore, or enhance wetland function then use 181. Create, Restore, and/or Enhance Wetland . |
2011 | 311 | Identify the total acres of habitat treated in this habitat zone.; Freshwater Non-Tidal: Habitat with freshwater flowing in a channel or watercourse, including lakes, ponds, and adjacent areas below the high water mark that is not subject to the tidal influence of the estuarine zone.; Full removal: removes the full length of dike in the project area such that full connectivity and full functionality is restored. ; | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids |
Measure | HLI |
---|---|
acres improved in various ways | Habitat Acres |
acres treated instream | |
acres improved in riparian areas |
Yes
PNSHP Metric Association | Work Element |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.9 Estuarine/Nearshore Project C.9.d.1 Dike or berm modification/removal C.9.d.3 Acres of habitat made available to salmonids |
180. Enhance Floodplain/Remove, Modify, Breach Dike |