View and print project details including project summary, purpose, associations to Biological Opinions, and area. To learn more about any of the project properties, hold your mouse cursor over the field label.
Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
To view all expenditures for all fiscal years, click "Project Exp. by FY"
To see more detailed project budget information, please visit the "Project Budget" page
Number | Contractor Name | Title | Status | Total Contracted Amount | Dates |
---|---|---|---|---|---|
456 REL 3 SOW | Concannon, Kathleen A | T/O20593 W/E SERVICES:NEOH MASTER PLAN FOR GRANDE/RONDE/IMHANA | History | $318 | 8/16/1999 - 8/31/2000 |
3118 REL 1 SOW | Nez Perce Tribe | 1988-053-01 REINTRODUCTION/SUPPLEMENTATION OF COHO SALMON | Terminated | $24,124 | 9/20/2000 - 4/30/2001 |
58 REL 4 SOW | Concannon, Kathleen A | PROJECT COORDINATION SUPPORT SERVICES; NORTHEAST OREGON HATCHERY | Closed | $36,900 | 10/1/2000 - 7/6/2003 |
422 REL 15 SOW | MWH Global, Inc. | 1988-053-01 GRAND RONDE SPRING CHINOOK SUPP. - PREDESIGN | Closed | $1,000,664 | 10/1/2000 - 12/31/2003 |
3119 REL 1 SOW | Nez Perce Tribe | 1988-05301 NE OREGON HATCHERY MASTER PLAN | Terminated | $66,973 | 10/1/2000 - 4/30/2001 |
4850 SOW | Nez Perce Tribe | 1988-53-1 GRANDE RONDE/IMNAHA STEELHEAD MASTER PLAN | History | $231,690 | 1/1/2001 - 3/31/2005 |
4034 SOW | Nez Perce Tribe | 1988-053-01 GRANDE RONDE/IMNAHA ENDEMIC SPRING CHINOOK SUPPL PROG | Closed | $1,781,444 | 3/20/2001 - 12/31/2005 |
422 REL 19 SOW | MWH Global, Inc. | 1988-053-01 GRANDE RONDE STEELHEAD | History | $36,000 | 6/15/2001 - 4/30/2003 |
58 REL 11 SOW | Concannon, Kathleen A | 1988-053-01 WRITER/EDITOR SUPPORT FOR COHO MASTER PLANNING | History | $0 | 9/25/2001 - 7/6/2002 |
BPA-010887 | Bonneville Power Administration | FY02 capital fees | Active | $128,752 | 10/1/2001 - 9/30/2002 |
4042 SOW | Nez Perce Tribe | 1988-053-01REINTRODUCTION/SUPPLEMENTATION OF COHO SALMON | History | $16,317 | 11/30/2001 - 3/31/2005 |
589 REL 1 SOW | Environmental Science Associates | 198805301 NEPA GRANDE RONDE- IMNAHA EIS | Closed | $424,691 | 5/13/2002 - 9/30/2004 |
BPA-010884 | Bonneville Power Administration | FY03 land rights | Active | $352,568 | 10/1/2002 - 9/30/2003 |
BPA-010885 | Bonneville Power Administration | FY04 land fees | Active | $45,208 | 10/1/2003 - 9/30/2004 |
429 REL 24 SOW | Fishpro, Inc. | PI 198805301 NORTHEAST OR HATCHERY - DESIGN ASSISTANCE | Closed | $343,287 | 10/17/2003 - 12/31/2004 |
58 REL 27 SOW | Concannon, Kathleen A | NE OR HATCHERY PROJ - ROD | Closed | $3,039 | 1/28/2005 - 3/31/2005 |
BPA-010886 | Bonneville Power Administration | FY06 land fees | Active | $9,398 | 10/1/2005 - 9/30/2006 |
23387 REL 1 SOW | Harbor Consulting Engineers | 1988-053-01 NEOH - VALUE ENGINEERING STUDY | Closed | $49,498 | 10/17/2005 - 12/31/2005 |
26903 SOW | Nez Perce Tribe | 1988 053 01 GRANDE RONDE SPRING CHINOOK STEP 3 SUPPORT | Closed | $411,818 | 1/1/2006 - 12/31/2006 |
58 REL 33 SOW | Concannon, Kathleen A | NEOH ROD | History | $3,130 | 5/16/2006 - 7/6/2006 |
BPA-005566 | Bonneville Power Administration | Bank Fee-permits | Active | $3,186 | 10/1/2006 - 9/30/2007 |
30653 SOW | Nez Perce Tribe | 1988 053 01 GRANDE RONDE SPRING CHINOOK STEP 3 SUPPORT | Closed | $391,226 | 1/1/2007 - 12/31/2007 |
BPA-005567 | Bonneville Power Administration | Bank Fee-permits | Active | $1,888 | 10/1/2007 - 9/30/2008 |
36154 SOW | Nez Perce Tribe | 198805301 CAP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $379,599 | 1/1/2008 - 12/31/2008 |
40387 SOW | Nez Perce Tribe | 198805301 CAP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $362,768 | 1/1/2009 - 12/31/2009 |
