This page presents detailed associations and definitions for this Work Element. Information on how this Work Element is being used in BPA field work is also included.
Provision of water supply for livestock that is out of the water zone and at a distance beyond that which may affect the conditions of the water body. Includes, but not limited to, watering troughs, spring and well development, and guzzler installation.
Rule 2 (Location of Work):
If you are constructing alternative water source facilities at more than one location, you may lump multiple locations in a single subbasin under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management. Note that different locations do not need to be separated into multiple environmental compliance work elements. Please note: If you work in multiple subbasins, you must use a separate work element for each subbasin, but you may have multiple locations within each subbasin.
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Prioritize and plan site
Suggested
No
Negotiate and create agreements with landowners
Suggested
No
Complete and submit bid packages
Suggested
No
Select contractor
Suggested
No
Complete construction of the alternative water source facility
Identify point at location of installation. You may enter more than one point for this work element. If a location already exists in Pisces, click the "Link" button to synchronize locations.
Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab
for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information
in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.
Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the
contract being finalized, and may be revised depending on the specific circumstances.
National Environmental Policy Act (NEPA)
NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
Endangered Species Act (ESA)
ESA consultation is typically required for this work element.
National Historic Preservation Act (NHPA)
NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.
Public Involvement
Public involvement is typically not required for this work element.
This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.
Overview:
Summarizes annual accomplishments of the Habitat portion of the Program in terms of measures or metrics. Includes several tables focused on different dimensions: Habitat Zone, NPCC Province and Subbasin, ESU. Report can be filtered by Fiscal Year, Province or Subbasin, Work Element, Work Status, or Fish Species (ESU) benefitted.
Dimensions:
Habitat Measures, Metrics, Planned and Actual Metric Value, Fiscal Year, Habitat Zone, Work Element, Work Status, NPCC Province, NPCC Subbasin, ESU
Overview:
Shows the estimated spending by Focal Species – various anadromous and resident fish and general wildlife category – by fiscal year. Since contractors don’t invoice BPA by work element, much less by focal species, this report allocates project costs by the proportion of the work element budgets and the focal species associated with each work element. This report has two tables: Spending by all Focal Species, and Spending by ESA-Listed Focal Species (a table that allows BPA to meet federal reporting requirements).
Dimensions:
Focal Species, ESA-Listed Fish Species, Direct Spending, Contract Administration Spending, Program Administrative Spending, Account Type (Expense, Capital), Work Element Budgets
Overview:
Rolls up program funding across time by work class such as Habitat, Hatchery, Research Monitoring and Evaluation, Local & Regional Coordination, etc. Includes summary and detail pie charts showing funding levels for various types of work. Provides drill-downs to work element detail.
Dimensions:
Work Class, Work Element, Work Element Budget, Account Type (Expense or Capital), NPCC Province, NPCC Subbasin
Stats and Overview
Number of active contracts using Work Element #34 by FY
Top 5 BPA Project Managers using this Work Element: