Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
View Work Elements Available in FY:

Summary

<<
<
>
>>
Work Element 181: Create, Restore, and/or Enhance Wetland - Published
WE Name:
181. Create, Restore, and/or Enhance Wetland (Establish Wetland)
Work Category:
Habitat - Habitat Improvement
WE Agreement Type:
Contracted
Status:
Active
Owner:
Definition:
This work element is intended for the creation, restoration, or enhancement of wetland hydrologic, water quality, or habitat functions. Actions include installation of a water control structure, re-contouring, or floodplain reconnection . Wetland creation (establishment) is the manipulation of physical, chemical, and biological characteristics to develop a wetland on a site where one did not previously exist. Creation results in a gain in wetland acres. Wetland restoration (re-establishment) is the manipulation of the physical, chemical, and/or biological characteristics of a site with the goal of returning natural/historic functions to former wetlands that may have been filled, subsided, or impacted by hydrologic alterations. Restoration reestablishes a former wetland and results in a gain in wetland acres. Wetland enhancement is the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing degraded wetland functions. Wetland enhancement typically involves the manipulation of site characteristics to improve hydrologic, water quality, or habitat functions but does not result in a gain in wetland acreage. This WE may be the main emphasis of a stream/wetland restoration project, or it may be a component of a broader set of techniques implemented in concert which collectively define a project.

When this WE is used, the contract must also include 175. Produce Design . If additional actions or techniques are implemented, make sure you properly document associated work elements, e.g., 180. Enhance Floodplain/Remove, Modify, Breach Dike , 184. Install Fish Passage Structure , or 29. Increase Aquatic and/or Floodplain Complexity , 30. Realign, Connect, and/or Create Channel , or 35. Develop Pond .
WSE Description Template:
As identified in [PRIORITIZATION FRAMEWORK] wetland enhancement at this location will address [FLOODPLAIN CONDITION, ALTERED PRIMARY PRODUCTIVITY, FOOD QUANTITY COMPETITION, ALTERED FLOW TIMING, ETC] limiting habitat factors, for [SPECIES] limiting life stages including [INCUBATION/EMERGENCE, SUMMER/WINTER REARING, ETC]. [DESCRIBE WORK ELEMENT PURPOSE].

Aquatic habitat diversity, water quality, and food resources will be improved through the
[ENHANCEMENT/RESTORATION/CREATION] of XX acres of floodplain wetland by enhancing the (hydrology, vegetation, and/or soil forming processes).

The hydrologic process will be enhanced by...

Vegetation will be enhanced by...

Hydric soils or soil forming processes will be enhanced by...

Wetland creation, restoration, and enhancement will be completed by [DESCRIBE CONSTRUCTION METHODS AND WHO WILL COMPLETE THE WORK (STAFF OR SUBCONTRACTOR)]. [AFTER INSERTING RELEVANT TEXT WITHIN ALL BRACKETS, DELETE THESE BRACKETS]
Effective Dates:
FY2005 to <no end date>
Work Phase:
construction/implementation
Sort Sequence:
5.18
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes


Deliverable Status:
Required
Default Deliverable Desc:
Potential Deliverables:
  • Wetlands created/resorted/enhanced per the approved design set resulting in [SUMMAY OF HABITAT METRICS GAINED].
  • Completion of created wetlands and /or completion of wetland enhancement measures in the specified areas

  • Rule 1 (Environmental Compliance): Any ESA, cultural resources, NEPA, Clean Water Act permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation. This work element is only to cover implementation measures to create, restore, or enhance a wetland.

    Example:

  • Rule 2 (Location of Work): Each created, restored or enhanced wetland location must be listed under its own separate work element. If wetland enhancements are to occur in separate wetlands, the proposed enhancement measures for each of those wetlands warrants its own work element.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Supplies/materials/equipment delivered
Recommended
No
Materials necessary for completion of restoration actions acquired and staged onsite.
Implement approved habitat design
Recommended
No
Implement habitat actions in accordance with approved plan set. Milestone dates include staging and site cleanup and all in-water work will be conducted during the approved in-water work window.
Provide final metrics based on hydrologic observations, modeling or design criteria
Recommended
No
Verify implemented work is consistent with approved design plans and planned metrics and update final metrics in cbfish.

Use best professional judgment to identify areas that are likely to develop wetland hydrology, vegetation, and soils due to the post project hydrologic regime. Wetland development would be reasonably foreseeable in areas that will be annually inundated or saturated within the upper 12 inches of the soil profile for a minimum of two weeks during the growing season. Metric reporting shall be based field observations, hydrologic modeling, or project design criteria.

