View and print project details including project summary, purpose, associations to Biological Opinions, and area. To learn more about any of the project properties, hold your mouse cursor over the field label.
Province | Subbasin | % |
---|---|---|
Intermountain | Pend Oreille | 100.00% |
Description: Page: 7 Figure 1: Map showing the IDFG wildlife management areas, subbasins, and Idaho counties in the Albeni Falls Wildlife Mitigation Project area. Project(s): 1992-061-03 Document: P121852 Dimensions: 1273 x 1648 Description: Page: 9 Figure 2: Locations of all Pend Oreille WMA properties. Individual parcels under the Albeni Falls Wildlife Mitigation Project are shown in Appendix A. A total of 12 properties totaling about 1,793.4 acres (shown in bright green) are designated as wildlife mitigation properties under the Project. Also included as a wildlife mitigation property is the 12-acre Pearl Island donation (aerial photograph taken in 2004). Project(s): 1992-061-03 Document: P121852 Dimensions: 1643 x 1269 Description: Page: 10 Figure 3: Map showing the IDFG Cocolalla Lake habitat segment of the Pend Oreille WMA. Project(s): 1992-061-03 Document: P121852 Dimensions: 1270 x 1646 Description: Page: 12 Figure 4: Map showing the IDFG White Island Habitat Segment of the Pend Oreille WMA. Project(s): 1992-061-03 Document: P121852 Dimensions: 848 x 1097 Description: Page: 13 Figure 5: Aerial photograph showing the 203-acre Tall Pines property (outlined in yellow). The shaded green area is the 320-acre conservation easement held by IDFG. Project(s): 1992-061-03 Document: P121852 Dimensions: 849 x 1099 Description: Page: 16 Figure 8: Albeni Falls wetland at low water levels in July 2010. Courtesy of IDFG. Project(s): 1992-061-03 Document: P121852 Dimensions: 1417 x 849 Description: Page: 26 Figure 18: The 62-acre Lower St. Joe project (subject property) and the Avista ownership fronting the St. Joe River. Project(s): 1992-061-03 Document: P121852 Dimensions: 712 x 786 Description: Page: 29 Figure 21: Showing the distribution of habitat cover types on the restoration project site (FW=forested wetland; SSW=scrub-shrub wetlands; HW=herbaceous wetland). Project(s): 1992-061-03 Document: P121852 Dimensions: 822 x 635 Description: Page: 39 Figure 26: Reference Area for cover type No. 21 – Lakes, Ponds, Reservoirs, and Rivers. Project(s): 1992-061-03 Document: P121852 Dimensions: 1052 x 816 Description: Page: 39 Figure 27: Reference Area for cover type No 22. – Herbaceous Wetlands. Project(s): 1992-061-03 Document: P121852 Dimensions: 1055 x 810 Description: Page: 40 Figure 28: Reference Area for cover type No. 24 –Montane Coniferous Wetlands. Project(s): 1992-061-03 Document: P121852 Dimensions: 1054 x 816 Description: Page: 49 Figure 32a: Bank pin site CFRD5: photograph of the site was taken on November 16, 2009, the day the pins were inserted. Project(s): 1992-061-03 Document: P121852 Dimensions: 1127 x 845 Description: Page: 49 Figure 32b: Bank pin site CFRD5: photograph of the site was taken on January 28, 2010, showing that the bank pins are gone and the only the t-post marking the location remains. Project(s): 1992-061-03 Document: P121852 Dimensions: 1096 x 822 Description: Page: 50 Figure 33a: Bank pin site CFRD3 looking toward the west taken on November 17, 2010. An engineer is collecting information on the remaining pines. Project(s): 1992-061-03 Document: P121852 Dimensions: 793 x 594 Description: Page: 50 Figure 33b: Bank pin site CFRD3 looking toward the east. This photograph shows wildlife habitat cover being lost along due to banks slumping into the river. Project(s): 1992-061-03 Document: P121852 Dimensions: 793 x 594 Description: Page: 52 Figure 34: Aerial photograph (2009) showing the proposed acquisition adjacent to the Rapid Lightning Creek Habitat Segment of the Pend Oreille WMA. The access road to the WMA is along the eastern boarder of the subject property. Project(s): 1992-061-03 Document: P121852 Dimensions: 846 x 1095 Description: Page: 53 Figure 35: Aerial photograph showing the Robinson Creek Habitat Segment in relation to the ITD and Hayman ownerships. Project(s): 1992-061-03 Document: P121852 Dimensions: 843 x 1095 Description: Page: 54 Figure 36: Aerial photograph showing the vicinity of the Robinson Creek Habitat Segment in relation to the Coeur d’Alene River WMA and the Schlepp conservation easement. Project(s): 1992-061-03 Document: P121852 Dimensions: 849 x 1097 Description: Page: 55 Figure 37: Proposed acquisition of a permanent