Summary

<<
<
>
>>
Work Element 180: Enhance Floodplain/Remove, Modify, Breach Dike - Published
WE Name:
180. Enhance Floodplain/Remove, Modify, Breach Dike (Remove Levee)
Work Category:
Habitat - Habitat Improvement
WE Agreement Type:
Contracted
Status:
Active
Owner:
Definition:
This work element is intended for the full or partial removal, breaching, lowering, and/or relocation/set-back of artificial levees or dikes adjacent to streams and estuaries for the purpose of floodplain, riparian habitat improvements. This WE may be the main emphasis of a stream habitat restoration project, or it may be a component of a broader set of techniques implemented in concert which collectively define a project.

When this WE is used, the contract must also include 175. Produce Design . If the work includes improvement of fish passage into upstream reaches of the existing channel, then use 84. Remove/Install Diversion (Expired) , 85. Remove/Breach Fish Passage Barrier , or 184. Install Fish Passage Structure . If work is to create, restore, or enhance wetland function then use 181. Create, Restore, and/or Enhance Wetland .
WSE Description Template:
As identified in [PRIORITIZATION FRAMEWORK] floodplain reconnection at this location will address [FLOODPLAIN CONDITION, ALTERED PRIMARY PRODUCTIVITY, HABITAT QUANTITY COMPETITION, ALTERED FLOW TIMING, ETC] limiting habitat factors, for [SPECIES] limiting life stages including [INCUBATION/EMERGENCE, SUMMER/WINTER REARING, ETC]. [DESCRIBE WORK ELEMENT PURPOSE].

Floodplain will be enhanced through the [REMOVAL/MODIFICATION/BREACHING] of XX feet of [BERM/LEVEE/DIKE], [AND/OR] floodplain shaping, and installation of roughness features [LWD, CHANNEL FILL, BOULDERS, LOW TECH]. The floodplain enhancement is expected to provide inundation for [TIMEFRAME AND DURATION] to XX acres of floodplain.

The [REMOVAL/MODIFICATION/BREACHING/FLOODPLAIN SHAPING/ROUGHNESS]
will be completed by [DESCRIBE CONSTRUCTION METHODS AND WHO WILL COMPLETE THE WORK (STAFF OR SUBCONTRACTOR)]. Spoils will be [DESCRIBE DISPOSITION]. [AFTER INSERTING RELEVANT TEXT WITHIN ALL BRACKETS, DELETE THESE BRACKETS]
Effective Dates:
FY2005 to <no end date>
Work Phase:
construction/implementation
Sort Sequence:
5.17
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes


Deliverable Status:
Required
Default Deliverable Desc:
Potential Deliverables:
  • Levee/berm/dike removed AND/OR floodplain enhanced per approved design set resulting in [SUMMAY OF HABITAT METRICS GAINED].
  • Completed enhancements to the specified areas of flood plain

  • Rule 1 (Environmental Compliance): Any associated ESA, cultural resources, NEPA, permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.

    Example: You're going to be breaching portions of a levee adjacent to Big River. Big River is populated with bull trout and there are bald eagle nests in the area. Big River flows adjacent to culturally sensitive areas. Any ESA consultation, obtaining of permits, or cultural resource surveys that may be conducted prior to the start of work should be listed under 165. Produce Environmental Compliance Documentation.


    WE: 180. Enhance Floodplain/Remove, Modify, Breach Dike
    WE Title: Breaching Big River levee

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Complete cultural survey for Big River levee breaching.

  • Rule 2 (Location of Work): (location of work)Each location where a dike or levee is to be constructed must be listed under its own work element, and the location should be included in the work element title field. Each location of any proposed breach in a dike or levee must be listed under its own work element. Any activity such as adding large woody debris (LWD) to the designated flood plain must also be listed under its own work element. You may use 180. Enhance Floodplain/Remove, Modify, Breach Dike as many times as necessary in a Statement of Work to identify different locations.

    Example: Your plan calls for the breaching of the Smith Levee at two locations, then adding LWD to both flood plain areas. At the first location (site #1) closest to Big River you plan to breach Smith Levee by placing a culvert though the levee with a water control structure at its head for flood control. This breach action would be listed under its own work element. The addition of LWD (or roughness material) to the flood plain area behind this breach would also be listed under its own work element.

    The second breach (site #2) is to occur more distant from Big River and involves the removal of materials from Smith levee. This action must be listed under its own work element. In addition the placement of LWD behind this breach must also be listed under its own work element. For all of these actions, use 180. Enhance Floodplain/Remove, Modify, Breach Dike. You may use a work element as many times as necessary in a Statement of Work to identify different locations or actions.


