Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
View Work Elements Available in FY:

Summary

<<
<
>
>>
Metric 1728: Dike setback - Published
Metric Type ID:
1728
Metric Name:
Dike setback
Metric Unit Type:
YesNoList
Is Numeric:
No
Precision:

Metric Guidance ID Description  Used on Work Elements
397 Select "yes" or "no" to indicate whether dike setbacks were applied to the project area. A dike setback is used in conjunction with breaching, full removal, or partial removal in a manner where new dikes are created limiting the area of floodplain that is connected to the stream or riparian zone. 180

1 Work Element Associated With Metric 1728: Dike setback

Work Element Work Element Association Status Description FY Start FY End Guidance ID Guidance Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
180. Enhance Floodplain/Remove, Modify, Breach Dike Active This work element is intended for the full or partial removal, breaching, lowering, and/or relocation/set-back of artificial levees or dikes adjacent to streams and estuaries for the purpose of floodplain, riparian habitat improvements. This WE may be the main emphasis of a stream habitat restoration project, or it may be a component of a broader set of techniques implemented in concert which collectively define a project.

When this WE is used, the contract must also include 175. Produce Design . If the work includes improvement of fish passage into upstream reaches of the existing channel, then use 84. Remove/Install Diversion (Expired) , 85. Remove/Breach Fish Passage Barrier , or 184. Install Fish Passage Structure . If work is to create, restore, or enhance wetland function then use 181. Create, Restore, and/or Enhance Wetland .
2011 397 Select "yes" or "no" to indicate whether dike setbacks were applied to the project area. A dike setback is used in conjunction with breaching, full removal, or partial removal in a manner where new dikes are created limiting the area of floodplain that is connected to the stream or riparian zone. Required Yes Yes No
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Dike removal or setback
Rationale: