View and print project details including project summary, purpose, associations to Biological Opinions, and area. To learn more about any of the project properties, hold your mouse cursor over the field label.
Province | Subbasin | % |
---|---|---|
Columbia Cascade | Wenatchee | 100.00% |
To view all expenditures for all fiscal years, click "Project Exp. by FY"
To see more detailed project budget information, please visit the "Project Budget" page
Annual Progress Reports | |
---|---|
Expected (since FY2004): | 0 |
Completed: | 0 |
On time: | 0 |
Status Reports | |
---|---|
Completed: | 0 |
On time: | 0 |
Avg Days Late: | None |
Assessment Number: | 2007-085-00-NPCC-20090924 |
---|---|
Project: | 2007-085-00 - Upa Nason Creek Oxbow |
Review: | FY07-09 Solicitation Review |
Approved Date: | 10/23/2006 |
Recommendation: | Fund |
Comments: | ISRP fundable qualified: sponsor should consider the ISRP comments. $580,000 of the total project budget ($1.23M) to be funded from another source. |
Assessment Number: | 2007-085-00-ISRP-20060831 |
---|---|
Project: | 2007-085-00 - Upa Nason Creek Oxbow |
Review: | FY07-09 Solicitation Review |
Completed Date: | 8/31/2006 |
Final Round ISRP Date: | None |
Final Round ISRP Rating: | Meets Scientific Review Criteria (Qualified) |
Final Round ISRP Comment: | |
The ISRP is not requesting a response, but the proposal would be improved by addressing the following comments:
This project would reconnect a 0.6 mile-long oxbow that was created when state route 507 bisected Nason Creek. The proposal does a good job of describing the history of habitat alteration in Nason Creek, especially along its lower reaches. Using two long arch culverts, one at the inlet and one at the outlet of the oxbow, the site would become a large, slow flowing side-channel of the mainstream that would be connected at nearly all flows. Details of the reconnection project and the hydrological surveys were exceptionally well described. EDT analysis indicated that reconnecting this oxbow would increase Chinook productivity in the entire watershed by 25-50%. The technical background section described two alternatives for restoring this site, neither of which was preferred. Including this information was peripheral to the overall proposal and was not particularly helpful. Additionally, the background section did not provide any estimates of the number of Chinook or steelhead currently spawning in Nason Creek, or an estimate of the additional number of adults that might result from this restoration project, which could have been done using EDT. The proposal includes only plans for implementation modeling, but not effectiveness monitoring. This is unfortunate, because the restoration design is such that estimates of fish coming in and fish going out of either end of the oxbow could be obtained with appropriate traps, and PIT-tagging can be used to estimate downstream survival. This site would provide an excellent place to test the EDT model prediction of a 25-50% increase in Chinook smolt yield. Overall, the ISRP was impressed with this proposal. |
|
Documentation Links: |
|
Assessment Number: | 2007-085-00-INLIEU-20090521 |
---|---|
Project Number: | 2007-085-00 |
Review: | FY07-09 Solicitation Review |
Completed Date: | 10/6/2006 |
In Lieu Rating: | No Problems Exist |
Cost Share Rating: | None |
Comment: | Install arch culverts for oxbow reconnection, mixed private/federal land, assume no entity required to do so. |
Assessment Number: | 2007-085-00-CAPITAL-20090618 |
---|---|
Project Number: | 2007-085-00 |
Review: | FY07-09 Solicitation Review |
Completed Date: | 2/27/2007 |
Capital Rating: | Does Not Qualify for Capital Funding |
Capital Asset Category: | None |
Comment: | None |
Project Relationships: |
This project Merged To 2007-400-00 effective on 1/23/2008 Relationship Description: All work & budgets from projects 2007-042-00/Wenatchee Passage; 2007-085-00/Nason Creek Oxbow; and 2007-283-00/Wenatchee Access are combined into 2007-400-00. Original decision (4/26/07) was EXPENSE, combined they fit BPA's CAPITAL criteria. This decision made based on low capital projections. |
---|
Name | Role | Organization |
---|---|---|
Cecilia Brown (Inactive) | Project Manager | Bonneville Power Administration |
Carolyn Pearson (Inactive) | Project Lead | EcoA.I.M., Inc. |