If additional time is required to for accurate metric reporting the COR will be
contacted.
Discuss HIP ESA coverage with BPA EC Lead; obtain HIP risk determination
Suggested
No
The EC Lead will determine if work under this work element may be able to have ESA-coverage (NMFS & USFWS) under the current version of the Habitat Improvement Program Biological Opinions (HIP BiOps). Work that qualifies must comply with conservation measures in the HIP Handbook. Medium to high risk projects will require a technical review by the Bonneville Engineering Technical Services. Before conceptual design commences, contact the EC lead for HIP applicability, instructions and information requirements.
Submit existing and planned wetland hydrograph for enhancement measures or created wetlands
Suggested
No
Planned hydrograph must show depth, duration, and times of inundation.
Results of well test
Suggested
No
Completion of site plan/excavation plan (may be excerpts from a Management Plan)
Suggested
No
Negotiations with land owners completed
Suggested
No
Subcontractor awarded contract for implementation
Suggested
No
Land area for implementation surveyed and staked
Suggested
No
Begin excavation
Suggested
No
Approximate half-way point of construction
Suggested
No
Completion of excavation for each wetland created
Suggested
No
GIS recording of created wetland or enhanced area
Suggested
No
Provide final metrics
Recommended
No
Verify implemented work is consistent with planned metrics and update final metrics in cbfish.


18 Metrics Associated With Work Element 181: Create, Restore, and/or Enhance Wetland

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1690: # of acres of riparian habitat created Active number 2011 Required Yes Yes Yes C.5.k.3 Acres of streambank treated with other riparian treatment
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1691: # of acres of riparian habitat restored/re-established Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1692: # of acres of riparian habitat rehabilitated/enhanced Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1693: # of acres of estuarine habitat created Active number 2011 Required Yes Yes Yes C.9.q.2 Acres of estuary created
1694: # of acres of estuarine habitat restored/re-established Active number 2011 Required Yes Yes Yes C.9.c.3 Acres of estuary treated
1695: # of acres of estuarine habitat rehabilitated/enhanced Active number 2011 Required Yes Yes Yes C.9.c.3 Acres of estuary treated
1696: # of acres of freshwater non-tidal habitat created Active number 2011 Required Yes Yes Yes C.8.f.2 Artificial wetland acres created
1697: # of acres of freshwater non-tidal habitat restored/re-established Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
1698: # of acres of freshwater non-tidal habitat rehabilitated/enhanced Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
1699: # of acres of upland habitat created Active number 2011 Required Yes Yes Yes C.6.l.2 Acres of upland wetland improved
1700: # of acres of upland habitat restored/re-established Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
1701: # of acres of upland habitat rehabilitated/enhanced Active number 2011 Required Yes Yes Yes C.8.e.2 Acres of wetland treated
1403: # of riparian acres treated Expired number 2008 2009 Required Yes No Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Miles of fencing
1404: # of upland acres treated Expired number 2008 2009 Required Yes No Yes C.8.e.2 Acres of wetland treated
1474: # of acres treated Expired number 2005 2009 Required Yes No Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1518: # of acres of riparian wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Riparian Habitat Improvement
ITS Metric:
Area/length of riparia treated
1520: # of acres of freshwater wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.8.e.2 Acres of wetland treated
ITS Action Category:
Floodplain/Wetland Improvement
ITS Metric:
Amount of floodplain reconnected
1521: # of acres of estuarine wetland habitat treated Expired number 2010 2010 Required Yes No Yes C.8.e.2 Acres of wetland treated

Measure HLI Associated Metrics
acres improved in riparian areas 1403. # of riparian acres treated
1518. # of acres of riparian wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1690. # of acres of riparian habitat created
1691. # of acres of riparian habitat restored/re-established
1692. # of acres of riparian habitat rehabilitated/enhanced
1693. # of acres of estuarine habitat created
1694. # of acres of estuarine habitat restored/re-established
1695. # of acres of estuarine habitat rehabilitated/enhanced
1696. # of acres of freshwater non-tidal habitat created
1697. # of acres of freshwater non-tidal habitat restored/re-established
1698. # of acres of freshwater non-tidal habitat rehabilitated/enhanced
acres improved in various ways Habitat Acres 1474. # of acres treated
1403. # of riparian acres treated
1404. # of upland acres treated
acres treated Habitat Acres 1518. # of acres of riparian wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1690. # of acres of riparian habitat created
1691. # of acres of riparian habitat restored/re-established
1692. # of acres of riparian habitat rehabilitated/enhanced
1693. # of acres of estuarine habitat created
1694. # of acres of estuarine habitat restored/re-established
1695. # of acres of estuarine habitat rehabilitated/enhanced
1696. # of acres of freshwater non-tidal habitat created
1697. # of acres of freshwater non-tidal habitat restored/re-established
1698. # of acres of freshwater non-tidal habitat rehabilitated/enhanced
1699. # of acres of upland habitat created
1700. # of acres of upland habitat restored/re-established
1701. # of acres of upland habitat rehabilitated/enhanced
acres treated instream 1474. # of acres treated
1403. # of riparian acres treated
1404. # of upland acres treated
1518. # of acres of riparian wetland habitat treated
1520. # of acres of freshwater wetland habitat treated
1521. # of acres of estuarine wetland habitat treated
1690. # of acres of riparian habitat created
1691. # of acres of riparian habitat restored/re-established
1692. # of acres of riparian habitat rehabilitated/enhanced
1693. # of acres of estuarine habitat created
1694. # of acres of estuarine habitat restored/re-established
1695. # of acres of estuarine habitat rehabilitated/enhanced
1696. # of acres of freshwater non-tidal habitat created
1697. # of acres of freshwater non-tidal habitat restored/re-established
1698. # of acres of freshwater non-tidal habitat rehabilitated/enhanced
1699. # of acres of upland habitat created
1700. # of acres of upland habitat restored/re-established
1701. # of acres of upland habitat rehabilitated/enhanced