BPA-005742 | Bonneville Power Administration | Permits/Fees | Active | $2,733 | 10/1/2009 - 9/30/2010 |
45339 SOW | Nez Perce Tribe | 1988-053-01 CAP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $287,830 | 1/1/2010 - 12/31/2010 |
49286 SOW | Nez Perce Tribe | 1988-053-01 CAP LOSTINE WEIR FINANCIAL ASSISTANCE | Closed | $14,544 | 8/16/2010 - 9/30/2010 |
BPA-005980 | Bonneville Power Administration | Permits/Fees | Active | $2,120 | 10/1/2010 - 9/30/2011 |
50527 SOW | Nez Perce Tribe | 1988-053-01 CAP GRANDE RONDE SPRING CHINOOK STEP 3 SUPPORT | Closed | $388,421 | 1/1/2011 - 12/31/2011 |
BPA-007240 | Bonneville Power Administration | Permits/Fees | Active | $820 | 10/1/2011 - 9/30/2012 |
Number | Contractor Name | Title | Status | Total Contracted Amount | Dates |
---|---|---|---|---|---|
BPA-010888 | Bonneville Power Administration | FY01 expense fees | Active | $550 | 10/1/2000 - 9/30/2001 |
BPA-010881 | Bonneville Power Administration | FY03 fees/permits | Active | $5,513 | 10/1/2002 - 9/30/2003 |
22098 SOW | Fishpro, Inc. | 1988-053-01 NORTHEAST OREGON HATCHERY PROJECT | History | $3,739,229 | 3/23/2005 - 3/31/2013 |
44926 SOW | Nez Perce Tribe | 198805301 EXP NEOH HGMP REVIEW & EVALUATION | Closed | $100,000 | 1/1/2010 - 12/31/2011 |
55115 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $184,571 | 1/1/2012 - 12/31/2012 |
BPA-010879 | Bonneville Power Administration | FY13 Permit/fees | Active | $1,532 | 10/1/2012 - 9/30/2013 |
60241 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $209,838 | 1/1/2013 - 12/31/2013 |
60916 SOW | HDR Engineering, Inc. | 1988-053-01 EXP NORTHEAST OREGON HATCHERY PROJECT | Closed | $3,418 | 4/1/2013 - 3/31/2014 |
BPA-008529 | Bonneville Power Administration | Land Lease | Active | $6,571 | 10/1/2013 - 9/30/2014 |
63466 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $222,152 | 1/1/2014 - 12/31/2014 |
64664 SOW | HDR Engineering, Inc. | 1988-053-01 EXP NORTHEAST OREGON HATCHERY PROJECT | Closed | $1,225 | 4/1/2014 - 3/31/2015 |
BPA-008671 | Bonneville Power Administration | FY15 Land Lease/fees | Active | $5,729 | 10/1/2014 - 9/30/2015 |
67521 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $211,051 | 1/1/2015 - 12/31/2015 |
68371 SOW | HDR Engineering, Inc. | 1988-053-01 EXP NORTHEAST OREGON HATCHERY PROJECT | Closed | $9,048 | 4/1/2015 - 3/31/2016 |
BPA-009142 | Bonneville Power Administration | FY16 land lease/fees | Active | $5,899 | 10/1/2015 - 9/30/2016 |
71216 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $202,644 | 1/1/2016 - 12/31/2016 |
72143 SOW | HDR Engineering, Inc. | 1988-053-01 EXP NE OR HATCHERY MASTER PLAN | Closed | $9,932 | 4/1/2016 - 3/31/2017 |
BPA-009714 | Bonneville Power Administration | FY17 TBL Task Order | Active | $10,986 | 10/1/2016 - 9/30/2017 |
75328 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $220,256 | 1/1/2017 - 12/31/2017 |
77171 SOW | Oregon Department of Environmental Quality | LSTN-FF-1NPD | Closed | $980 | 10/1/2017 - 12/31/2020 |
BPA-010429 | Bonneville Power Administration | FY18 Land Actions | Active | $5,980 | 10/1/2017 - 9/30/2018 |
74017 REL 7 SOW | Nez Perce Tribe | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Closed | $217,599 | 1/1/2018 - 6/30/2019 |
BPA-010595 | Bonneville Power Administration | FY19 Land Aquisitions/other | Active | $0 | 10/1/2018 - 9/30/2019 |
BPA-012851 | Bonneville Power Administration | FY21 Land Lease | Active | $5,000 | 10/1/2020 - 9/30/2021 |
Annual Progress Reports | |
---|---|
Expected (since FY2004): | 19 |
Completed: | 18 |
On time: | 18 |
Status Reports | |
---|---|
Completed: | 107 |
On time: | 73 |
Avg Days Late: | 1 |