access easement to the Pack River delta restoration project. Project(s): 1992-061-03 Document: P121852 Dimensions: 993 x 645 Description: Page: 57 Figure 38a: Detailed map of Pack River Delta Restoration Project. Land, pond, and shallow areas were created during the restoration project. Project(s): 1992-061-03 Document: P121852 Dimensions: 715 x 830 Description: Page: 57 Figure 38b: Island 8 with geotube extending northwest from the Island and a 25m x25m-monitoring survey grid overlay. Project(s): 1992-061-03 Document: P121852 Dimensions: 547 x 399 Description: Page: 57 Figure 38c: Aerial photograph of the project area after the completion of construction and at full summer pool of 2,064 ft taken in July 2009. Project(s): 1992-061-03 Document: P121852 Dimensions: 1356 x 1636 Description: Page: 64 Figure 42: Willows growth in a rock breakwater on Island 8 during summer full pool level (Photograph dated July 29, 2010). Project(s): 1992-061-03 Document: P121852 Dimensions: 792 x 594 |
To view all expenditures for all fiscal years, click "Project Exp. by FY"
To see more detailed project budget information, please visit the "Project Budget" page
Acct FY | Acct Type | Amount | Fund | Budget Decision | Date |
---|---|---|---|---|---|
FY2024 | Capital | $98,641 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2024 | Capital | $120,691 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM) 5/27/2022 | 05/31/2022 |
FY2024 | Capital | $396,669 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM) 5/27/2022 | 05/31/2022 |
FY2024 | Capital | $167,999 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM) 5/27/2022 | 05/31/2022 |
FY2024 | Capital | $571,817 | To: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM 1992-061-03) 3/22/2023 | 03/22/2023 |
FY2024 | Capital | $212,183 | To: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM 1992-061-03) 3/22/2023 | 03/22/2023 |
FY2024 | Expense | $1,909,610 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2024 | Expense | $250,938 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM-IDFG MOA - Inflation adjustments | 08/23/2018 |
FY2024 | Expense | $1,830,860 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Agreement Transfers (NIWM) 5/27/2022 | 05/31/2022 |
FY2024 | Expense | $75,276 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM MOA Budget transfers (IDFG) 10/27/2022 | 10/27/2022 |
FY2024 | Expense | $524 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM MOA Budget transfers (IDFG) 10/27/2022 | 10/27/2022 |
FY2024 | Expense | $256,208 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM MOA Budget transfers (IDFG) 10/27/2022 | 10/27/2022 |
FY2024 | Expense | $176,949 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Agreement Transfers (NIWM) 7/19/2023 | 07/19/2023 |
FY2025 | Capital | $0 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2025 | Expense | $275,000 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2025 | Expense | $43,916 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM-IDFG MOA - Inflation adjustments | 08/23/2018 |
FY2025 | Expense | $73,043 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Accord Transfers (IDFG) 9/10/24 | 09/10/2024 |
FY2026 | Capital | $0 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2026 | Capital | $212,183 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Stewardship | Agreement Transfers (NIWM 1992-061-03) 3/22/2023 | 03/22/2023 |
FY2026 | Expense | $275,000 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Fish Accord - Northern Idaho Wildlife Mitigation-IDFG | 08/22/2018 |
FY2026 | Expense | $51,889 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | NIWM-IDFG MOA - Inflation adjustments | 08/23/2018 |
FY2026 | Expense | $391,571 | From: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Agreement Transfers (NIWM) 5/27/2022 | 05/31/2022 |
FY2026 | Expense | $176,949 | To: Fish Accord - Northern Idaho Wildlife Mitigation (IDFG) - Mitigation | Agreement Transfers (NIWM) 7/19/2023 | 07/19/2023 |
Number | Contractor Name | Title | Status | Total Contracted Amount | Dates |
---|---|---|---|---|---|
BPA-010639 | Bonneville Power Administration | FY19 Stewardship Payments | Active | $7,369,712 | 10/1/2017 - 9/30/2018 |
89403 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Closed | $2,466,214 | 1/1/2022 - 9/30/2022 |
BPA-013443 | Bonneville Power Administration | FY23 Stewardship | Active | $571,817 | 10/1/2022 - 9/30/2023 |
Number | Contractor Name | Title | Status | Total Contracted Amount | Dates |
