Work Element 159: Transfer/Consolidate Regionally Standardized Data - Published
WE Name:
159. Transfer/Consolidate Regionally Standardized Data (Submit/Acquire Data)
Work Category:
RM & E and Data Management
WE Agreement Type:
Contracted
Status:
Active
Definition:
This work is for transferring or reformatting data from one spreadsheet/database to another, typically primary data from a field or lab site to a higher-level, secondary regional or national database. This may also include derived data if such data are calculated by entities other than the secondary database. It includes both the act of sending and receiving, hardware/software needs for automated uploads/downloads (e.g., transmission and relay links for regular nightly uploads from remote telemonitoring sites), the development and application of data exchange protocols (including QA/QC), and any formatting and documentation required to make the transfer. It does not include initial data entry but it does include manipulating (e.g., reformatting and, if appropriate, georeferencing) data at the receiving end.

This work element explicitly reinforces the importance of transferring data to databases where they will be maintained and accessible. Capturing data above the field or lab level includes acquisition in electronic formats, entering data into a computer from historical records, digitizing images, and other methods for converting information to digital format for later dissemination or analysis. This work element may include generating secondary/derived data when those data are stored in regional databases for access and use by other parties.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
monitoring/evaluation
Sort Sequence:
13.05
Focal Species Required:
Yes
RM&E Metadata Required:
Yes
Finite or Recurring:
Recurring
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
No


Deliverable Status:
Required
Default Deliverable Desc:
Populated Database
Potential Deliverables:

  • Rule 1 (Metrics): Use this work element when the effort/costs of data transfer and consolidation are significant relative to the purpose of the data collection itself. Otherwise, transfer/consolidation could be a milestone under the work element associated with the purpose (usually 157. Collect/Generate/Validate Field and Lab Data).

    Examples:

    Option 1 (lumping):

    WE: 158. Mark/Tag Animals
    WE Title: Mark 150,000 hatchery spring Chinook and transfer PIT tag data to PTAGIS
    WE Description: PIT tag 150,000 spring Chinook smolts at Cold Creek Hatchery prior to acclimation and release. Upload PIT tag data files to PTAGIS system to allow tracking of smolts downstream.

    Option 2 (splitting):

    WE: 158. Mark/Tag Animals
    WE Title: PIT tag 1.2 million hatchery fish
    WE Description: PIT tag 200,000 summer Chinook smolts, 450,000 spring Chinook smolts, and 550,000 steelhead at Cold Creek Hatchery prior to acclimation and release.

    WE: 159. Transfer/Consolidate Regionally Standardized Data
    WE Title: Upload PIT tag data to PTAGIS
    WE Description: Check and upload PIT tag data for 200,000 summer Chinook smolts, 450,000 spring Chinook smolts, and 550,000 steelhead as fish are tagged throughout the year.


2 Metrics Associated With Work Element 159: Transfer/Consolidate Regionally Standardized Data

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1464: Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] Active RMEFocalAreaList 2022 Required Yes No No
1495: Secondary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] Active RMEFocalAreaList 2022 Required Yes No No

Location Requirement Type:
No Location

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #159 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Deborah Docherty (Inactive) 80
Tracy Hauser 77
Jonathan McCloud 60
David Byrnes (Inactive) 56
Richard Golden Jr (Inactive) 47
Average Work Element Budget: $27,281
Average Duration: 9 months