    WE: 180. Enhance Floodplain/Remove, Modify, Breach Dike
    WE Title: Breach #1 Smith levee with water control structure at Big River.
    Deliverable: Water control structure installed at Big River.

    WE: 180. Enhance Floodplain/Remove, Modify, Breach Dike
    WE Title: Breach #2 Smith levee and remove material.
    Deliverable: Breach of Smith levee complete and 6 cubic tons of material removed

    WE: 180. Enhance Floodplain/Remove, Modify, Breach Dike
    WE Title: Add LWD at Big River site
    Deliverable: LWD added in 15 acre area (site #1)

    WE: 180. Enhance Floodplain/Remove, Modify, Breach Dike
    WE Title: Add LWD at Smith levee breach site #2.
    Deliverable: LWD added and anchored down in 5-acre area (site #2)

  • Rule 3 (Metrics): If floodplain enhancement is part of a connected effort to correct multiple problems at a single location, each with different metrics, split out each as a separate work element.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Supplies/materials/equipment delivered
Recommended
No
Materials necessary for completion of restoration actions acquired and staged onsite.
Implement approved habitat design
Recommended
No
Implement habitat actions in accordance with approved plan set. Milestone dates include staging and site cleanup and all in-water work will be conducted during the approved in-water work window.
Excess spoils disposed of in accordance with approved designs
Recommended
No
Spoils from levee/berm/dike modification will be disposed of in accordance with approved design set.
Seed or stabilize areas disturbed by construction activities
Recommended
No
Seed or stabilize disturbed areas with native seed mix in accordance with designs and permit requirements.
Discuss HIP ESA coverage with BPA EC Lead; obtain HIP risk determination
Suggested
No
The EC Lead will determine if work under this work element may be able to have ESA-coverage (NMFS & USFWS) under the current version of the Habitat Improvement Program Biological Opinions (HIP BiOps). Work that qualifies must comply with conservation measures in the HIP Handbook. Medium to high risk projects will require a technical review by the Bonneville Engineering Technical Services. Before conceptual design commences, contact the EC lead for HIP applicability, instructions and information requirements.

The HIP activity categories and risk criteria are located in the “Note” section of the work element background page here:https://www.cbfish.org/WorkElement.mvc/Summary/165
Produce site plan
Suggested
No
Plan should include diagrams of features to be added or removed, excavation grades (if applicable) and listings of type and locations of all water control structures to be installed.
Negotiations with landowners completed
Suggested
No
Subcontractor hired for implementation
Suggested
No
Materials for implementation obtained
Suggested
No
GIS recording of project area
Suggested
No
Provide final metrics
Suggested
No
Verify implemented work is consistent with planned metrics and update final metrics in cbfish.


39 Metrics Associated With Work Element 180: Enhance Floodplain/Remove, Modify, Breach Dike

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1441: # of miles of habitat accessed to the next upstream barrier(s) or likely limit of habitable range Active number 2010 2025 Required Yes Yes No
ITS Action Category:
Habitat Access
ITS Metric:
Miles accessable
1517: # of acres of riparian non-wetland habitat treated Active number 2010 Required Yes Yes No
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1672: # of acres of habitat treated by full dike removal in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1673: # of acres of habitat treated by full dike removal in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.3 Acres of habitat made available to salmonids
1674: # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
1675: # of acres of habitat treated by dike breaching in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1676: # of acres of habitat treated by dike breaching in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.3 Acres of habitat made available to salmonids
1677: # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
1678: # of acres of habitat treated by dike setbacks in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1679: # of acres of habitat treated by dike setbacks in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.3 Acres of habitat made available to salmonids
1680: # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
1681: # of miles of dike removed or modified by Full removal in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
1682: # of miles of dike removed or modified by Dike breaching in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
1683: # of miles of dike removed or modified by Dike Setbacks in the Riparian zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
1684: # of miles of dike removed or modified by Full removal in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.2 Miles of dike(s) removed/modified
1685: # of miles of dike removed or modified by Dike breaching in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.2 Miles of dike(s) removed/modified
1686: # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone Active number 2011 Required Yes Yes Yes C.9.d.2 Miles of dike(s) removed/modified
1687: # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
1688: # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
1689: # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone Active number 2011 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
1725: Full dike removal Active YesNoList 2011 Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
1726: Partial dike removal Active YesNoList 2011 Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
1727: Dike breaching Active YesNoList 2011 Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
1728: Dike setback Active YesNoList 2011 Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
1729: Dike height reduction Active YesNoList 2011 Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
1730: # of miles of dike removed or treated Active number 2011 Optional Yes Yes Yes C.9.d.2 Miles of dike(s) removed/modified
1403: # of riparian acres treated Expired number 2008 2009 Required Yes No No
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of fencing
1405: # of wetland acres treated Expired number 2008 2009 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1474: # of acres treated Expired number 2005 2007 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1518: # of acres of riparian wetland habitat treated Expired number 2010 2010 Required Yes No No
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1519: # of acres of freshwater non-wetland habitat treated Expired number 2010 2010 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1520: # of acres of freshwater wetland habitat treated Expired number 2010 2010 Required Yes No No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1521: # of acres of estuarine wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
1522: # of acres of estuarine non-wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.9.d.3 Acres of habitat made available to salmonids
1563: # of barriers in the freshwater zone Expired number 2010 2010 Required Yes No Yes C.2.c.2 Number of blockages/impediments/barriers removed/altered
ITS Action Category:
Habitat Access
ITS Metric:
Number of barriers addressed
1564: # of barriers in the estuarine zone Expired number 2010 2010 Required Yes No No
1565: # of miles of dike removed or modified in the freshwater area Expired number 2010 2010 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback
1566: # of miles of dike removed or modified in the estuary area Expired number 2010 2010 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
1567: # of miles of dike removed or modified in the riparian area Expired number 2010 2010 Required Yes No Yes C.9.d.2 Miles of dike(s) removed/modified
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Extent of dike removal or setback

Measure HLI Associated Metrics
acres improved in riparian areas 1403. # of riparian acres treated
1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
1672. # of acres of habitat treated by full dike removal in the Riparian zone
1673. # of acres of habitat treated by full dike removal in the Estuarine zone
1674. # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone
1675. # of acres of habitat treated by dike breaching in the Riparian zone
1676. # of acres of habitat treated by dike breaching in the Estuarine zone
1677. # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone
1678. # of acres of habitat treated by dike setbacks in the Riparian zone
1679. # of acres of habitat treated by dike setbacks in the Estuarine zone
1680. # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone
acres improved in various ways Habitat Acres 1474. # of acres treated
1405. # of wetland acres treated
1403. # of riparian acres treated
1672. # of acres of habitat treated by full dike removal in the Riparian zone
1673. # of acres of habitat treated by full dike removal in the Estuarine zone
1674. # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone
1675. # of acres of habitat treated by dike breaching in the Riparian zone
1676. # of acres of habitat treated by dike breaching in the Estuarine zone
1677. # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone
1678. # of acres of habitat treated by dike setbacks in the Riparian zone
1679. # of acres of habitat treated by dike setbacks in the Estuarine zone
1680. # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone
acres treated Habitat Acres 1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
acres treated instream 1474. # of acres treated
1405. # of wetland acres treated
1403. # of riparian acres treated
1517. # of acres of riparian non-wetland habitat treated
1518. # of acres of riparian wetland habitat treated
1519. # of acres of freshwater non-wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1522. # of acres of estuarine non-wetland habitat treated
1672. # of acres of habitat treated by full dike removal in the Riparian zone
1673. # of acres of habitat treated by full dike removal in the Estuarine zone
1674. # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone
1675. # of acres of habitat treated by dike breaching in the Riparian zone
1676. # of acres of habitat treated by dike breaching in the Estuarine zone
1677. # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone
1678. # of acres of habitat treated by dike setbacks in the Riparian zone
1679. # of acres of habitat treated by dike setbacks in the Estuarine zone
1680. # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone
miles of dike removed or modified 1565. # of miles of dike removed or modified in the freshwater area
1566. # of miles of dike removed or modified in the estuary area
1567. # of miles of dike removed or modified in the riparian area
1681. # of miles of dike removed or modified by Full removal in the Riparian zone
1682. # of miles of dike removed or modified by Dike breaching in the Riparian zone
1683. # of miles of dike removed or modified by Dike Setbacks in the Riparian zone
1684. # of miles of dike removed or modified by Full removal in the Estuarine zone
1685. # of miles of dike removed or modified by Dike breaching in the Estuarine zone
1686. # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone
1687. # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone
1688. # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone
1689. # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone
miles of habitat accessed Passage Barriers 1441. # of miles of habitat accessed to the next upstream barrier(s) or likely limit of habitable range