---|---|---|---|---|---|
CR-343610 SOW | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Pending | $0 | ||
36835 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG BOUNDARY CREEK WMA ALBENI FALLS | Closed | $244,260 | 3/1/2008 - 2/28/2009 |
38284 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDF&G PEND OREILLE WMA ALBENI FALLS | Closed | $329,284 | 7/1/2008 - 6/30/2009 |
43139 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDF&G ADMIN CONTRACT ALBENI FALLS | Closed | $238,574 | 3/1/2009 - 6/30/2010 |
43681 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ALBENI FALLS O&M & IMPLEMENTATION | Closed | $214,640 | 7/1/2009 - 6/30/2010 |
48187 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ALBENI FALLS ADMIN & IMP WL | Closed | $249,838 | 7/1/2010 - 6/30/2011 |
48305 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG WMA O&M ALBENI FALLS WL | Closed | $227,773 | 7/1/2010 - 6/30/2011 |
53816 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS ADMIN WL IDF&G | Closed | $208,710 | 7/1/2011 - 6/30/2012 |
53817 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS O&M WL IDF&G | Closed | $420,811 | 7/1/2011 - 6/30/2012 |
57962 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WL IDF&G ADMIN | Closed | $395,990 | 7/1/2012 - 6/30/2013 |
57977 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WL IDF&G O&M | Closed | $490,587 | 7/1/2012 - 6/30/2013 |
43044 REL 5 SOW | CH2M-Hill, Inc. | CLARK FORK RIVER DELTA RESTORATION PROJECT | Closed | $199,415 | 6/7/2013 - 7/1/2014 |
62561 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WL IDF&G ADMIN | Closed | $607,337 | 7/1/2013 - 6/30/2014 |
62496 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WL IDF&G O&M | Closed | $429,820 | 7/1/2013 - 6/30/2014 |
65558 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP O&M ALBENI FALLS WL IDF&G | Closed | $403,946 | 7/1/2014 - 6/30/2015 |
66672 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ADMIN ALBENI FALLS WL IDF&G | Closed | $3,864,603 | 7/1/2014 - 6/30/2015 |
69898 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS O&M WL IDF&G | Closed | $352,382 | 7/1/2015 - 6/30/2016 |
69938 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS ADMIN IDFG | Closed | $503,302 | 7/1/2015 - 6/30/2016 |
73192 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ADMIN ALBENI FALLS WILDLIFE MITIGATION- IDFG | Closed | $239,919 | 7/1/2016 - 6/30/2017 |
73231 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ALBENI FALLS O&M WILDLIFE MITIGATION | Closed | $356,349 | 7/1/2016 - 6/30/2017 |
76685 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ADMIN ALBENI FALLS WILDLIFE MITIGATION - IDFG | Closed | $234,002 | 7/1/2017 - 9/30/2018 |
76881 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP O&M ALBENI FALLS WILDLIFE MITIGATION - IDFG | Closed | $364,117 | 7/1/2017 - 6/30/2018 |
79446 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ALBENI FALLS WILDLIFE O&M | Closed | $135,008 | 7/1/2018 - 6/30/2019 |
80586 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ALBENI FALLS WILDLIFE ADMIN | Closed | $259,014 | 10/1/2018 - 9/30/2019 |
83815 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP IDFG ADMIN ALBENI FALLS | Closed | $4,285,637 | 10/1/2019 - 9/30/2020 |
86316 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Closed | $484,036 | 10/1/2020 - 11/30/2021 |
89134 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Closed | $3,007,722 | 11/1/2021 - 9/30/2022 |
84045 REL 4 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Issued | $382,402 | 10/1/2022 - 9/30/2023 |
84045 REL 18 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Issued | $4,500,365 | 10/1/2023 - 9/30/2024 |
84045 REL 32 SOW | Idaho Department of Fish and Game (IDFG) | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Issued | $391,959 | 10/1/2024 - 9/30/2025 |
Annual Progress Reports | |
---|---|
Expected (since FY2004): | 28 |
Completed: | 25 |
On time: | 25 |
Status Reports | |
---|---|
Completed: | 112 |
On time: | 82 |
Avg Days Late: | 8 |
Count of Contract Deliverables | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Earliest Contract | Subsequent Contracts | Title | Contractor | Earliest Start | Latest End | Latest Status | Accepted Reports | Complete | Green | Yellow | Red | Total | % Green and Complete | Canceled |
BPA-10639 | FY19 Stewardship Payments | Bonneville Power Administration | 10/01/2017 | 09/30/2018 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
89403 | 84045 REL 4, 84045 REL 18, 84045 REL 32 | 1992-061-03 EXP ALBENI FALLS WILDLIFE MITIGATION - IDFG | Idaho Department of Fish and Game (IDFG) | 01/01/2022 | 09/30/2025 | Issued | 11 | 22 | 0 | 0 | 0 | 22 | 100.00% | 0 |
BPA-13443 | FY23 Stewardship | Bonneville Power Administration | 10/01/2022 | 09/30/2023 | Active | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Project Totals | 11 | 22 | 0 | 0 | 0 | 22 | 100.00% | 0 |
Assessment Number: | 1992-061-03-NPCC-20210312 |
---|---|
Project: | 1992-061-03 - Albeni Falls Wildlife Mitigation-Idaho Department of Fish and Game (IDFG) |
Review: | 2017 Wildlife Category Review |
Approved Date: | 10/13/2017 |
Recommendation: | Implement |
Comments: |
Recommendation: Sponsor to address ISRP qualifications in the follow-up ISRP review (Aug 31, 2017) prior to the next review, and per programmatic issue recommendations in this this Decision Document (Part 1). [Background: See https://www.nwcouncil.org/fish-and-wildlife/project-reviews-and-recommendations/2017-wildlife-project-review] |
Assessment Number: | 1992-061-03-ISRP-20201118 |
---|---|
Project: | 1992-061-03 - Albeni Falls Wildlife Mitigation-Idaho Department of Fish and Game (IDFG) |
Review: | 2017 Wildlife Category Review |
Completed Date: | 11/18/2020 |
Final Round ISRP Date: | 6/28/2017 |
Final Round ISRP Rating: | Does Not Meet Scientific Review Criteria |
Final Round ISRP Comment: | |
The proponents (IDFG) provided answers to the ISRP’s questions demonstrating some positive attributes, but overall the project does not meet scientific review criteria. Positive attributes include collaborating with the tribes and with UWMEP so that data collections are compatible. LiDAR data will be used to evaluate the stability of bank restoration work and to guide future efforts to stabilize shorelines in relation to Albeni Falls Dam operations. The proponents stated that mitigation parcels have been incorporated into the State of Idaho’s Wildlife Management Areas (WMAs) and management plans exist for individual WMAs, but the plans are for the WMA as a whole and not specific to mitigation parcels within a WMA. The proponents stated in their response that no individual parcel plans or objectives, either for mitigation or nonmitigation parcels, will be or have been devised or written. It does not appear that the proponents intend to develop quantifiable biological objectives, monitoring protocols to assess progress toward objectives, or an adaptive management framework for WMAs or mitigation parcels within them. In the 2009 ISRP review, concern was expressed about the lack of adequate monitoring and evaluation within this project. This concern persists. The ISRP believes that the proponents have a responsibility to demonstrate that mitigation parcels are being managed effectively within an adaptive management framework to benefit wildlife populations. IDFG is developing a statewide monitoring plan for WMAs which should be completed in a year. Will the statewide monitoring plan for WMAs include adaptive management processes? If not, can the statewide monitoring plan be modified to include them? |
|
Documentation Links: |
|
Assessment Number: | 1992-061-03-NPCC-20091217 |
---|---|
Project: | 1992-061-03 - Albeni Falls Wildlife Mitigation-Idaho Department of Fish and Game (IDFG) |
Review: | Wildlife Category Review |
Approved Date: | 5/31/2009 |
Recommendation: | Fund |
Comments: | Programmatic issues #1 (Biological assessment of Clark Fork River Delta), #2-3 # 10, and Project-Specific Issue for NHI (request for IBIS coordination funding). Removed capital request from this project (see Project 199206100). Sponsor to address ISRP qualification for reed canary grass prior to treatment. See ISRP recommendations. See project-specific comments for Albeni Falls Wildlife Mitigation. |
Conditions: | |
Council Condition #1 Programmatic Issue: New funding opportunities - expense | |
Council Condition #2 Programmatic Issue: Habitat Evaluation Procedure (HEP) - interaction between wildlife crediting and monitoring | |
Council Condition #3 Programmatic Issue: Habitat Evaluation Procedure (HEP) participation funding | |
Council Condition #4 Programmatic Issue: Regional Coordination funding |
Assessment Number: | 1992-061-03-ISRP-20090618 |
---|---|
Project: | 1992-061-03 - Albeni Falls Wildlife Mitigation-Idaho Department of Fish and Game (IDFG) |
Review: | Wildlife Category Review |
Completed Date: | 5/19/2009 |
Final Round ISRP Date: | None |
Final Round ISRP Rating: | Meets Scientific Review Criteria - In Part (Qualified) |
Final Round ISRP Comment: | |
