Work Element 34: Develop Alternative Water Source - Published
WE Name:
34. Develop Alternative Water Source (Dev Alt Wtr Src)
Work Category:
Habitat - Habitat Improvement
WE Agreement Type:
Contracted
Status:
Active
Definition:
Provision of water supply for livestock that is out of the water zone and at a distance beyond that which may affect the conditions of the water body. Includes, but not limited to, watering troughs, spring and well development, and guzzler installation.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
construction/implementation
Sort Sequence:
5.05
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
Yes


Deliverable Status:
Required
Default Deliverable Desc:
Alternative Water Source
Potential Deliverables:
  • Alternative water source facilities

  • Rule 1 (Environmental Compliance): Any associated ESA, cultural resources, NEPA, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.

    Example:

    WE: 34. Develop Alternative Water Source
    WE Title: Develop alternative water source facilities at Johnson site

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Provide documentation to BPA for alternative water source facilities at Johnson site

  • Rule 2 (Location of Work): If you are constructing alternative water source facilities at more than one location, you may lump multiple locations in a single subbasin under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management. Note that different locations do not need to be separated into multiple environmental compliance work elements. Please note: If you work in multiple subbasins, you must use a separate work element for each subbasin, but you may have multiple locations within each subbasin.

    Examples:

    Option 1 (lumping):

    WE: 34. Develop Alternative Water Source
    WE Title: Develop watering troughs and guzzler at Johnson and Smith sites

    Option 2 (splitting):

    WE: 34. Develop Alternative Water Source
    WE Title: Develop watering trough at Johnson site

    WE: 34. Develop Alternative Water Source
    WE Title: Develop guzzler at Smith site


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Prioritize and plan site
Suggested
No
Negotiate and create agreements with landowners
Suggested
No
Complete and submit bid packages
Suggested
No
Select contractor
Suggested
No
Complete construction of the alternative water source facility
Suggested
No


3 Metrics Associated With Work Element 34: Develop Alternative Water Source

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1765: # of alternate water sources installed in the upland Active number 2011 Required Yes No No
1766: # of alternate water sources installed in the riparian Active number 2011 Required Yes No Yes C.5.f.2 Number of water gap installations
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Timing of flow enhancement
1569: # of alternate water sources installed Expired number 2010 2010 Required Yes No No
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Timing of flow enhancement

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.5 Riparian Habitat Project
        C.5.f.1 Water gap development
            C.5.f.2 Number of water gap installations
1766: # of alternate water sources installed in the riparian

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1 - 100
Location Guidance:
Identify point at location of installation. You may enter more than one point for this work element. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #34 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Jamie Cleveland (Inactive) 24
Andre L'Heureux (Inactive) 21
Sarah Branum (Inactive) 18
John Baugher (Inactive) 16
Joe Deherrera (Inactive) 16
Average Work Element Budget: $16,344
Average Duration: 10 months