CBFish Metric Set
acres improved in various ways (Required)
Habitat Zone The Type of Dike Treatment Metric ID and Name Required?
Riparian Full removal 1672. # of acres of habitat treated by full dike removal in the Riparian zone Required
Estuarine Full removal 1673. # of acres of habitat treated by full dike removal in the Estuarine zone Required
Freshwater Non-Tidal Full removal 1674. # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone Required
Riparian Dike breaching 1675. # of acres of habitat treated by dike breaching in the Riparian zone Required
Estuarine Dike breaching 1676. # of acres of habitat treated by dike breaching in the Estuarine zone Required
Freshwater Non-Tidal Dike breaching 1677. # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone Required
Riparian Dike Setbacks 1678. # of acres of habitat treated by dike setbacks in the Riparian zone Required
Estuarine Dike Setbacks 1679. # of acres of habitat treated by dike setbacks in the Estuarine zone Required
Freshwater Non-Tidal Dike Setbacks 1680. # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone Required
miles of dike removed or modified (Required)
Habitat Zone The Type of Dike Treatment Metric ID and Name Required?
Riparian Full removal 1681. # of miles of dike removed or modified by Full removal in the Riparian zone Required
Riparian Dike breaching 1682. # of miles of dike removed or modified by Dike breaching in the Riparian zone Required
Riparian Dike Setbacks 1683. # of miles of dike removed or modified by Dike Setbacks in the Riparian zone Required
Estuarine Full removal 1684. # of miles of dike removed or modified by Full removal in the Estuarine zone Required
Estuarine Dike breaching 1685. # of miles of dike removed or modified by Dike breaching in the Estuarine zone Required
Estuarine Dike Setbacks 1686. # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone Required
Freshwater Non-Tidal Full removal 1687. # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone Required
Freshwater Non-Tidal Dike breaching 1688. # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone Required
Freshwater Non-Tidal Dike Setbacks 1689. # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone Required

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.2 Fish Passage Improvement
        C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)
            C.2.c.2 Number of blockages/impediments/barriers removed/altered
1563: # of barriers in the freshwater zone
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.d.1 Dike or berm modification/removal
            C.9.d.2 Miles of dike(s) removed/modified
1565: # of miles of dike removed or modified in the freshwater area
1566: # of miles of dike removed or modified in the estuary area
1567: # of miles of dike removed or modified in the riparian area
1681: # of miles of dike removed or modified by Full removal in the Riparian zone
1682: # of miles of dike removed or modified by Dike breaching in the Riparian zone
1683: # of miles of dike removed or modified by Dike Setbacks in the Riparian zone
1684: # of miles of dike removed or modified by Full removal in the Estuarine zone
1685: # of miles of dike removed or modified by Dike breaching in the Estuarine zone
1686: # of miles of dike removed or modified by Dike Setbacks in the Estuarine zone
1687: # of miles of dike removed or modified by Full removal in the Freshwater Non-Tidal zone
1688: # of miles of dike removed or modified by Dike breaching in the Freshwater Non-Tidal zone
1689: # of miles of dike removed or modified by Dike Setbacks in the Freshwater Non-Tidal zone
1730: # of miles of dike removed or treated
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.d.1 Dike or berm modification/removal
            C.9.d.3 Acres of habitat made available to salmonids
1521: # of acres of estuarine wetland habitat treated
1522: # of acres of estuarine non-wetland habitat treated
1672: # of acres of habitat treated by full dike removal in the Riparian zone
1673: # of acres of habitat treated by full dike removal in the Estuarine zone
1674: # of acres of habitat treated by full dike removal in the Freshwater Non-Tidal zone
1675: # of acres of habitat treated by dike breaching in the Riparian zone
1676: # of acres of habitat treated by dike breaching in the Estuarine zone
1677: # of acres of habitat treated by dike breaching in the Freshwater Non-Tidal zone
1678: # of acres of habitat treated by dike setbacks in the Riparian zone
1679: # of acres of habitat treated by dike setbacks in the Estuarine zone
1680: # of acres of habitat treated by dike setbacks in the Freshwater Non-Tidal zone

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1
Location Guidance:
Identify point where installation, removal or enhancement will take place. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #180 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Tracy Hauser 17
Jamie Cleveland (Inactive) 16
Anne Creason 16
Jesse Wilson 13
Jennifer Lord 10
Average Work Element Budget: $212,904
Average Duration: 10 months