This page presents detailed associations and definitions for this Work Element. Information on how this Work Element is being used in BPA field work is also included.
Metric | Metric Association Status | Last Comment Date | Last Comment By | Unit Type | FY Start | FY End | Required / Optional | Is Activated By Default | Included in PI | Supports PCSRF/PNSHP (Katz) | PNSHP Metric Code | PNSHP Metric |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1441: # of miles of habitat accessed to the next upstream barrier(s) or likely limit of habitable range | Active | number | 2010 | 2025 | Required | Yes | Yes | No | ||||
ITS Action Category:
Habitat Access
ITS Metric:
Miles accessable
|
||||||||||||
1517: # of acres of riparian non-wetland habitat treated | Active | number | 2010 | Required | Yes | Yes | No | |||||
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
|
||||||||||||
1672: # of acres of habitat treated by full dike removal in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1673: # of acres of habitat treated by full dike removal in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1674: # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1675: # of acres of habitat treated by dike breaching in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1676: # of acres of habitat treated by dike breaching in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1677: # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1678: # of acres of habitat treated by dike setbacks in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1679: # of acres of habitat treated by dike setbacks in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1680: # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | |||
1681: # of miles of dike removed or modified by Full removal in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
|
||||||||||||
1682: # of miles of dike removed or modified by Dike breaching in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
|
||||||||||||
1683: # of miles of dike removed or modified by Dike Setbacks in the Riparian zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
|
||||||||||||
1684: # of miles of dike removed or modified by Full removal in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1685: # of miles of dike removed or modified by Dike breaching in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1686: # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone | Active | number | 2011 | Required | Yes | Yes | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1687: # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1688: # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1689: # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone | Active | number | 2011 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1725: Full dike removal | Active | YesNoList | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
|
||||||||||||
1726: Partial dike removal | Active | YesNoList | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
|
||||||||||||
1727: Dike breaching | Active | YesNoList | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
|
||||||||||||
1728: Dike setback | Active | YesNoList | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
|
||||||||||||
1729: Dike height reduction | Active | YesNoList | 2011 | Required | Yes | Yes | No | |||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
|
||||||||||||
1730: # of miles of dike removed or treated | Active | number | 2011 | Optional | Yes | Yes | Yes | C.9.d.2 | Miles of dike(s) removed/modified | |||
1403: # of riparian acres treated | Expired | number | 2008 | 2009 | Required | Yes | No | No | ||||
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of fencing
|
||||||||||||
1405: # of wetland acres treated | Expired | number | 2008 | 2009 | Required | Yes | No | No | ||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1474: # of acres treated | Expired | number | 2005 | 2007 | Required | Yes | No | No | ||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1518: # of acres of riparian wetland habitat treated | Expired | number | 2010 | 2010 | Required | Yes | No | No | ||||
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
|
||||||||||||
1519: # of acres of freshwater non-wetland habitat treated | Expired | number | 2010 | 2010 | Required | Yes | No | No | ||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1520: # of acres of freshwater wetland habitat treated | Expired | number | 2010 | 2010 | Required | Yes | No | No | ||||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
|
||||||||||||
1521: # of acres of estuarine wetland habitat treated | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | ||
1522: # of acres of estuarine non-wetland habitat treated | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.9.d.3 | Acres of habitat made available to salmonids | ||
1563: # of barriers in the freshwater zone | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.2.c.2 | Number of blockages/impediments/barriers removed/altered | ||
ITS Action Category:
Habitat Access
ITS Metric:
Number of barriers addressed
|
||||||||||||
1564: # of barriers in the estuarine zone | Expired | number | 2010 | 2010 | Required | Yes | No | No | ||||
1565: # of miles of dike removed or modified in the freshwater area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | ||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
|
||||||||||||
1566: # of miles of dike removed or modified in the estuary area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | ||
1567: # of miles of dike removed or modified in the riparian area | Expired | number | 2010 | 2010 | Required | Yes | No | Yes | C.9.d.2 | Miles of dike(s) removed/modified | ||
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
|
Yes
PNSHP Metric Association | Metric |
---|---|
C.0 Salmonid Habitat Restoration and Acquisition C.2 Fish Passage Improvement C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i) C.2.c.2 Number of blockages/impediments/barriers removed/altered |
1563: # of barriers in the freshwater zone |
C.0 Salmonid Habitat Restoration and Acquisition C.9 Estuarine/Nearshore Project C.9.d.1 Dike or berm modification/removal C.9.d.2 Miles of dike(s) removed/modified |
1565: # of miles of dike removed or modified in the freshwater area 1566: # of miles of dike removed or modified in the estuary area 1567: # of miles of dike removed or modified in the riparian area 1681: # of miles of dike removed or modified by Full removal in the Riparian zone 1682: # of miles of dike removed or modified by Dike breaching in the Riparian zone 1683: # of miles of dike removed or modified by Dike Setbacks in the Riparian zone 1684: # of miles of dike removed or modified by Full removal in the Estuarine zone 1685: # of miles of dike removed or modified by Dike breaching in the Estuarine zone 1686: # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone 1687: # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone 1688: # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone 1689: # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone 1730: # of miles of dike removed or treated |
C.0 Salmonid Habitat Restoration and Acquisition C.9 Estuarine/Nearshore Project C.9.d.1 Dike or berm modification/removal C.9.d.3 Acres of habitat made available to salmonids |
1521: # of acres of estuarine wetland habitat treated 1522: # of acres of estuarine non-wetland habitat treated 1672: # of acres of habitat treated by full dike removal in the Riparian zone 1673: # of acres of habitat treated by full dike removal in the Estuarine zone 1674: # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone 1675: # of acres of habitat treated by dike breaching in the Riparian zone 1676: # of acres of habitat treated by dike breaching in the Estuarine zone 1677: # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone 1678: # of acres of habitat treated by dike setbacks in the Riparian zone 1679: # of acres of habitat treated by dike setbacks in the Estuarine zone 1680: # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone |
This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.
Number of active contracts using Work Element #180 by FY
Top 5 BPA Project Managers using this Work Element: | ||
---|---|---|
(by number of current contracts) | ||
Tracy Hauser | 17 | |
Jamie Cleveland (Inactive) | 16 | |
Anne Creason | 16 | |
Jesse Wilson | 13 | |
Jennifer Lord | 10 | |
Average Work Element Budget: | $212,904 | |
Average Duration: | 10 months |