The ISRP is concerned that the Agency's reed canary grass treatment described does not meet scientific review criteria. Before proceeding with attempts to treat reed canary grass, the ISRP requests that the Agency conduct a literature review, develop a weed control plan and submit the plan to the ISRP. The plan should not only address reed canary grass control but also plans to avoid potential cross contamination of sites. Part of the weed control plan should include a monitoring plan to evaluate reed canary grass treatment. After several vegetative cycles, the ISRP requests that results be reported and reviewed in the next review cycle.
|
|
First Round ISRP Date: | 3/26/2009 |
First Round ISRP Rating: | Response Requested |
First Round ISRP Comment: | |
The proponents have consistently implemented a variety of actions (land acquisition, habitat restoration, and revegetation) to mitigate and restore habitat. They are well organized and have taken a very professional approach over the years. The ISRP thought the agency did a good job of linking with students and the public, and found their differentiating between new and established weeds enlightened. There is much confusion regarding monitoring methodology that needs to be clarified in the response (see below). Project History and Results "On-site/in-kind mitigation opportunities with the Pend Oreille subbasin are allocated with the highest priority for the Project" (p.4). Is this priority based upon a strategic process or is this where opportunities are best in this subbasin? Please explain the strategy for project selection. On p. 17 the proponents state: "During 2006 - 2007, the four members of the Albeni Falls work group met to discuss possible strategies to allocate remaining habitat units. It was recognized that efforts by the work group members seemed to protect small parcels at a rate of two to five per year. Work group members believed that this rate of protection was not keeping up the rate of development. These discussions lead the work group members to consider strategies to settle the mitigation debt to BPA allowing more flexibility for entities to protect or enhance larger tracts of wildlife habitat. Through these discussions it became apparent that the four entities had, up to this point, different mitigation strategies for the Albeni Falls Wildlife Mitigation Project" The proposal would be improved by an explanation of this statement. What are the mitigation strategies used by the three key partners with IDFG (CDAT, KT, KTOI), and what are different scientific approaches being taken by each? More importantly do the approaches of the three key partners complement those of the sponsor? Regarding off-site and out-of-basin mitigation, more details on this are needed. Some information is given on page 28 but an example would be useful. Important baseline data are being obtained as the Albeni Dam is being decommissioned. For perspective, it would be useful to find out when this is planned. Can you offer explanations of why weed control was successful on some properties and not others. For example, Canada thistle was controlled in the meadows, but no details were given on how (page 21). Common tansy, common St. Johnswort, and spotted knapweed increased on 4 properties, decreased on 3 properties, and stayed the same on 2 properties. This is important information to share. Objectives, Work Elements, and Methods Please provide more detail on methods for weed control as in some instances only general statements are given stating that weeds will be controlled by spraying, pulling, mowing, or other means (Objective 3, work element a). On the same page they state methods prescribed by the USFS will be used but give no details about what they are. The USFS document cited in the other Albeni Falls proposals is significantly out of date. The sponsors are optimistic that reed canary grass will decline over time (p. 41). The proposal needs references to the literature that the methods they are using work or other evidence that this in fact will occur in their WMA. Similarly, the sponsors are optimistic that natural succession will occur (p. 47 "In general, natural succession can be expected to increase on WMA scrub-shrub wetland areas over the next several decades. The increase of scrub-shrub wetlands at the expense of pasture will be encouraged....” What methods will be used to "encourage"? In other instances such as Objective 2, work element 2, the methods statement is confusing, "Increase wetland