Count of Contract Deliverables | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Earliest Contract | Subsequent Contracts | Title | Contractor | Earliest Start | Latest End | Latest Status | Accepted Reports | Complete | Green | Yellow | Red | Total | % Green and Complete | Canceled |
BPA-10888 | FY01 expense fees | Bonneville Power Administration | 10/01/2000 | 09/30/2001 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
4034 | 26903, 30653, 36154, 40387, 45339, 50527, 55115, 60241, 63466, 67521, 71216, 75328, 74017 REL 7 | 1988-053-01 EXP GRANDE RONDE SPRING CHINOOK STEP 2 SUPPORT | Nez Perce Tribe | 03/20/2001 | 06/30/2019 | Closed | 56 | 82 | 0 | 0 | 16 | 98 | 83.67% | 1 |
BPA-10887 | FY02 capital fees | Bonneville Power Administration | 10/01/2001 | 09/30/2002 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10881 | FY03 fees/permits | Bonneville Power Administration | 10/01/2002 | 09/30/2003 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10884 | FY03 land rights | Bonneville Power Administration | 10/01/2002 | 09/30/2003 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10885 | FY04 land fees | Bonneville Power Administration | 10/01/2003 | 09/30/2004 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
429 REL 24 | 22098, 60916, 64664, 68371, 72143 | 1988-053-01 EXP NE OR HATCHERY MASTER PLAN | HDR Engineering, Inc. | 10/17/2003 | 03/31/2017 | Closed | 43 | 21 | 0 | 0 | 3 | 24 | 87.50% | 0 |
BPA-10886 | FY06 land fees | Bonneville Power Administration | 10/01/2005 | 09/30/2006 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-5566 | Bank Fee-permits | Bonneville Power Administration | 10/01/2006 | 09/30/2007 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-5567 | Bank Fee-permits | Bonneville Power Administration | 10/01/2007 | 09/30/2008 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-5742 | Permits/Fees | Bonneville Power Administration | 10/01/2009 | 09/30/2010 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
44926 | 198805301 EXP NEOH HGMP REVIEW & EVALUATION | Nez Perce Tribe | 01/01/2010 | 12/31/2011 | Closed | 8 | 3 | 0 | 0 | 0 | 3 | 100.00% | 0 | |
BPA-5980 | Permits/Fees | Bonneville Power Administration | 10/01/2010 | 09/30/2011 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-7240 | Permits/Fees | Bonneville Power Administration | 10/01/2011 | 09/30/2012 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10879 | FY13 Permit/fees | Bonneville Power Administration | 10/01/2012 | 09/30/2013 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-8529 | Land Lease | Bonneville Power Administration | 10/01/2013 | 09/30/2014 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-8671 | FY15 Land Lease/fees | Bonneville Power Administration | 10/01/2014 | 09/30/2015 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-9142 | FY16 land lease/fees | Bonneville Power Administration | 10/01/2015 | 09/30/2016 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-9714 | FY17 TBL Task Order | Bonneville Power Administration | 10/01/2016 | 09/30/2017 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10429 | FY18 Land Actions | Bonneville Power Administration | 10/01/2017 | 09/30/2018 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-10595 | FY19 Land Aquisitions/other | Bonneville Power Administration | 10/01/2018 | 09/30/2019 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
BPA-12851 | FY21 Land Lease | Bonneville Power Administration | 10/01/2020 | 09/30/2021 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Project Totals | 107 | 106 | 0 | 0 | 19 | 125 | 84.80% | 1 |
Assessment Number: | 1988-053-01-NPCC-20110105 |
---|---|
Project: | 1988-053-01 - Northeast Oregon Hatchery Master Plan |
Review: | RME / AP Category Review |
Proposal: | RMECAT-1988-053-01 |
Proposal State: | Pending BPA Response |
Approved Date: | 6/10/2011 |