CBFish Metric Set
acres treated (Required)
Habitat Zone Wetland Zone Habitat Treatment Type Metric ID and Name Required?
Riparian Wetland Creation 1690. # of acres of riparian habitat created Required
Riparian Wetland Restoration/Re-establishment 1691. # of acres of riparian habitat restored/re-established Required
Riparian Wetland Rehabilitation/Enhancement 1692. # of acres of riparian habitat rehabilitated/enhanced Required
Estuarine Wetland Creation 1693. # of acres of estuarine habitat created Required
Estuarine Wetland Restoration/Re-establishment 1694. # of acres of estuarine habitat restored/re-established Required
Estuarine Wetland Rehabilitation/Enhancement 1695. # of acres of estuarine habitat rehabilitated/enhanced Required
Freshwater Non-Tidal Wetland Creation 1696. # of acres of freshwater non-tidal habitat created Required
Freshwater Non-Tidal Wetland Restoration/Re-establishment 1697. # of acres of freshwater non-tidal habitat restored/re-established Required
Freshwater Non-Tidal Wetland Rehabilitation/Enhancement 1698. # of acres of freshwater non-tidal habitat rehabilitated/enhanced Required
Upland Wetland Creation 1699. # of acres of upland habitat created Required
Upland Wetland Restoration/Re-establishment 1700. # of acres of upland habitat restored/re-established Required
Upland Wetland Rehabilitation/Enhancement 1701. # of acres of upland habitat rehabilitated/enhanced Required

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.5 Riparian Habitat Project
        C.5.k.1 Unspecified or other riparian habitat project
            C.5.k.3 Acres of streambank treated with other riparian treatment
1690: # of acres of riparian habitat created
C.0 Salmonid Habitat Restoration and Acquisition
    C.6 Upland Habitat And Sediment Project
        C.6.l.1 Upland wetland improvement
            C.6.l.2 Acres of upland wetland improved
1699: # of acres of upland habitat created
C.0 Salmonid Habitat Restoration and Acquisition
    C.8 Wetland Project
        C.8.e.1 Wetland improvement/restoration
            C.8.e.2 Acres of wetland treated
1403: # of riparian acres treated
1404: # of upland acres treated
1474: # of acres treated
1518: # of acres of riparian wetland habitat treated
1520: # of acres of freshwater wetland habitat treated
1521: # of acres of estuarine wetland habitat treated
1691: # of acres of riparian habitat restored/re-established
1692: # of acres of riparian habitat rehabilitated/enhanced
1697: # of acres of freshwater non-tidal habitat restored/re-established
1698: # of acres of freshwater non-tidal habitat rehabilitated/enhanced
1700: # of acres of upland habitat restored/re-established
1701: # of acres of upland habitat rehabilitated/enhanced
C.0 Salmonid Habitat Restoration and Acquisition
    C.8 Wetland Project
        C.8.f.1 Artificial wetland created
            C.8.f.2 Artificial wetland acres created
1696: # of acres of freshwater non-tidal habitat created
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.c.1 Channel modification
            C.9.c.3 Acres of estuary treated
1694: # of acres of estuarine habitat restored/re-established
1695: # of acres of estuarine habitat rehabilitated/enhanced
C.0 Salmonid Habitat Restoration and Acquisition
    C.9 Estuarine/Nearshore Project
        C.9.q.1 Creation of new estuarine area
            C.9.q.2 Acres of estuary created
1693: # of acres of estuarine habitat created

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1
Location Guidance:
Identify point at approximate center of area to be created or restored, or point at location of installation. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #181 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Virgil Watts III 71
Joe Deherrera (Inactive) 23
Andre L'Heureux (Inactive) 16
Dorothy Welch 13
Sandra Fife (Inactive) 12
Average Work Element Budget: $123,578
Average Duration: 10 months