diversity and density. Standardized methods will be used to innovative methods (blasting and heavy equipment scraping) improve wetland diversity and density by restoring micro-topography to areas." Please clarify. It appears the agency is using HAB, which is part of CHAP in collaboration with NHI for crediting. The sponsors are trying to get beyond # of acres as a metric by trying new habitat evaluation methods (e.g. using IBIS and KEF). Will these results be acceptable to BPA in these subbasins? The ISRP requests the agency provide more details on FTEs including position descriptions, location of individuals, and what the individuals will do on the project. M&E The ISRP commends the agency for including tables with % cover for various types of native and invasive vegetation as baseline data. There are a number of apparently contradictory statements about past and future monitoring. The ISRP found, with some digging, that monitoring is being done using the Idaho Plan (Unnasch et al. 2003) and suggests that Idaho Plan details be integrated into, or linked to the M&E section of the proposal. The agency seems to target some plant communities with photo records at permanent monitoring points (Unnash et al. 2003). The authors also state that they can't do population monitoring, but the Idaho Plans calls for some population monitoring. Please clarify this in your response. Page 37 states: "All monitoring data collection is conducted in a manner to detect that a 2.5% annual change over the span of ten years with a statistical power of 80%." The proposal would be improved by further explanation of how this methodology was decided upon and its statistical basis. Further, the proponents plan "Continued development of long-range, intensive biological survey methodologies in combination with guidelines that offer standardized use within the Albeni Falls wildlife management properties. We suggest the agency explore coordinating with the UWMEP project, so the data could be aggregated for all Albeni Falls projects. If the agency is not able to coordinate M&E efforts with UWMEP, an explanation would be helpful. Under the current plan (p.35) M&E is apparently restricted to vegetative monitoring or measurements necessary to estimate HUs for crediting. Is the vegetation sampling completed on all IDFG mitigation properties in 2004 and updated in 2007, and continued every 5 years at each sample point, the HEP sampling or effectiveness monitoring? The presentation suggested that HEP was analogous to effectiveness monitoring and that CHAP management scenarios are fact rather than estimates or hypotheses. This suggests the need to clarify monitoring strategy and results, as distinct from crediting. The ISRP requests a concise summary or tabulation of when and where monitoring is actually going to be conducted as well as quantitative information on trends (e.g., at least graphical analysis) in habitat restoration in the previous funding periods. Perhaps monitoring has not been done frequently enough to establish trends or statistically quantify differences, but if so it would be useful to have an explanation. It would be helpful to provide the methods for monitoring of the restored wetland at Albeni Cove (p.31) as the bottom of this site apparently may not self seal. The ISRP requests some M&E of the use of the GeoTube. The site visit raised many questions on the use of this technique to ameliorate wave action eroding wetlands. We also recommend development of M&E for water level manipulations |
|
Documentation Links: |
|
Assessment Number: | 1992-061-03-CAPITAL-20090618 |
---|---|
Project Number: | 1992-061-03 |
Review: | FY07-09 Solicitation Review |
Completed Date: | 2/27/2007 |
Capital Rating: | Does Not Qualify for Capital Funding |
Capital Asset Category: | None |
Comment: | None |
Name | Role | Organization |
---|---|---|
Virgil Watts III | Project Manager | Bonneville Power Administration |
Katey Grange | Interested Party | Bonneville Power Administration |
Susan Smith | Administrative Contact | Idaho Department of Fish and Game (IDFG) |
Ashlee Rudolph (Inactive) | Interested Party | Bonneville Power Administration |
David Kaplowe | Supervisor | Bonneville Power Administration |
Norm Merz | Technical Contact | Idaho Department of Fish and Game (IDFG) |
Pete Rust | Project Lead | Idaho Department of Fish and Game (IDFG) |
Edward Gresh | Env. Compliance Lead | Bonneville Power Administration |
Melissa Teoh (Inactive) | Interested Party | Bonneville Power Administration |