Recommendation: | Under Review |
Comments: | Implement through outcome of Step Review process based on May 9, 2006 Council decision. Implementation subject to regional hatchery effects evaluation process described in programmatic recommendation #4. |
Publish Date: 09/08/2011
BPA Response: Agree
BPA agrees to implement through outcome of Step Review process. |
|
Conditions: | |
Council Condition #1 Programmatic Issue: RMECAT #4 Hatchery Effectiveness—. | |
BPA Response to Council Condition #1:
<no comment>
|
Assessment Number: | 1988-053-01-ISRP-20101015 |
---|---|
Project: | 1988-053-01 - Northeast Oregon Hatchery Master Plan |
Review: | RME / AP Category Review |
Proposal Number: | RMECAT-1988-053-01 |
Completed Date: | 12/17/2010 |
Final Round ISRP Date: | 12/17/2010 |
Final Round ISRP Rating: | Not Applicable |
Final Round ISRP Comment: | |
Not applicable. This proposal relates only to the construction of the hatchery facilities. There is no component of the proposal that clearly indicates a study design or lays out the monitoring and evaluation program. This proposal did not provide sufficient details for an in depth review. However, the ISRP’s previous Step Review applies here (ISRP 2004-10). The project has not been implemented since the ISRP’s and Council’s recommendation under the Step Review Process.
|
|
First Round ISRP Date: | 10/18/2010 |
First Round ISRP Rating: | Not Applicable |
First Round ISRP Comment: | |
Not applicable. This proposal relates only to the construction of the hatchery facilities. There is no component of the proposal that clearly indicates a study design or lays out the monitoring and evaluation program. This proposal did not provide sufficient details for an in depth review. However, the ISRP’s previous Step Review applies here (ISRP 2004-10). The project has not been implemented since the ISRP’s and Council’s recommendation under the Step Review Process. |
|
Documentation Links: |
|
Assessment Number: | 1988-053-01-BIOP-20101105 |
---|---|
Project Number: | 1988-053-01 |
Review: | RME / AP Category Review |
Proposal Number: | RMECAT-1988-053-01 |
Completed Date: | None |
2008 FCRPS BiOp Workgroup Rating: | Supports 2008 FCRPS BiOp |
Comments: |
BiOp Workgroup Comments: No BiOp Workgroup Comments The BiOp RM&E Workgroups made the following determinations regarding the proposal's ability or need to support BiOp Research, Monitoring and Evaluation (RME) RPAs. If you have questions regarding these RPA association conclusions, please contact your BPA COTR and they will help clarify, or they will arrange further discussion with the appropriate RM&E Workgroup Leads. BiOp RPA associations for the proposed work are: ( ) All Questionable RPA Associations ( ) and All Deleted RPA Associations (64.2) |
Proponent Response: | |
|
Assessment Number: | 1988-053-01-NPCC-20090924 |
---|---|
Project: | 1988-053-01 - Northeast Oregon Hatchery Master Plan |
Review: | FY07-09 Solicitation Review |
Approved Date: | 10/23/2006 |
Recommendation: | Fund |
Comments: | See discussion of supplementation m&e in decision memo. On May 9, 2006 the Council approved the final design and construction (Step 3) costs associated with the Northeast Oregon Hatchery (NEOH) currently in discussion between BPA and NOAA Fisheries on crediting. |
Assessment Number: | 1988-053-01-ISRP-20060831 |
---|---|
Project: | 1988-053-01 - Northeast Oregon Hatchery Master Plan |
Review: | FY07-09 Solicitation Review |
Completed Date: | 8/31/2006 |
Final Round ISRP Date: | None |
Final Round ISRP Rating: | Meets Scientific Review Criteria - In Part |
Final Round ISRP Comment: | |
Response for NEOH Project Group including 198805301, 20071320, 199800702, 199800703, and 199800704.
Recommendation: 198805301 - Fundable in part 200713200 - Fundable 199800702 - Fundable (Qualified) 199800703 - Fundable (Qualified) 199800704 - Fundable (Qualified) The ISRP has reviewed this group of projects (NEOH) within the context of a Three-Step Review as well as within this round of project reviews. The Three-Step Review for the Master Plan behind NEOH has been completed. The ISRP gave a favorable Three-Step Review based on the scientific merit of a robust and rigorous monitoring and evaluation approach to the program while recognizing there remains a basic uncertainty as to whether the supplementation can or will contribute to recovery of naturally sustaining salmon (including spring/summer Chinook in the Grande Ronde). The partial funding recommendation here for Proposal 198805301 stems from the need to amass vital data and information about supplementation before new construction of production facilities. As such, a key precursor to beginning construction on new facilities is the completion of the supplementation experiment presented in the companion M&E project (200713200 - NEOH Monitoring & Evaluation Implementation), which is supported scientifically and is recommended for funding. This project is the critical M&E component of the NEOH set of projects. The sponsors of Project 199805301sufficiently addressed issues identified by ISRP during review and provided additional clarity to the need, role, and priorities for monitoring and evaluation for NEOH. In terms of prioritizing activities to meet data needs, the sponsors articulated those that are essential, those that are recommended, and others that are of a lower priority. As an experiment, a robustly monitored supplementation program designed within NEOH should provide data answering lingering uncertainties and controversies surrounding its capacity and role as a potential recovery tool. Therefore, the fundable part of Project 198805031 is that associated with updating the weirs, which is critical to a robust and rigorous monitoring for the experiment. Construction of the acclimation and production facilities should be limited in scale and scope to that which is necessary to meet the goal(s) for testing the efficacy of supplementation. Clear and unequivocal demonstration of supplementation as an avenue to recovery of naturally sustained Chinook ought to be a condition before fully proceeding with the expanded program, including construction. Moreover, the role and goals of supplementation, which will have a specific end-point versus production as an ongoing mitigation activity remain blurred and need to be clearly articulated. Project 199800702 is Fundable (Qualified): The ISRP requested a decision tree, which would describe a path of adaptive management. For each of the project's 8 management objectives, the sponsors responded with a list of hypotheses or criteria, which they term "management assumptions." The sponsors seem to regard the resultant outline a "decision framework" for guiding the decision process of NEOH adaptive management. The array is based on the NEOH M&E Conceptual Plan (Hesse and Harbeck 2000). While this approach is reasonable, in addition to this framework of assumptions, a decision tree would require statements of reasonably foreseeable alternative adjustments of management (including project termination) that would depend on whether the assumptions are borne out. Project 199800703 is Fundable (Qualified): The ISRP requested a decision tree detailing criteria for expected termination or continuation based on monitoring data - whether positive or negative. The response clarified planned activities if the results are positive, including termination of the captive broodstock program, etc. No information was provided on the criteria for termination if the program fails to show adequate, sustained results. The sponsors indicate that such decision would be made at an administrative level above the project level and do not say how those decisions would be made. This constitutes a lack of transparency in the plan. For reviewers to be able to evaluate the plan, the proposal should contain the criteria and anticipated alternatives that this higher level of decision-making will use. Ultimately, this sizeable project has continued for several years, but the data presented on returns suggest only modest success to date, especially with regard to natural production. As captive brood fish have returned in higher numbers, natural