Work Element 66: Trap/Collect/Hold/Transport Fish - Hatchery - Published
WE Name:
66. Trap/Collect/Hold/Transport Fish - Hatchery (Trap Fish - Hatchery)
Work Category:
Hatchery - Hatchery O&M - One or more focal species
WE Agreement Type:
Contracted
Status:
Active
Owner:
Definition:
Includes work performed under contracts solely for trapping, collecting, transporting, and/or holding fish (all life history stages) for inclusion in a fish culture program. If the full range of fish culture activities is performed under a contract, use 176. Produce Hatchery Fish, with milestones for trapping, collecting, transporting, and/or holding fish, as appropriate.
WSE Description Template:
Effective Dates:
FY2005 to <no end date>
Work Phase:
operations/maintenance
Sort Sequence:
6.02
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Recurring
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
No

  • If the full range of fish culture activities is performed under a contract, use 176. Produce Hatchery Fish.
  • Any use of 66. Trap/Collect/Hold/Transport Fish - Hatchery requires an annual production plan for those fish. Use 174. Produce Plan - Hatchery Production Plan to cover work to develop this plan. The plan will cover all species trapped/collected/held/transported under the contract. For each species, where applicable, the plan will include a forecast for the next adult return and the number retained for broodstock, disposition of excess fish, assumptions about survival between life stages, number of individuals to be released at each life-stage, transportation, and acclimation plans, etc. The plan will be provided electronically to co-managers and attached in Pisces to the contract under which the fish are reared.
  • For contracts that also include 61. Maintain Artificial Production Facility/Infrastructure, where an annual maintenance plan is required, the annual production plan(s) and the maintenance plan may be combined into a single document titled "Annual Operating Plan" (AOP).
  • Maintenance of a trapping/collection/holding facility is covered under 61. Maintain Artificial Production Facility/Infrastructure
  • All put and take fishery work is covered under 187. Put and Take Fisheries.
  • 165. Produce Environmental Compliance Documentation must also be used in the SOW to describe environmental compliance activities necessary for this activity.

Deliverable Status:
Required
Default Deliverable Desc:
Fish
Potential Deliverables:
  • Number and species of fish trapped/collected/held/transported. Location where they are trapped, collected, or held. Locations where they are transported to and from.

  • Rule 1 : Any ESA, NEPA, permitting, or other environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.

    Example:

    WE: 66. Trap/Collect/Hold/Transport Fish - Hatchery
    WE Title: Operate adult fish trap at Elk Creek.

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Obtain local permits & ESA compliance for operation of the adult fish trap at Elk Creek.

  • Rule 2 (Location of Work): If the trapping program includes multiple locations and/or species, you may lump them into a single work element. However, you may wish to break the work into separate work elements for each location if it helps provide clarity for project management purposes.

    Examples:

    Option 1 (lumping):

    WE: 66. Trap/Collect/Hold/Transport Fish - Hatchery
    WE Title: Fish trapping, transfers, and planting in Cold River and Fast River basins
    WE Description: Operate spring and summer Chinook traps at RM 4 and transport adults to Happy Fish Hatchery for spawning. Transport juveniles to acclimation sites on Cold River at RM 7 and RM 16 and Fast River at RM 12 and RM 21.

    Option 2 (splitting):

    WE: 66. Trap/Collect/Hold/Transport Fish - Hatchery
    WE Title: Operate Elk Creek spring Chinook trap.
    WE Description: Operate trap and transport spring Chinook adults to Happy Fish Hatchery for spawning.

    WE: 66. Trap/Collect/Hold/Transport Fish - Hatchery
    WE Title: Operate Deer Creek summer Chinook trap.
    WE Description: Operate trap and transport summer Chinook adults to Happy Fish Hatchery for spawning.

    WE: 66. Trap/Collect/Hold/Transport Fish - Hatchery
    WE Title: Transport summer Chinook juveniles for acclimation in Deer Creek.
    WE Description: Transport summer Chinook juveniles from Happy Fish Hatchery to acclimation site on Deer Creek.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Environmental Compliance followed for duration of work element
Suggested
No
Contractor and sub-contractors shall adhere to all mitigation and conservation measures, terms and conditions, avoidance areas, and best management practices required under environmental laws as directed by BPA.
Trap operation - dates
Suggested
No
Transport adults
Suggested
No
Transport juveniles
Suggested
No
Transport eggs
Suggested
No


10 Metrics Associated With Work Element 66: Trap/Collect/Hold/Transport Fish - Hatchery

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1410: Purpose of production program [Supplementation, Harvest Augmentation, Research] Active ProductionProgramPurposeList 2005 Required Yes No No
1489: Secondary purpose of production program (if any) [Supplementation, Harvest Augmentation, Research] Active ProductionProgramPurposeList 2009 Optional Yes No No
1426: # eggs (hatchery origin) Expired number 2005 2010 Required Yes No No
1427: # eggs (natural origin) Expired number 2005 2010 Required Yes No No
1428: # ad-clip (hatchery origin) smolts Expired number 2005 2010 Required Yes No No
1429: # non-clip (natural origin) smolts Expired number 2005 2010 Required Yes No No
1430: # ad-clip (hatchery origin) juveniles (presmolt) Expired number 2005 2010 Required Yes No No
1431: # non-clip (natural origin) juveniles (presmolt) Expired number 2005 2010 Required Yes No No
1432: # ad-clip (hatchery origin) adults Expired number 2005 2010 Required Yes No No
1433: # non-clip (natural origin) adults Expired number 2005 2010 Required Yes No No

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1 - 100
Location Guidance:
You may enter more than one point for this work element to describe multiple collection, holding, and release sites. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #66 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Jonathan McCloud 54
Eric McOmie 36
Tracy Hauser 32
Deborah Docherty (Inactive) 30
Roy Beaty (Inactive) 28
Average Work Element Budget: $57,490
Average Duration: 8 months