fish have responded much less dramatically, and dropped in 2005. Even in view of the fact that short-term population fluctuations due to environmental variation may make longer-term observation necessary, the appropriateness of undertaking a decision process at this point should be discussed. Also, some of the data presented in the response are unclear. For example, some of the abbreviated column headings in Table 3a are not explained, so the material beneath them is difficult to assign meaning or context. Project 199800704 is Fundable (Qualified): The ISRP requested a response showing a decision tree detailing criteria for termination based on results, whether positive or negative. The response was through, its content describing a decision-tree process that recognized decision-making at several administrative levels. The sponsors' presentation of the three manager-level criteria was a good effort and very satisfactory. Presentation of results (original narrative) is adequate. It is too early in the production schedule to get data on returns, although survival rates of earlier life history stages could have been reported. Data from monitoring of fish health in the hatchery are presented. Redd counts for natural spawning are shown. The ISRP makes the Fundable (Qualified) recommendation because scientific justification for the project depends on the funding of the M&E proposal 200713200. Finally, the NEOH is presented as critical to recovery of spring/summer Chinook and, therefore, warrants rigorous evaluation of progress and meeting of objectives. The program will benefit from comprehensive programmatic review at key milestones (with site visits, presentation of preliminary data and analysis, lessons learned, etc.). ISRP comments are also provided for another NEOH proposal for Three-Step Master Planning for an NEOH Walla Walla Hatchery to produce spring Chinook salmon for release in the Walla Walla River Basin, see 200003800. |
|
Documentation Links: |
|
Assessment Number: | 1988-053-01-INLIEU-20090521 |
---|---|
Project Number: | 1988-053-01 |
Review: | FY07-09 Solicitation Review |
Completed Date: | 10/6/2006 |
In Lieu Rating: | No Problems Exist |
Cost Share Rating: | None |
Comment: | NEOH project construction, operation. |
Assessment Number: | 1988-053-01-CAPITAL-20090618 |
---|---|
Project Number: | 1988-053-01 |
Review: | FY07-09 Solicitation Review |
Completed Date: | 9/14/2007 |
Capital Rating: | Qualifies for Capital Funding |
Capital Asset Category: | Hatchery |
Comment: | During FY2006, a review of all capital funded projects was performed to ensure compliance with the BPA policy. This review identified the Northeast Oregon Hatchery #1988-053-01 as being capitalized, but had not met the BPA capital policy while it was in the preliminary construction stage. However, it was decided in FY2006 by the Financial Operations Manager with the concurrence of the Chief Financial Officer to continue to capitalize this project and not make an impairment adjustment because there was a lack of clarity to define preliminary work, it has been ongoing since 1988, the Council granted construction authorization in June 2006, FB CRAC rate setting implications and for the following reasons: All of the work is required to construct the hatchery to an operational state; the project cost is included in the rate case to recover the costs over time; the construction exceeds the $1 million threshold; there is a future benefit defined by fulfilling a legal obligation of the FCRPS. Capital funding approval submitted by BPA COTR. The COTR, COTR's Manager and BPA Accountant certified that the request meets the BPA F&W capital policy and is approved for capital funding (if capital funds are available). |
Name | Role | Organization |
---|---|---|
Rebecca Johnson | Supervisor | Nez Perce Tribe |
Rick Zollman | Technical Contact | Nez Perce Tribe |
James Harbeck | Technical Contact | Nez Perce Tribe |
Bruce McLeod | Project Lead | Nez Perce Tribe |
Becky Holloway (Inactive) | Technical Contact | HDR Engineering, Inc. |
Tish Whitman | Technical Contact | Nez Perce Tribe |
Katey Grange | Env. Compliance Lead | Bonneville Power Administration |
Jay Hesse | Interested Party | Nez Perce Tribe |
Shane Vatland | Project Lead | Nez Perce Tribe |
Anthony Broncheau | Project Lead | Nez Perce Tribe |
Dorothy Welch | Supervisor | Bonneville Power Administration |
Eric Andersen (Inactive) | Project Manager | Bonneville Power Administration |